. g.,
o
..=
-g
- 3 Consumers power
= am ' Bakman lunt Manager POWERmG nlKNNiAN'E NEOGRESS '
Big fictk Point Nuclear Plant,10269 US-31 North, Charlovoix, MI 49720 November 14, 1990-
+
t Nuclear Regulatory Commission
. Document Control Desk Washington, DC 20555-DOCKET'50-155 - LICENSE DPR BIC ROCK POINT PLANT -
- SPECIAL REPORTl INOPERABLE HI RANCE NOBLE CAS HONITOR Big Rock Point Technical: Specification 13.1.1 requires that one channel of
=the Hi-Range Noble Gas Monitor be in service at all times.
If this condition i
(.
cannot be met, the Specification requires initiation. of the preplanned 1
L alternate method of monitoring the appropriate parameter (s), within 72 l
l-hours, and
(
1) either. restore the inoperable channel (s) to Operable status within 7 days of the event, or 2) prepare and; submit a Special. Report to the Commission pursuant to l
l Specification 6.9'3 with 30 days following the event outlining.the j
l
. action taken, the'cause of the inoperability and the plans and j
l
' schedule for restoring the system to Operable status.-
-This letter provides this Special Report.
-l On October 24, 1990, the lil Range Noble Gas Monitor was removed from service I
to implement modifications associated with the Big Rock Point Safety
. Parameter' Display System. This was due to the fact that common power supply l
had to be removed from service to provide workmen's protection during=
1
' installation-of the modification.-
7 i
^
l' 90112101550 901114 PDR ADOCK 05000155 S
PDC OC1190-0006-BL01 N
/
/
ig r.
A C%LS ENG7?GYCOMPANY J
,4 4'..
Nuclear Ragulotory Commision 2
. Big _ Rock Point Plant Special Report November 14, 1990 Per the requirements of the Specification, the preplanned alternate method was initiated on October 25, 1990.
Following completion of the modification the 111 Range Noble Cas Monitor was returned to service on November 5,1990.
The safety significance of this event was null because the plant was in a Refueling Outage with all the fuel removed from the reactor.
, ,e k' $ r' W Wii am L Beckman j
Plant Manager l
CC Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point h
f l
l^
1 l.
OC1190-0006-BL01 l
l