ML17252A519
| ML17252A519 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/04/1974 |
| From: | Stephenson B Commonwealth Edison Co |
| To: | James Keppler US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17252A519 (1) | |
Text
c
(-
r c
(
(
t*--* ----- -
19 711 J /I: I - lt D II -
1vEc302 c 113-95 L~ i_-039 s15 CJ~5_>_PJ) _ <t(;L~AL?-4 --1-so2_~,,*i--b~-os--- -------- --- --
ICS IPMVEIC MVN 03232 TDVE MORRIS IL 121 06-04 250P CDT PMS JAMES G KEPPLER 3-~ J._53 DIRECTORIATE OF REG.ULATORY OPERATIONS REGIONAL DIRECTOR TELEGRAMS (OTHER THAN MONEY ORDERS)
REG ION 3 Is PHYSICAL DELIVERY requested? ___ (YES-AGENT, NO-ADDRESSEE}
US ATOMIC ENERGY COMM IS S IOtN -* * ~ECTION ADDRESS~E SS§T/I-Oll _,Y.-? ~J. u;(,
- x r~._, l I ".~ame Nor.,-")_ d
- Q..
WU L* { t.:.id. /o:Z-s-Time <lld//,.C 71-To Q,G By /Le./
- ail.8d or filed GLENELLY N IL 6013 7
/~~ 11l.i.ip~~.. !\\;;i~~H~~ (I~di_cat~ DA Qr BY)
~
- ¥+'%.... wftD'*"l.s r t:eif zs-04r> <
. I SUBJECT DPR-25 9 DRES9EN NUCLEAR POWER STATION UNITE 3.
THIS WILL CONFIRM A.CONVE~SATION WITH F. MAURA OF YOUR OFFICE AT 1330 HOURS THIS BATE CONCERNING THE DISCOVERY-DURING
'. ~,
SF-1201 (RS-69) 1(
(_
- c.
1971i JUN -4 PH S: OS ROUTINE CALIBRATION THAT THE SET POINTS OF THE SWITCHES WHICH ISOLATE TH& HIGH PRESSURE COOLANT-INJECTION CHPCI> SYSTEM WERE SUCH THAT THE (HPCI> *SYSTEM WOULD NOT HAVE BEEN' AVAILABLE AT A REACTOR PRESSURE OF LESS THAN 90 PSIG AS REQUIRE~ BY SECTION 3.5.C.l OF THE TECHNICAL SPECIFICATION.
THE SWITCHES WERE IMMEDIATELY RESET TO OPERATE AT THE PROPER VALUES.
ADDITIONAL DETAILS ARE FORTHCOMING IN THE FORM OF A 10 DAY LETTER IN ACCORDANCE WITH SECTION 6.6.B.1.A Or THE TECHNICAL SPECIFICATIONS B.8 STEPHESNON, SUPERINTENDANT D.RESDEN NUCLEAR POWER STATION CO Mf110 NWEAL TH ED I SON CO MP ANY
,l_
\\
~...
- *~
'1 RR Ht
~ SF-1201 (R5-69)
/34/
. *-';