Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
HCH-2006-045, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for August 2006 | 20 September 2006 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for August 2006 | NJPDES |
LR-N05-0021, Revised Backup Stability Protection Evaluation Report | 12 January 2005 | Revised Backup Stability Protection Evaluation Report | |
LR-N05-0258, Request for License Amendment Extended Power Uprate | 7 November 2005 | Request for License Amendment Extended Power Uprate | |
LR-N05-0275, Supplemental Report of Changes, Tests, and Experiments, Hope Creek Generating Station | 13 May 2005 | Supplemental Report of Changes, Tests, and Experiments, Hope Creek Generating Station | Turbine Missile |
LR-N06-0413, Supplement to License Amendment Request for Extended Power Uprate | 10 October 2006 | Supplement to License Amendment Request for Extended Power Uprate | Finite Element Analysis Flow Induced Vibration |
LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. | 31 January 2007 | C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. | Flow Induced Vibration |
LR-N07-0298, C.D.I. Report No. 04-09NP, Revision 6, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes. | 31 March 2005 | C.D.I. Report No. 04-09NP, Revision 6, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes. | |
LR-N08-0033, CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model. | 31 January 2008 | CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model. | Finite Element Analysis Liquid penetrant Flow Induced Vibration |
LR-N08-0123, C.D.I. Technical Note No. 07-29NP, Revision 2, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Hope Creek Unit 1. | 31 May 2008 | C.D.I. Technical Note No. 07-29NP, Revision 2, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Hope Creek Unit 1. | Finite Element Analysis |
LR-N08-0199, Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1. | 31 August 2008 | Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1. | Finite Element Analysis |
LR-N08-0199, Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions. | 31 August 2008 | Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions. | Finite Element Analysis Liquid penetrant |
LR-N08-0224, Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 | 31 October 2008 | Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 | Finite Element Analysis |
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 | 31 October 2008 | Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 | Finite Element Analysis Liquid penetrant |
LR-N10-0239, 0000-0119-1728, Revision 0, Hope Creek Cycle 17 Stability Results for GE14i Support, Attachment 1 | 30 June 2010 | 0000-0119-1728, Revision 0, Hope Creek Cycle 17 Stability Results for GE14i Support, Attachment 1 | |
LR-N11-0289, Site-Specific Cost Estimates | 15 September 2011 | Site-Specific Cost Estimates | Fuel cladding Fire Watch Scaffolding |
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | 30 November 2012 | Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | |
LR-N14-0024, Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | 29 January 2014 | Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) | 30 September 2015 | NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) | |
LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. | 30 September 2015 | NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. | |
LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. | 31 August 2016 | NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. | Safe Shutdown Earthquake Operating Basis Earthquake Cyber Security |
LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve | 31 December 2016 | Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi | |
LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) | 31 March 2017 | Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) | |
LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | 28 April 2017 | Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | Pressure and Temperature Limits Report |
LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary | 9 November 2017 | License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary | Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
LR-N18-0057, Pressure and Temperature Limits Report, Revision 1 | 8 June 2018 | Pressure and Temperature Limits Report, Revision 1 | Pressure and Temperature Limits Report |
ML030410289 | 31 January 2003 | Document Transmittal Form, EPIP059, List of Updated Documents, Table of Contents - Figure 1-2 | High Radiation Area Grab sample Offsite Dose Calculation Manual Met Tower |
ML030520269 | 15 February 2003 | Follow-up Report, Reference Event #39516 | |
ML041460481 | 21 May 2004 | Attachment to 5/21/04 PSEG Ltr - USA Final Report - PSEG Nuclear, LLC Salem / Hope Creek Safety Culture Assessment | Boric Acid Enforcement Discretion Scaffolding |
ML043010563 | 30 September 2004 | GENE-0000-0029-6193-02-R0, Bsp Evaluation Report, Ellla Backup Stability Protection Evaluation for Hope Creek Cycle 13. | |
ML043450429 | 9 September 2004 | FEMA Final Exercise Report for the 03/16/2004 Salem/Hope Creek Nuclear Power Station Plume Pathway Exercise Letter Dtd 09/09/2004 | Offsite Dose Calculation Manual Fuel cladding |
ML050050111 | 12 December 2004 | H-1-FD-CEE-1879, Hope Creek HPCI Exhaust Piping Supports Analysis Reported Damage in RF12. | |
ML050050470 | 16 December 2004 | H-1-BB-MEE-1878, Hope Creek 'B' Recirculation Pump Vibration Analysis, Revision 1 | Coast down |
ML050060025 | 15 April 2003 | CR 70029861 Hope Creek 'B' Recirculation Pump Excessive Seal Leakage Condition Report, 03/01/2003 | Hydrostatic Temporary Modification Power change Downpower |
ML050060041 | 26 December 1995 | H-1-BB-MEE-1050 Hope Creek Recirculation System Large Bore Pipe Cracking Resolution, 12/26/1995 | |
ML050060054 | 19 October 2004 | Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004 | Safe Shutdown Fire Barrier Stroke time Hydrostatic Met Tower NJPDES Incorporated by reference Fuel cladding Fire Protection Program Scaffolding Loctite Flow Induced Vibration |
ML050060110 | 10 December 2004 | Design Change Package 80062466 Revision 2 Extended Power Uprate Piping Vibration Monitoring Installation Package, 12/10/2004 | |
ML050060114 | 23 December 2004 | Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004 | Safe Shutdown Fire Barrier Stroke time Hydrostatic Met Tower NJPDES Incorporated by reference Control of Heavy Loads Fuel cladding Fire Protection Program Scaffolding Loctite Flow Induced Vibration Power Uprate |
ML050140232 | 12 December 2004 | H-1-BB-MEE-1878, Rev 0, Hope Creek 'B' Recirculation Pump Vibration Analysis, 12/12/2004 | Hydrostatic Coast down |
ML050140245 | 26 October 2004 | Flowserve RAL-7482 Rev 0 Design Modification Report Assy 93-15122, 10/26/2004 | |
ML050140247 | 26 October 2004 | Flowserve RAL-7483 Rev 0 Design Modification Report Assy 93-14347, 10/26/2004 | |
ML050140253 | 29 April 2004 | HC-04Q-301 Hope Creek Extended Power Uprate Piping Vibration Monitoring, 4/29/2004 | Scaffolding |
ML050980173 | 5 April 2005 | PSEG Nuclear LLC Hope Creek Station B-Reactor Recirculation Decontamination Connection Leak Cause Determination Report Notification No. 20230319, Event Date: March 27. 2005 | Finite Element Analysis Liquid penetrant Through-Wall Leak |
ML051790161 | 31 May 2005 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report Hope Creek Generating Station | NJPDES |
ML053200206 | 30 November 2005 | Attachment 12, EDO-33075, Class 1, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate. | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Ultimate heat sink Mission time Stroke time Anticipated operational occurrence Time to boil Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Significance Determination Process Feedwater Controller Failure Large early release frequency MELLLA Earthquake Hardened vent Fuel cladding Fire Protection Program Power change Flow Induced Vibration Power Uprate Failure to Scram |