Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000266/2016008 | 17 June 2016 | Ltr 06/17/16 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000266/2016008; 05000301/2016008 (GMH) | Safe Shutdown Hydrostatic Probabilistic Risk Assessment Job Performance Measure Severe Accident Management Guideline B.5.b Mitigating Strategies Exemption Request Fire Protection Program |
ML023220542 | 18 November 2002 | RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Pressure Boundary Leakage |
ML032060586 | 1 August 2003 | Request for Additional Information Related to Selective Scope Implementation of Alternate Source Term for Fuel Handling Accident | |
ML041610059 | 20 June 2004 | RAI, Request for Approval of Nuclear Management Co, Quality Assurance Topical Report | |
ML041750513 | 21 June 2004 | RAI, Security Plan Sections 10-19 | |
ML041890271 | 2 July 2004 | Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives for Point Beach Nuclear Plant, Units 1 and 2 | Internal Flooding Probabilistic Risk Assessment License Renewal |
ML042020035 | 9 July 2004 | RAI Training and Qualification Plan | |
ML042220024 | 23 July 2004 | Nuclear Management Company Facilities, RAI, Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC02931, MC2949, MC2940, MC2957, MC2958, MC2959 and MC2960) | |
ML042300115 | 18 August 2004 | Request for Additional Information Request Approval of Nuclear Management Company Quality Assurance Topical Report (TAC Nos. MB7157, MC1309- MC1316) | Nondestructive Examination |
ML042580225 | 10 September 2004 | Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures | |
ML043270587 | 16 November 2004 | Summary of Telephone Conference Held on October 26, 2004, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, | Aging Management |
ML050260237 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, Llc, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | Boric Acid VT-2 Aging Management Flow Induced Vibration |
ML050260247 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | Boric Acid Nondestructive Examination Aging Management |
ML050260319 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | Coatings Aging Management Fire Protection Program |
ML050260359 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | |
ML050260473 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | Aging Management |
ML050260636 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | Boric Acid Aging Management |
ML050270037 | 19 January 2005 | Summary of Telephone Conference Held on January 14, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, | Aging Management |
ML050270046 | 19 January 2005 | Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear | Non-Destructive Examination Aging Management License Renewal Control of Heavy Loads |
ML050270121 | 25 January 2005 | Summary of Telephone Conference Held on January 05, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units | Boric Acid Aging Management Earthquake Through-Wall Leak |
ML051050484 | 15 April 2005 | RAI, Licensing Basis for Control of Heavy Loads | Control of Heavy Loads |
ML051110033 | 20 April 2005 | RAI, Revision to Emergency Action Levels | Ultimate heat sink |
ML051450017 | 25 May 2005 | RA, Second Request for Additional Information Regarding Revision to Emergency Action Levels | Safe Shutdown |
ML052210268 | 12 August 2005 | RAI - Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | |
ML060030437 | 10 January 2006 | RAI, Regarding 10 CFR 50.72 Notification | Coatings |
ML060370491 | 9 February 2006 | RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors | Mission time Coatings Scaffolding |
ML062160328 | 29 August 2006 | Request for Additional Information Related to Evaluation of Event Notification 42129 | Coatings |
ML063200086 | 27 November 2006 | Request for Additional Information, Loss of Power Diesel Generator | |
ML070520461 | 27 February 2007 | Request for Additional Information, Steam Generator Program | |
ML072390316 | 24 August 2007 | Request for Additional Information License Amendment Request 249 Technical Specification 3.6.3 Containment Isolation Valves | |
ML072630463 | 31 October 2007 | Request for Additional Information Related to the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief Nos. RR-19 & RR-20 for Point Beach Plant, Units 1& 2 | |
ML073170039 | 15 November 2007 | Request for Additional Information Related to the Containment Integrated Leak Rate Testing (ILRT) Interval Extension | Probabilistic Risk Assessment Large early release frequency |
ML073450635 | 17 December 2007 | Request for Additional Information Related to the Containment Integrated Leak Rate Testing (ILRT) Interval Extension | |
ML080370062 | 12 February 2008 | Request for Additional Information Related to the Steam Generator Tube Inservice Inspection Reports for Refueling Outage 30 | |
ML080910312 | 28 March 2008 | Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) 05000266/2008009 (Drs); 05000301/2008009 (DRS) | Probabilistic Risk Assessment Temporary Modification |
ML080990388 | 18 April 2008 | Request for Additional Information Related to Technical Specification 3.7.5 C, Completion Time Extension | Safe Shutdown Probabilistic Risk Assessment |
ML081160206 | 29 April 2008 | Request for Additional Information, Technical Specification s 3.7.5.C Completion Time Extension | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Operator Manual Action Large early release frequency Fire Protection Program Fire Watch |
ML083300173 | 7 January 2009 | GSI-191/GL 2004-02 Request for Additional Information | Coatings |
ML092360535 | 26 August 2009 | Request for Additional Information, Round 2, from Containment and Ventilation Branch, on the Proposed Amendment Re. Alternative Source Term | |
ML100471368 | 16 February 2010 | Ltr. 02/16/10 Point Beach Fire Protection Inspection Request for Information | Safe Shutdown Fire Barrier Fire impairment Emergency Lighting Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
ML101481053 | 26 May 2010 | Draft - Request for Additional Information from Mechanical and Civil Engineering Branch AFW | Code Reconciliation |
ML101540509 | 3 June 2010 | Draft - Request for Additional Information from Containment and Ventilation Branch on HELB EPU | |
ML102170235 | 2 August 2010 | Email Attachment: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs Extended Power Uprate and Associated with Diesel FO Storage Requirements | |
ML102240637 | 11 August 2010 | Draft RAIs Extended Power Uprate (TAC Nos. ME1044 & ME1045 | Anticipated operational occurrence Earthquake Power Uprate |
ML102800263 | 4 October 2010 | AFW Modification LAR Requests for Additional Information - Scvb | Coast down |
ML103190653 | 8 November 2010 | Draft Requests for Additional Information, (Srxb) EPU LAR Review | Backfit |
ML11104A016 | 13 May 2011 | Nextera Energy, Inc., Florida Power and Light Company Request for Additional Information Regarding 2011 Decommissioning Funding Status Report for St. Lucie, Units 1 & 2, Turkey Point, Units 3 & 4, Seabrook, Duane Arnold, and Point Beach, Un | |
ML11147A117 | 8 June 2011 | Request for Additional Information Regarding License Amendment Request for Approval of Cyber Security Plan | Cyber Security |
ML12056A047 | 12 March 2012 | Enclosure 1 - Recommendation 2.1: Seismic | High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency Earthquake Generic Issues Program |
ML12056A048 | 12 March 2012 | Enclosure 2 - Recommendation 2.1: Flooding | High winds Ultimate heat sink Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |