ML19208A69414 September 1979Forwards Amend 51 to Psar.Amend Includes Updates Reflecting Change in Plant Ref Core to Heterogenous Fuel/Blanket Configuration & Other Updates & RevisionsSafe Shutdown
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Finite Element Analysis
Overtravel
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
Coast down
ML19211A74514 December 1979Forwards WARD-D-0050,Revision 3, Facility Core Assembly Hot Channel Factors Preliminary Analysis.
ML19224C34629 June 1979Forwards Amend 50 to PSAR
ML19249D87420 September 1979Forwards Certificate of Svc for PSAR Amend 51
ML19254D05519 October 1979Forwards Psar,Amend 52
ML19254D79626 October 1979Forwards Affidavit Confirming Distribution of Amend 52 to PSAR to Designated Local Public Officials & EPA Representatives
ML19255E7222 November 1982Forwards Addl Info Requested at Electrical Power 821019 Working meeting.Marked-up PSAR Pages Will Be Incorporated Into Future PSAR Revision.Addl Info Re Item 8.3.3.3.g Will Be Submitted 821201
ML19257D02331 January 1980Forwards Amend 53 to Psar,Amending Application for CP & Class 104(b) Ol.Certificate of Svc Encl
ML19259A7253 January 1979Ack Receipt of NRC 781109 Ltr Providing Summary of Outstanding Items.Asserts That DOE Is Statutorily Obligated to Continue to Design Facility & Manufacture Hardware on Order,But Is Proceeding Along Path of Prudent Management
ML19260D8307 February 1980Forwards Affidavit Confirming Distribution of PSAR Amend 53 to Designated Local Public Officials & EPA Representatives
ML19261B9745 March 1979Forwards item-by-item Assessment of Resolvability of Open Items in NRC Staff Review.Requests Resumption of NRC-DOE Safety Review & Technical Interchange ActivitiesUltimate heat sink
Fire Barrier
Post Accident Monitoring
Incorporated by reference
Turbine Missile
Flow Induced Vibration
ML19263B8233 January 1979Ack Receipt of 781109 Gammill-Caffey Ltr Summarizing NRC Technical Staff Positions.Evaluation Will Be Concluded Shortly
ML19263E3321 June 1979Forwards Responses to NRC Request for Addl Info Re Physical Security Plan.Plan Withheld (Ref 10CFR2.790)
ML19269C99923 February 1979Forwards Amend 48 to PSAR
ML19270F60716 February 1979Forwards Copies of Analysis of Hypothetical Core Disruptive Events in Clinch River Breeder Reactor Plant. Rept Is Major Ref to CRBRP-3,Vol 1,Energy & Structural Margin Beyond Design Base Submitted 790209
ML19274D63622 January 1979Responds to NRC 781218 Ltr Re IE Insp Rept 50-537/78-01.No Proprietary Info.Requests 2 Word Corrections in Rept
ML19281A06416 February 1979Forwards WARD-D-0169, Clinch River Breeder Reactor Plant, Response of Plant to Postulated Loss of One Heat Transport Loop W/Failure of Both Reactor Shutdown Sys.
ML19283B66628 February 1979Forwards Affidavit Confirming Distribution of Amend 48 to PSAR to Local Officials & EPA
ML19296A2139 February 1979Forwards Topical Rept CRBRP-3,Vol 1, Energetics and Structural Margin Beyond the Design Base.
ML19305A77811 March 1980Forwards WARD-D-0210, Predicted Steady State Thermal- Hydraulic Performance of Fuel & Blanket Assemblies in Plant Heterogeneous Core, Revision 1
ML19305C62425 March 1980Forwards CRBRP-3, Hypothetical Core Disruptive Accident Considerations,Vol 2:Assessment of Thermal Margin Beyond Design Base. Reactor Containment Integrity Maintained for at Least 24-h Following Event
ML19305D74211 April 1980Forwards Revision 1 to WARD-D-0218, Structural Response of Scale Models to Simulated Hypothetical Core Disruptive Accident.
ML19309F3674 April 1980Forwards Final Rept on Base Matls Tests for Cell Liner Steels.
ML19316B0975 June 1980Confirms Distribution of Amend 54 to Psar.Certificate of Svc Encl
ML19318B61427 June 1980Forwards Amend 55 to PSAR
ML19318D2553 July 1980Forwards Affidavit Confirming Distribution of PSAR Amend 55 to Local Public Officials & EPA Representatives
ML19323G05730 May 1980Forwards Amend 54 to Psar.Certificate of Svc List Encl
ML19331D32222 August 1980Forwards Clinch River Breeder Reactor Plant Fuel Assembly Structural Analysis in Support of Final Design Review, as Partial Response to Question 7 of Tp Speis 751006 Ltr.Addl Rept Will Be Submitted
ML19331E2785 September 1980Forwards Affidavit Confirming Distribution of Amend 56 to PSAR to Designated Local Public Officials & Representatives of EPA
ML19339B6687 November 1980Forwards Amend 57 to PSAR
ML19339C57613 November 1980Forwards Affidavit Confirming Distribution of Amend 57 to PSAR to Designated Local Public Officials & Representatives of EPA
ML19340D56830 December 1980Forwards Amend 59 to Psar.Service List Encl
ML19341C24826 February 1981Forwards Clinch River Breeder Reactor Project Circulation Verification Program Pretest Predictions for Fftf Natural Circulation Tests Initiated at 100% & 75% Power/Flow Conditions.
ML19345B30326 November 1980Forwards Amend 58 to PSAR
ML19345B77928 November 1980Forwards Prediction of Fftf Natural Circulation Test Results Using Clinch River Breeder Reactor Plant Project Methodology, & Demo Pretest Predictions for Fftf Natural Circulation Tests. Info Available in Central Files Only
ML19345C4952 December 1980Forwards Certificate of Svc Confirming Distribution of Amend 58 to PSAR
ML20002C1635 January 1981Forwards Certificate of Svc Re Distributionof Amend 59 to PSAR
ML20003B69819 February 1981Forwards Certificate of Svc for Amend 60 to PSAR
ML20023B27223 December 1982Forwards Addl Info Re PSAR Chapter 4, Reactor. Chapter 4.3,Item 1.e & Chapter 4.4,Item 1.d Will Be Incorporated in Amend 75 to PSAR Scheduled for Submittal Jan 1983
ML20023B31423 December 1982Forwards Addl Info Requested at 821118-19 Meetings Re Instrumentation (Chapter 7).Amended PSAR Pages Will Be Incorporated Into Amend 75 of PSAR to Be Submitted in Jan 1983Hot Short
ML20023B31622 December 1982Forwards Response to NRC 821012 Request for Addl Info Re Intermediate Heat Transport Sys Tee Overtemp Problem
ML20023C58216 May 1983Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways
ML20023D40320 May 1983Forwards Amend 77 to PSAR
ML20023D96127 May 1983Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts EnclProbabilistic Risk Assessment
ML20024A67820 June 1983Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl
ML20024C1628 July 1983Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985
ML20024D02922 July 1983Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRAProbabilistic Risk Assessment
ML20024D9559 May 1983Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984
ML20027B94430 September 1982Forwards Amend 71 to Psar.Amend Includes Responses to Requests for Addl Info,Revisions to Chapter 7, Instrumentation & Controls, Sections 17E & 17I & Other Updates & Revisions.Certificate of Svc Encl
ML20027C24324 August 1982Forwards Response to NRC 820409,0514 & 0609 Ltrs Re Request for Addl Info.Responses to Questions CS 421.26,43,51 & 53 & CS 760.162,164 & 176 Will Be Incorporated Into Future FSAR Amend