March 28, 2008
Mr. James McCarthy
Site Vice President
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT
REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE
COMPONENT DESIGN BASES INSPECTION (CDBI) 05000266/2008009(DRS);
Dear Mr. McCarthy:
On June 23, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection
(CDBI) at the Point Beach Nuclear Plant. A team of six inspectors will perform this
3-week inspection. This inspection will be performed in accordance with NRC Baseline
Inspection Procedure (IP) 71111.21.
The CDBI inspection focuses on components that have high risk and low design margins. The
components to be reviewed during this baseline inspection will be identified during an in-office
preparation week prior to the first week of the on-site inspection. In addition, a number of risk
significant operator actions and operating experience issues, associated with the component
samples, will also be selected for review.
The inspection will include three weeks on-site, including the information gathering during the
first on-site week. The inspection team will consist of six NRC inspectors, of which five will
focus on engineering and one on operations. The current inspection schedule is as follows:
On-site weeks: June 23, 2008, through June 27, 2008;
July 7, 2008, through July 11, 2008; and
July 21, 2008, through July 25, 2008.
The team will be preparing for the inspection, mainly during the week of June 16, 2008, as
discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the
inspection team during the week of June 23, 2008, to review probabilistic risk assessment data,
and assist in identifying risk significant components, which will be reviewed during the
inspection.
Experience with previous baseline design inspections of similar depth and length has shown
that these types of inspections are extremely resource intensive, both for the NRC inspectors
and the licensee staff. In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
the inspection.
J. McCarthy
-2-
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than May 12, 2008. By
May 30, 2008, the lead inspector will communicate the initial selected set of approximately
30 high risk components.
The second group of documents requested are those items needed to support our in-office
preparation activities. This set of documents, including the calculations associated with the
initial selected components, should be provided to the lead inspector at the Regional Office
no later than June 9, 2008. During the in-office preparation activities, the team may identify
additional information needed to support the inspection.
The third and last group includes the additional information above, as well as plant
specific reference material. This information should be available to the team onsite on
June 23, 2008. It is also requested that corrective action documents and/or questions
developed during the inspection be provided to the lead inspector as the documents are
generated.
The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our licensing
contact for this inspection is Ms. Fritzie Flentje of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at (630) 829-9717 or via e-mail at zelig.falevits@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-266; 50-301
Enclosure:
Component Design Bases Inspection (CDBI) Document Request
See Attached Distribution
Letter to Mr. James McCarthy from Ms. A. M. Stone dated March 28, 2008.
SUBJECT:
POINT BEACH NUCLEAR PLANT REQUEST FOR INFORMATION FOR AN
NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
(CDBI) 05000266/2008009(DRS); 05000301/2008009(DRS)
cc w/encl:
M. Nazar, Senior Vice President and Nuclear
Chief Operating Officer
J. Stall, Senior Vice President and
Chief Nuclear Officer
R. Kundalkar, Vice President, Nuclear Technical Services
Licensing Manager, Point Beach Nuclear Plant
M. Ross, Managing Attorney
A. Fernandez, Senior Attorney
K. Duveneck, Town Chairman
Town of Two Creeks
Chairperson
Public Service Commission of Wisconsin
J. Kitsembel, Electric Division
Public Service Commission of Wisconsin
P. Schmidt, State Liaison Officer
J. McCarthy
-2-
It is important that all of these documents are up to date and complete in order to minimize the number of
additional documents requested during the preparation and/or the on-site portions of the inspection.
Insofar as possible, this information should be provided electronically to the lead inspector. The
information request has been divided into three groups:
The first group lists information necessary for our initial inspection scoping activities. This information
should be provided to the lead inspector no later than May 12, 2008. By May 30, 2008, the lead
inspector will communicate the initial selected set of approximately 30 high risk components.
The second group of documents requested are those items needed to support our in-office
preparation activities. This set of documents, including the calculations associated with the initial
selected components, should be provided to the lead inspector at the Regional Office no later than
June 9, 2008. During the in-office preparation activities, the team may identify additional information
needed to support the inspection.
The last group includes the additional information above as well as plant specific reference material.
This information should be available to the team onsite on June 23, 2008. It is also requested that
corrective action documents and/or questions developed during the inspection be provided to the lead
inspector as the documents are generated.
The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our licensing contact for
this inspection is Ms. Fritzie Flentje of your organization. If there are any questions about the inspection
or the material requested in the enclosure, please contact the lead inspector at (630) 829-9717 or via e-
mail at zelig.falevits@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and
Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-266; 50-301
Enclosure:
Component Design Bases Inspection (CDBI) Document Request
DISTRIBUTION
See next page
G:\\DRS\\Work in Progress\\Ltr. 03__08 Point Beach CDBI RFI CEA.doc
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE: RIII
RIII
RIII
RIII
NAME:
AMStone for CAcosta: ls
AMStone
DATE:
03/28/08
03/28/08
OFFICIAL RECORD COPY
Letter to Mr. James McCarthy from Ms. A M. Stone dated March 28, 2008.
SUBJECT:
POINT BEACH NUCLEAR PLANT REQUEST FOR INFORMATION FOR AN
NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
(CDBI) 05000266/2008009(DRS); 05000301/2008009(DRS)
cc w/encl:
M. Nazar, Senior Vice President and Nuclear
Chief Operating Officer
J. Stall, Senior Vice President and
Chief Nuclear Officer
R. Kundalkar, Vice President, Nuclear Technical Services
Licensing Manager, Point Beach Nuclear Plant
M. Ross, Managing Attorney
A. Fernandez, Senior Attorney
K. Duveneck, Town Chairman
Town of Two Creeks
Chairperson
Public Service Commission of Wisconsin
J. Kitsembel, Electric Division
Public Service Commission of Wisconsin
P. Schmidt, State Liaison Officer
DISTRIBUTION:
TEB
CFL
EMH1
LXR1
RidsNrrDirsIrib
MAS
KGO
JKH3
CAA1
RGK
DRPIII
DRSIII
PLB1
TXN
ROPreports@nrc.gov
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
COMPONENT DESING BASES INSPECTION (CDBI)
Enclosure
1
Inspection Report: 05000266/2008009; 05000301/2008009 (DRS)
Inspection Dates:
June 23, 2008, through June 27, 2008;
July 7, 2008, through July 11, 2008; and
July 21, 2008, through July 25, 2008
Inspection Procedure:
IP 71111.21 Component Design Bases Inspection
Lead Inspector:
Zelig Falevits, Lead Inspector
(630) 829-9717
zelig,falevits@nrc.gov
I.
Information Requested Prior to the On-site Information Gathering/Inspection Week
The following information is requested by May 12, 2008, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the team leader as soon as possible. (Please provide the information electronically in
pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM
should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
use. Information in lists should contain enough information to be easily understood by
someone who has knowledge of boiling water reactor technology).
1.
Risk ranking of top 150 components from your site specific probabilistic safety
analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for
Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)
(as applicable).
2.
Provide a list of the top 200 cut-sets from your PSA.
3.
Risk ranking of operator actions from your site specific PSA sorted by RAW.
Provide copies of your human reliability worksheets for these items.
4.
If you have an External Events or Fire PSA Model, provide the information
requested in Items 1 and 2 for external events and fire. Provide narrative
description of each coded event (including fire, flood zone description).
5.
Any pre-existing evaluation or list of components and associated calculations with
low design margins, (i.e., pumps closest to the design limit for flow or pressure,
diesel generator close to design required output, heat exchangers close to rated
design heat removal etc.).
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
COMPONENT DESIGN BASES INSPECTION (CDBI)
Enclosure
2
6.
List of available design (setup) margins for valves in the motor-operated valve
(MOV) and air-operated valve (AOV) programs.
7.
List of high risk Maintenance Rule Systems/components based on engineering or
expert panel judgment.
8.
Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
category.
9.
Site top ten issues list (if applicable).
10. A list of operating experience evaluations for the last 3 years.
11. Information of any common cause failure of components experienced in the last
5 years at your facility.
12. List of Root Cause Evaluations associated with component failures or design
issues initiated/completed in the last 5 years.
13. List of open operability evaluations.
14. Current management and engineering organizational chart.
15. Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.
16. One line electrical drawings (ac and dc) and key diagrams (paper copies).
II.
Information requested (for the approximate 30 selected components) to be
available by June 9, 2008, (will be reviewed by the team in the Regional Office
during the week of June 16, 2008). This information should be separated for each
selected component, especially if provided electronically (e.g., folder with
component name that includes calculations, condition reports, maintenance
history, etc).
1.
List of condition reports (corrective action documents) associated with each of the
selected components for the last 4 years.
2.
The corrective maintenance history associated with each of the selected
components for the last 4 years.
3.
Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and also
provide copies of referenced material (such as drawings, engineering requests,
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
COMPONENT DESIGN BASES INSPECTION (CDBI)
Enclosure
3
and vendor letters).
4.
System Health Reports, System Descriptions, and/or Design Basis Documents that
are associated with each of the selected components.
5.
A list of modifications associated with each of the selected components. This list
should include a descriptive paragraph on the purpose of the modification. Please
ensure this list only includes design completed (not canceled) modifications.
6.
Copies of operability evaluations (open/closed for last 3 years) associated with
each of the selected components and plans for restoring operability, if applicable.
7.
Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
8.
Copies of any open temporary modifications associated with each of the selected
components, if applicable.
9.
Trend data on the selected electrical/mechanical components performance for last
3 years (For example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., as applicable).
10. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for the inspection.
11. A copy of engineering/operations related audits completed in the last 2 years.
12. Provide list of PRA assumptions regarding operator actions and the associated
procedures.
13. Provide copies of any simulator scenarios, lesson plans, or job performance
measures for the selected operator actions.
14. Provide copies of the results of any time-dependent simulator scenarios or job
performance measures for operator crews/individuals for the selected operator
actions.
15. Provide copies of the emergency operating procedures, normal and abnormal
operating procedures and any alarm response procedures for the selected
operator actions. Also provide copies of the conduct for operations and operability
determination procedures.
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
COMPONENT DESIGN BASES INSPECTION (CDBI)
Enclosure
4
III.
Additional Information to be provided on June 23, 2008 on-site (for final 15 - 20
selected components)
During the in-office preparation activities, the team will be making final selections and
may identify additional information needed to support the inspection. The lead inspector
will provide a list of the additional information needed during the week of April 28, 2008.
IV.
Information Requested to be provided throughout the inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
3. One complete set of P&IDs (paper copies).
4. Reference materials. (make available if needed during all on-site weeks):
a. IPE/PRA Report;
b. Procurement documents for components selected (verify retrievable);
c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
d. Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.