ML072390316

From kanterella
Jump to navigation Jump to search
Request for Additional Information License Amendment Request 249 Technical Specification 3.6.3 Containment Isolation Valves
ML072390316
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/24/2007
From: Jack Cushing
NRC/NRR/ADRO/DORL/LPLIII-1
To: Flentje F
Nuclear Management Co
CUSHING J, NRO/DSER/RAP1, 415-1424
References
Download: ML072390316 (4)


Text

Jack Cushing - Email Request for Additional Information RE: License Amendment Request 249 Page I I From: Jack Cushing To: Fritzie.Flentje@nmcco.com Date: 08/24/2007 5:14:57 PM

Subject:

Email Request for Additional Information RE: License Amendment Request 249 Fritzie Attached is the request for additional information we discussed today (8/24/07). In your response please include the question. The response must be submitted under oath or affirmation. As discussed please respond within 45 days of receipt or by October 8, 2007.

Jack Cushing Senior Project Manager Plant Licensing Branch Il1-1 Division of Operating Reactor Licensing USNRC Phone 301-415-1424 Fax: 301-415-2002 E-mail: JXC9@NRC.GOV

Page 1 I

~:\temp\GW}OO0O1 .TMP

\temp\'W}00001.TMP Page 1..

Mail Envelope Properties (46CF4A5 I.CD3 : 22 : 11040)

Subject:

Email Request for Additional Information RE: License Amendment Request 249 Creation Date 08/24/2007 5:14:57 PM From: Jack Cushing Created By: JXC9(cnrc.gov Recipients Action Date & Time nmcco.com Transferred 08/24/2007 5:15:13 PM Fritzie.Flentje (Fritzie.FlentieC~nmcco.com)

Post Office Delivered Route nmcco.com Files Size Date & Time MESSAGE 1032 08/24/2007 5:14:57 PM Doc2.wpd 6962 08/24/2007 5:00:49 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification:

Send Mail Receipt when Undeliverable Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

Page 1 I

- Doc2.wpd Jack Cushing - Doc2.wpd Page 1 1 REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301 In reviewing the Nuclear Management Company, LLC's submittal dated July 12, 2007, the NRC staff has determined that the following information is needed in order to complete its review:

Enclosure I Section 1. Summary Description, last sentence in the first paragraph on Page 2 of 9 reads:

The proposed amendment would also support a change to the Point Beach Nuclear Plant (PBNP) Final Safety Analysis Report (FSAR) changing the present penetration classification of "Class 5" to "Special," with the subsequent requirement to leak check the outside-containment purge supply and exhaust valves.

The second paragraph of Section 1 reads:

The proposed amendment would revise leakage testing requirements for the containment purge supply and exhaust isolation function. Leakage of the double 0-ring seals of the blind flanges is addressed by SR 3.6.1.1. The purge supply and exhaust valve system no longer contains the inside-containment isolation valves.

1. What is meant by "...subsequent requirement to leak check the outside-containment purge supply and exhaust valves"?
2. How does the requested deletion of surveillance requirement (SR) 3.6.3.1 revise leakage testing requirements for the containment purge supply and exhaust isolation function? Is this revision in leakage testing requirements implicit in the requested

-Teca1il Specifitionchanget delete a requiirement to v-eVify-tl e-v-als are-losed with their control switches locked?

Enclosure 1 Section 3. Second sentence, fourth paragraph on Page 4 of 9 reads:

Type B penetrations are required to be tested under Option B of 10 CFR 50 Appendix J at least once every 30 months.

3. Your Technical Specifications Section 5.5.15a indicates that your Containment Leakage Rate Testing Program is in accordance with Regulatory Guide 1.163,

.. "Pir-ffg-a-te-B6sed-Cdntain-rdent-Leak-TegtProgram." Regulatcry Guide 1.163 endorses NEI 94-01, Revision 0, "Industry Guideline for Implementing Performance Based Option of 10 CFR 50 Appendix J." NEI 94-01 Revision 0 reads "...periodic Type B tests shall be performed at a frequency of at least once per 30 months, until acceptable performance is established." NEI 94-01 goes on to allow the Type B penetration test interval to be extended up to a maximum of once per 120 months based on the acceptable

Jack Cushing - Doc2.wpd Page 2 1 performance and additional performance factors. The sentence quoted above was not a complete statement of the testing intervals for Type B penetrations. Does the testing interval for the blind flanges still follow the complete guidance stated above or is it limited to 30 months?