December 17, 2007 Mr. James McCarthy Site Vice President FPLE Point Beach 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE CONTAINMENT INTEGRATED LEAK RATE TESTING (ILRT) INTERVAL EXTENSION FOR POINT BEACH, UNITS 1 AND 2 (TAC NOS. MD7013 AND MD7014)
Dear Mr. McCarthy:
By letter to the Nuclear Regulatory Commission (NRC) dated October 12, 2007, FPL Energy Point Beach, LLC, submitted a request to amend Technical Specifications 5.5.15 to reflect a one-time extension of the test interval for the Type A Integrated Leakage Rate Test (ILRT) for Point Beach Nuclear Plant (PBNP), Units 1 & 2.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on December 6, 2007, it was agreed that you would provide a response by January 7, 2008.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1424.
Sincerely,
/RA/
Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266 and 50-301
Enclosure:
Request for Additional Information cc w/encl: See next page
Mr. James McCarthy Site Vice President FPLE Point Beach 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE CONTAINMENT INTEGRATED LEAK RATE TESTING (ILRT) INTERVAL EXTENSION FOR POINT BEACH, UNITS 1 AND 2 ( TAC NOS MD7013 AND MD7014)
Dear Mr. McCarthy:
By letter to the Nuclear Regulatory Commission (NRC) dated October 12, 2007, FPL Energy Point Beach, LLC, submitted a request to amend Technical Specifications 5.5.15 to reflect a one-time extension of the test interval for the Type A Integrated Leakage Rate Test (ILRT) for Point Beach Nuclear Plant (PBNP), Units 1 & 2.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on December 6, 2007, it was agreed that you would provide a response by January 7, 2008.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1424.
Sincerely,
/RA/
Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-266 and 50-301
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 RidsNRRPMJCushing RidsNrrLATHarris RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr RPalla BTitus ADAMS Accession Number: ML073450635 OFFICE LPL3-1/PM LPL3-1/PM LPL3-1/LA LPL3-1/(A)BC NAME JCushing PMilano THarris CMunson DATE 12/13/07 12/17/07 12/12/07 12/17/07 OFFICIAL RECORD COPY
Point Beach Nuclear Plant, Units 1 and 2 cc:
Licensing Manager FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. J. A. Stall Senior Vice President and Chief Nuclear Officer FPL Group P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Antonio Fernandez Senior Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Mark Warner Vice President Nuclear Operations, North Region FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. R. S. Kundalkar Vice President Nuclear Technical Services FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 J. Kitsembel Electric Division Public Service Commission of Wisconsin P. O. Box 7854 Madison, WI 53707-7854 Mr. M. S. Ross Managing Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR POWER PLANT, (PBNP) UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301 In reviewing the FPLE Point Beach, LLC=s submittal dated October 12, 2007, the Nuclear Regulatory Commission staff has determined that additional information is needed in order to complete its review.
Because the integrated leak rate test (ILRT), the local leak rate test (LLRT), and containment inservice inspection (CISI) program collectively ensure leak tight integrity and structural integrity of the containment, the staff requests the following information to complete the review of the license amendment request (LAR):
- 1. With reference to Section 3.2.2 of the LAR, please indicate the current test intervals under Option B for the Type B and Type C LLRT. Please provide a schedule for the Type B and Type C tests on containment pressure-retaining boundaries that are or will be scheduled to be performed prior to and during the requested 5-year extension period.
- 2. Section 3.2.3 of the LAR specifically addresses IWE metal liner inspections, but fails to address inspections of the concrete containment. Please provide a discussion of the CISI program at (PBNP) Units 1 and 2, which fulfills the requirements for inspection of the concrete and post-tensioning portions of containment and the effect, if any, the proposed amendment has on the program. Please include a summary of the two most recent inspections.
- 3. With reference to Section 3.2.6 of the LAR, please provide information regarding the extent, depth, location/environment and the cause of the gouges associated with liner plates 1CP-130 and 2CP-129. Explain how the minimum required wall thickness was evaluated and determined to be acceptable.
- 4. Please provide information of instances, if any, during implementation of the IWE/IWL CISI program at (PBNP) Units 1 and 2, where existence of, or potential for, degradation conditions in inaccessible areas of the primary containment structure, and metallic liners were identified and evaluated based on conditions found in accessible areas as required by 10 CFR 50.55a(b)(2)(viii)(E) and 10 CFR 50.55a(b)(2)(ix)(A). If there were any instances of such conditions, please discuss the findings and actions taken.