Letter Sequence RAI |
---|
|
|
MONTHYEARML0726304632007-10-31031 October 2007 Request for Additional Information Related to the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief Nos. RR-19 & RR-20 for Point Beach Plant, Units 1& 2 Project stage: RAI ML0801600092008-02-19019 February 2008 the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief Nos. RR-18, RR-19, and RR-20 (TAC Nos. MD6346 & MD6347) Project stage: Other NRC 2008-0017, CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval2008-03-14014 March 2008 CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval Project stage: Request ML0816908872008-08-25025 August 2008 the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief Nos. RR-18, RR-19, and RR-20 (Tac Nos. MD6346 and MD6347) Project stage: Other 2008-02-19
[Table View] |
|
---|
Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 ML23136A2802023-05-0505 May 2023 SLRA Second Annual Update RAI Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22266A0872022-09-23023 September 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22172A1192022-06-27027 June 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4B ML22130A5712022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21362A6812021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML21362A6702021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21286A6042021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final ML21287A0862021-09-29029 September 2021 SLRA Safety RAI Set 11 Final ML21273A0222021-09-29029 September 2021 SLRA Safety RAI Set 9 Final ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2472021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2202021-08-20020 August 2021 SLRA Safety RAI Set 7 Final ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2032021-08-12012 August 2021 Srla Safety RAIs Set 5 Final ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2392021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21242A0152021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A0122021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 ML21242A1992021-08-0505 August 2021 Srla Draft Safety RAIs Set 5 ML21242A2002021-08-0505 August 2021 SLRA Draft Safety RAIs Set 5 Email ML21285A1212021-08-0505 August 2021 SLRA Public Meeting Discussion Questions August 5 2021 ML21238A2332021-08-0404 August 2021 SLRA Safety RAI Set 4 Final ML21238A2322021-08-0404 August 2021 SLRA Safety RAI Set 4 Final Email ML21237A0062021-08-0202 August 2021 SLRA Draft Safety RAIs Set 4 ML21214A0842021-07-27027 July 2021 SLRA Safety RAIs Set 3 Final ML21208A1892021-07-27027 July 2021 SLRA Safety RAIs Set 2 Final ML21172A2382021-07-21021 July 2021 (Pbn) Subsequent License Renewal Application (SLRA) Draft Requests for Additional Information (Rais) Safety - Set 2 ML21214A0722021-07-20020 July 2021 Subsequent License Renewal Application Draft Safety RAIs Set 3 ML21161A1192021-06-10010 June 2021 RAIs Set 1 Final Aging Management of Irradiated Concrete and Steel Reactor Vessel Supports Final ML21134A0582021-05-14014 May 2021 Final Request for Additional Information and Requests for Confirmation of Information - Point Beach SLRA Environmental Review (EPID No. L-2020-SLE-0002) - Email 2024-01-30
[Table view] |
Text
October 31, 2007 James H. McCarthy Site Vice President FPLE-Point Beach 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF NOS. RR-19, AND RR-20 (TAC NOS. MD6346 AND MD6347)
Dear Mr. McCarthy:
By letter to the Nuclear Regulatory Commission (NRC) dated April 6, 2007, Nuclear Management Company, LLC (NMC, the licensee) submitted a request to for the Point Beach Nuclear Plant, Units 1 and 2. FPL Energy Point Beach, LLC has since become the current licensee, following a license transfer that occurred on August 28, 2007. Therefore, from hereon in, correspondence from NMC will be referred to as correspondence from the licensee.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on September 20, 2007, it was agreed that you would provide a response by November 16, 2007.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3154.
Sincerely,
/RA/
Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
Request for Additional Information cc w/encl: See next page
James H. McCarthy Site Vice President FPLE-Point Beach 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF NOS. RR-19, AND RR-20 (TAC NOS. MD6346 AND MD6347)
Dear Mr. McCarthy:
By letter to the Nuclear Regulatory Commission (NRC) dated April 6, 2007, Nuclear Management Company, LLC (NMC, the licensee) submitted a request to for the Point Beach Nuclear Plant, Units 1 and 2. FPL Energy Point Beach, LLC has since become the current licensee, following a license transfer that occurred on August 28, 2007. Therefore, from hereon in, correspondence from NMC will be referred to as correspondence from the licensee.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on September 20, 2007, it was agreed that you would provide a response by November 16, 2007.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3154.
Sincerely,
/RA/
Jack Cushing, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 RidsNRRPMJCushing RidsNrrLATHarris RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr ADAMS Accession Number: ML072630463 OFFICE LPL3-1/PM LPL3-1/LA DCI/CVIB/BC LPL3-1/(A)BC NAME JCushing THarris MMitchell CMunson DATE 10/ 30/07 10/30/07 10/31/07 10/31/07 OFFICIAL RECORD COPY
Point Beach Nuclear Plant, Units 1 and 2 cc:
Licensing Manager Mr. Antonio Fernandez FPL Energy Point Beach, LLC Senior Attorney 6610 Nuclear Road FPL Energy , LLC Two Rivers, WI 54241 P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Ken Duveneck Town Chairman Mr. Mark Warner Town of Two Creeks Vice President 13017 State Highway 42 Nuclear Operations, North Region Mishicot, WI 54228 FPL Energy, LLC P. O. Box 14000 Resident Inspector's Office Juno Beach, FL 33408-0420 U.S. Nuclear Regulatory Commission 6612 Nuclear Road Mr. R. S. Kundalkar Two Rivers, WI 54241 Vice President Nuclear Technical Services Chairman FPL Energy, LLC Public Service Commission of Wisconsin P. O. Box 14000 P.O. Box 7854 Juno Beach, FL 33408-0420 Madison, WI 53707-7854 J. Kitsembel Mr. J. A. Stall Electric Division Senior Vice President and Public Service Commission of Wisconsin Chief Nuclear Officer P. O. Box 7854 FPL Group Madison, WI 53707-7854 P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. M. S. Ross Managing Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 October 2007
REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301 In reviewing the licensee submittal dated April 6, 2007, the Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed in order to complete its review:
For the fourth 10-year inservice inspection (ISI) interval, the Point Beach Nuclear Plant, Units 1 and 2, adopted the 1998 Edition through the 2000 Addenda of American Society of Mechanical Engineers (ASME) Code,Section XI as the ASME Code of record.
The licensee requested relief from the ASME Code,Section XI requirements based on it being impractical to perform the required examinations. The NRC staff requires additional information in order to complete its evaluation of RR-19 and RR-20. The following information is required.
Question 1 RR-19 The licensee requested relief from the ASME Code,Section XI, Examination Category F-A, Item F1.40 that requires a visual, VT-3 examination of all of the Point Beach Nuclear Plant, Units 1 and 2 reactor pressure vessel (RPV) supports.
- a. Provide the number, location, component identification numbers for, and identify all welds associated with the RPV supports for Point Beach Nuclear Plant, Units 1 and 2.
- b. Provide a representative drawing of a RPV support which shows the areas required to be inspected and any interferences which make the required inspections impractical.
Question 2 RR-20 The licensee requested an alternative to examine RPV Upper Vessel Shell-to-Flange Welds using ASME Code,Section XI, Appendix VIII, Supplements 4 and 6 in lieu of the ASME Code requirements.
- a. Provide the identification numbers for the RPV Upper Vessel Shell-to-Flange welds.
- b. Provide drawings of the RPV Upper Vessel Shell-to-Flange welds.