Issue date | Title | Topic | |
---|---|---|---|
ML18043A959 | 31 May 1974 | Hazards Analysis Rept for State of Mi,By Mi Dept of State Police.Oversized Map Encl | High winds Coatings Earthquake |
ML18045A904 | 5 September 1980 | LER 80-022/03L-0:on 800807,during Monthly Specific Gravity Checks,Cells 38,39 & 56 of Reactor Depressurizing Battery for Channel C Had Low Readings.Cause Not Known.Cell Units 13 & 19 Replaced.Channel C Restored on 800813 | |
ML18047A322 | 27 April 1982 | Hot License Program - Reactor Operator. | Fuel cladding Power change |
ML18047A323 | 3 May 1982 | Hot License Program - Senior Reactor Operator. | |
ML18058B882 | 15 June 1993 | Rev 13 to Quality Program Description for Operational Nuclear Power Plants. | Probabilistic Risk Assessment Coatings Nondestructive Examination Fire Protection Program |
ML20054F768 | 15 June 1981 | Telecopy Message of Ro:On 820611,electrical Fire in turbine- Generator Exciter Forced Shutdown of Reactor.No Radiological Release or Injuries to Employees.Fire Controlled in 1/2-h. Extensive Damage to Exciter Brushers | |
ML20054K488 | 30 June 1982 | Assessment of Possible Amplification.Original Spectra Recommended for Facility Still Appropriate | |
ML20054L859 | 2 July 1982 | Safety Evaluation Supporting Request for Continued Operation Based on Spent Fuel thermal-hydraulic Analysis | |
ML20055A677 | 26 May 1982 | Telecopy Message of Ro:On 820525,multiple Minor Through Wall Tube Leaks Discovered in B Heating & Cooling Hx,Initially Reported 820526.HX Valved Out of Svc Pending Completion of Repairs | |
ML20055B094 | 8 July 1982 | Special Rept 30,1982 Inservice Insp 8 on 820208-0325. Describes Exams Performed on Various Components of Portions of NSSS & Support Piping | |
ML20055D865 | 30 June 1990 | Monthly Operating Rept for June 1990 for Big Rock Point Nuclear Plant | |
ML20056A740 | 31 July 1990 | Monthly Operating Rept for Jul 1990 for Big Rock Point Nuclear Plant | |
ML20056E166 | 16 August 1993 | Safety Evaluation Supporting Amend 110 to License DPR-6 | |
ML20056E517 | 31 August 1993 | Technical Review Rept, Tardy Licensee Actions | |
ML20056G917 | 31 August 1993 | Monthly Operating Rept for Aug 1993 for Big Rock Point Nuclear Plant | |
ML20057E198 | 5 October 1993 | Safety Evaluation Supporting Amend 111 to License DPR-6 | |
ML20057E834 | 30 September 1993 | Monthly Operating Rept for Sept 1993 for Big Rock Point Nuclear Plant | |
ML20057G151 | 7 October 1993 | Part 21 Rept Re Westronics Model 2100C Series Recorders. Informs That Over Several Tests,Observed That Recorder Would Reset During Peak Acceleration & Door Being Forced Off Recorder.Small Retaining Clips Added to Bottom of Door | |
ML20058A160 | 15 November 1993 | Safety Evaluation Supporting Amend 112 to License DPR-6 | |
ML20058A378 | 24 March 1981 | Partially Withheld Affirmation Secy That Recommends Commission Approval of Encl Draft Order Referring J Leithauser Motion Requesting Correction of Allegedly Erroneous ASLAP Statement Back to ASLAP | |
ML20058A458 | 9 April 1981 | Partially Withheld Affirmation Secy That Recommends Commission Approval of Encl Draft Order Referring J Leithauser Motion Requesting Correction of Allegedly Erroneous ASLAP Statement Back to ASLAP | |
ML20058A508 | 13 May 1981 | Partially Withheld Notation Vote Secy That Informs Commission of Appeal Board Decision | |
ML20058C530 | 21 June 1982 | Valve Comparison Between 3M26 HCU-65 Spec Safety Valve & 3M26 HC-75 Safety Valve | |
ML20058E402 | 31 October 1990 | Monthly Operating Rept for Oct 1990 for Big Rock Point Nuclear Plant | |
ML20058E896 | 29 November 1993 | 1993 ISI Rept 3-1 Big Rock Point Plant, for 930626-0905 | |
ML20058F338 | 15 October 1990 | QA Program Description for Operational Nuclear Power Plants | |
ML20058F344 | 22 November 1993 | Safety Evaluation Concurring W/Contractor Findings Presented in Technical Evaluation Rept EGG-RTAP-10816, Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01;Big Rock Point | |
ML20058G598 | 17 November 1993 | Part 21 Rept Re Westronics Recorders,Model 2100C.Signal Input Transition Printed Circuit Board Assembly Redesigned to Improve Recorder Immunity to Electromagnetic Interference.List of Affected Recorders & Locations Encl | |
ML20058H685 | 14 November 1990 | Special Rept:On 901024,high-range Noble Gas Monitor Inoperable for More than 72 H | |
ML20058K093 | 30 November 1993 | Monthly Operating Rept for Nov 1993 for Big Rock Point Nuclear Plant | |
ML20058L872 | 31 December 1992 | 1992 Annual Rept,Cpc | |
ML20059E818 | 31 August 1990 | Monthly Operating Rept for Aug 1990 for Big Rock Point Nuclear Plant | |
ML20059E832 | 31 December 1993 | Monthly Operating Rept for Dec 1993 for Big Rock Point Nuclear Plant | |
ML20059F258 | 31 August 1990 | Safety Evaluation Approving Licensee Proposal to Dispose of Discharge Canal Dredgings Onsite in Manner Described in Util | |
ML20059H605 | 11 September 1990 | Safety Evaluation Approving Util 891229 Application for Disposal of Discharge Canal Dredging Spoils at Site | |
ML20059J453 | 31 October 1993 | Monthly Operating Rept for Oct 1993 for Big Rock Point Nuclear Plant | |
ML20059L025 | 31 August 1990 | Corrected Monthly Operating Rept for Aug 1990 for Big Rock Point Plant | |
ML20059N341 | 30 September 1990 | Monthly Operating Rept for Sept 1990 for Big Rock Point.W/ | |
ML20062F114 | 31 October 1990 | Revised Simulation Facility Application | |
ML20062H428 | 12 March 1962 | Specs for Design,Furnishing,Erection & Testing of Containment Vessel for Big Rock Point Plant, Revision 4, Spec 3159-C-1 | |
ML20126A450 | 10 June 1985 | Safety Evaluation Supporting Amend 75 to License DPR-6 | |
ML20126E115 | 18 July 1974 | Safety Evaluation Supporting Amend 6 to License DPR-6 | |
ML20126E125 | 30 September 1977 | NRC Supplemental Staff Position on Personnel Search Requirements. Outlines Acceptable Methods for Satisfying Search Requirements of Personnel at Points of Access to Protected Area | |
ML20126E165 | 19 December 1975 | Safety Evaluation Supporting Amend 9 to License DPR-6, Deleting Recordkeeping & Reporting Requirements That Are Being Transferred to Tech Specs | |
ML20126E187 | 5 November 1974 | Safety Evaluation Analyzing Consequences of High Energy Piping Failures Outside Containment | Safe Shutdown |
ML20126E347 | 9 August 1966 | Ro:On 660808,after Reactor Trip Due to Lightning,Turbine Generator Did Not Trip & Continued to Carry Facility Power from Residual Steam in Primary Sys,Reducing Reactor Pressure.Caused by Bypass Valve Malfunction |