Text
.
W N
CDDSumBIS
, POWBr Patrick M Donnetty
%%~"V' ;$
Plant Afanager PGWERING MICHIGAN 5 PROGRESS Beg Rock Purnt Nuclear Plant,10709 US-31 North. Char 6evoia. MI 49720 December 1, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period of November 1, 1993 through November 30, 1993.
Since ely,
/
~
b
/7L % <
P M Donnelly
)
Plant Manager Enclosures cc: Administrator Region III, Nuclear Regulatory Commission DRHahn, Department of Public Heath l
JRPadgett, Michigan Public Service Commission j
RAben, Michigan Department of Labor MPCass American Nuclear Insurers FYost, Research Services Utility Data Institute INPO Records Center NRC Resident Inspector Document Control, Big Rock Point, 740/22*35*10 DPHoffman, P24-117A GCWithrow, Big Rock Point File i
100'Uiu nh 9312140396 931130
.i< y l PDR ADOCK 05000155 4
P R
PDR bl A CMS EME7?GY COMPANY I
Consumers Power NUCLEAR OPERATIONS DEPARTMENT Company Unit Shutdowns and Power Reductions Report Month Docket Number Unit Date Completed by Telephone Morreber, 1993 55-150 Big Rock Point Plant December I, 1993 JR 20tlNSTOM (616) 5.
~8223 Method of Shutting Duration Down Licensee Event System Component I
4 S
Number Date Type (Hours)
Reason Reactor Report Number Code M
Cause end Corrective Action To Prevent Flecurrence
N
- - + - -
yoxR
--+
+
4 I
2 3
4 F = Forced Reason:
Method:
Exhibit G = Instructions for S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preparation of Data Entry Sheets B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER)
C = Refueling 3 = Automat:c Scram File (NUREG-0161)-
D = Regulatory Restriction 4 = Other (Explain)
E = Operator Training and License Examination 5Exhibit i = Same Source F = Administrative G = Operational Error (Explain).
H = Other (Explain)
Form 3156 1-82
. ~..
~
~.
4
=
- 1 STATS VERSION 93.001; EA 8 STATS-93-001 10/03/93 RUNTIME=12/01/93 13:19:27 Page 4 ef 9 i
l GRETBOOK OPERATING DATA REPORT DOCKET No. 50-155 DATE: 12 / 1 / 93 BY: JR JOHNSTON OPERATING STATUS PHONE: 616-547-6537, EXT 223
- 1. UNIT NAME: BIG ROCK POINT NUCLEAR PLANT NOTES:
- 2. REPORTING PERIOD:
11 / 93
- 3. LICENSED THERMAL POWER (MWT):
240 l
- 4. NAMEPLATE RATING (GROSS 9'WE):
75
- 5. DESIGN ELECTRICAL RATING (NET MWE):
72
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
71.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET mkt):
67.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (lTEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
=
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 8016.0 268915.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6214.8 194374.4
- 13. REACTOR RESERVE SHUTDCWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 6189.5 191335.2
- 15. UNIT RESERVE SHUTOOWN HCURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWM) 161256.0 1238704.0 36733411.0
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 51427.0 395756.0 11667841.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 48852.7 374501.9 11037682.3
- 19. UNIT SERV!CE FACTOR 100.0%
77.2%
71.2%
- 20. UNIT AVAILABillTY FACTOR 100.0%
77.2%
71.2%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) -
101.3%
69.7%
61.0%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 94.2%
64.9%
57.0%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
11.3%
I l
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,DATE, & DURATION CF EACH):
l l
[
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATEDDATE OF STARTUP:
i l
l i
.-->m
--.--w
.--..z-.-o
..m
-. -. - -.. - ~,... <
., -. - ~. - -. - -,. - - - - - -. - - -
. ~
.-m
~,
1 STATS VERSION 93.001,* EA-8-STATS *93-001 10/03/93 RUNTIME=12/01/93 13:19:27 Page 2 of 9
- ~
j DAT
, AVERAGE DAILY PCNER(MWT)
(MWEN)
(11/93) - CYCLE 27 1
223.58-47.65 2.
223.21 67.60 3-223.92 67.29 4
222.13 67.24 5
207.54 63.53 6
222.75 67.18 7
222.29 67.14 8
224.21
'67 63 9
226.46 67.92 10 224.42 68.25 11 225.21 68.09 12-
.225.96 67.89 13
-223.79 67.85 14 224.29 67.73 15 223.58 67.72 16 225.42 68.01 17 225.33 68.33 18 225.54 60.21 i
19 224.21 68.04 20 224.00 67.87 21
'226.50 68.70 22 226.50 68.65 23 226.17 68.48 24 226.79 68.44 25 223.79 68.54 26 224.58 68.50 27 223.67.
' 68.30 t
28 223.75 68.22 l
29 224.75' 68.15 30 224.67.
68.37 1
h 4
)
L.._,...._-..J.-....i#
..o.-
.-.m...~~J.,%m.,L..~.-,,
i.~,...
.c-~,.-,.-,.J-m.<-*,--,
m.m.,
...r+
.',m...,%
. ~, -..,.,.,
.-,.m.
.,..4-.m L ~!
i R3fuwlino Information Reauest t
a 1.
Facility Names Big Rock Point Plant 2.
Scheduled date for next refueling shutdowns September, 1994.
l 3.
Scheduled date for restart following shutdown:
November, 1994.
1 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, explain:
i s
If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review Committee to determine whether any unreviewed safety questions as associated with the core reload (Reference 10 CFR, Section i
50.59)? Yes If no review has taken place, when is it scheduled?
i 5.
Scheduled date(s) for submittal of proposed licensing action and supporting informations i
6.
Important licensing considerations associated with refueling, eg. new or different fuel design or supplier, anreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:
f 7.
Number of fuel assemblies in: core 84 ; spent fuel pool storage 316; new fuel storage 0 8.
Present licensed spent fuel pool storage capacity:
441 E'.ze of any increase in licensed storage capacity that has been requested or planned (in number of fuel assemblies): O 9.
Projected date of last refueling that can be discharged to spent fuel pool assuming the present license capacity: Last total core off load 1996; Last refueling 1999.
I REFUELING.DM December 1,1993 M