Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML020510477 | 26 February 2002 | Trip Report - Observation of RIP50 Option 2 Pilot Activities (IDP Demonstration) at Surry Nuclear Power Plant | Safe Shutdown |
ML020920429 | 16 April 2002 | Conference Call with VEPCO Reactor Vessel Head Inspection | Boric Acid |
ML021230617 | 18 April 2002 | Conference Call Re Surry Unit 2 Reactor Vessel Head Inspection Results | Boric Acid |
ML021330427 | 13 May 2002 | Dominion'S Draft SBO Response | |
ML021400538 | 20 May 2002 | Dominion'S Responses to Staff'S Questions During Telecommunication on September 26,2001 | Fire Barrier Aging Management |
ML021410049 | 20 May 2002 | Dominion'S Response to Draft Request Fro Additional Information (RAI) 2.3.4.4-8 | |
ML021410080 | 20 May 2002 | Dominion'S Supplemental Response to 4.3-6 | |
ML021410131 | 20 May 2002 | Dominion'S Responses to Staff'S Questions During a Telecommunication on November 21, 2001 | Fire Barrier Hydrostatic Aging Management |
ML021890407 | 8 July 2002 | Dominion'S Draft Open Item & Confirmatory Action Responses | |
ML021890518 | 8 July 2002 | Dominion'S Technical Report for Criterion 2 Evaluation, Technical Report LR-1921/LR-2921. | |
ML021890558 | 8 July 2002 | Dominion'S SBO & Non EQ Cable Ama Letter | Aging Management |
ML021980117 | 16 July 2002 | Dominion'S Editorial Comments on Draft Surry and North Anna Safety Evaluation Report | |
ML021980129 | 16 July 2002 | Attachment to 07/16/02 Memo: Dominion'S Editorial Comments on Draft Surry and North Anna Safety Evaluation Report, Naps/Sps | Boric Acid Design basis earthquake |
ML022170568 | 1 August 2002 | Dominion'S Additional Information for RAI 2.1-3 | Aging Management |
ML022190258 | 5 August 2002 | Dominion'S Additional Information on Reactor Vessel Neutron Embrittlement | |
ML022190261 | 5 August 2002 | Attachment: Dominion'S Additional Information on Reactor Vessel Neutron EMBRITTLEMENT-NORTH Anna | |
ML022190268 | 5 August 2002 | Attachment: Dominion'S Additional Information on Reactor Vessel Neutron EMBRITTLEMENT-SURRY | |
ML022390114 | 23 August 2002 | Dominion'S Additional Information on Reactor Vessel Neutron Embrittlement | |
ML022390218 | 23 August 2002 | Dominion'S Additional Information on Reactor Vessel Neutron Embrittlement | |
ML022390432 | 27 August 2002 | Dominion'S Additional Information on Dissimilar Metal-Weld Cracking (V.C. Summer Event) | Hydrostatic Dissimilar Metal Weld |
ML022400106 | 27 August 2002 | Dominion'S Additional Information on the Evaluation of Surry Reactor Vessel Materials Surveillance Data | |
ML022400334 | 27 August 2002 | NRR Notification of Significant Licensing Action for Proposed Issuance of Orders Re Responses to Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. | Stress corrosion cracking |
ML022420231 | 29 August 2002 | Draft Memo from Samuel Collins Re Issuance of Order Re Responses to Bulletin 2001-01 | |
ML022620688 | 19 September 2002 | Dominion'S Draft Report on Surry Power Stations (SPS) Reactor Vessel Neutron Embrittlement Evaluation | |
ML022700123 | 26 September 2002 | and 09/19/2002 Summary of Telecommunications with Dominion Virginia Electric and Power Company | |
ML022730110 | 27 September 2002 | Dominion'S Revised Response to Staff'S RAI 4.3-6 - Memo | |
ML022940545 | 21 October 2002 | Summary of October 2, 2002, Conference Call Regarding Virginia Electric and Power Company'S Proposal to Replace the Reactor Vessel Head | |
ML022970363 | 23 October 2002 | Meeting with NEI, Surry & North Anna Units 1 & 2, McGuire & Catawba Units 1 & 2, Peach Bottom Units 2 & 3, St. Lucie Units 1 & 2, Fort Calhoun, H. B. Robinson Unit 2, R.E. Ginna, and Virgil C. Summer. the Proposed Agenda Is Attached | |
ML023460010 | 12 December 2002 | Category 1 Structures Settlement Monitoring Procedure Revision | |
ML023470633 | 13 December 2002 | Transmittal of NUREG/CR-6783, Structural Seismic Fragility Analysis of the Surry Containment. | Finite Element Analysis Earthquake |
ML030020743 | 2 January 2003 | Facsimile Transmission of Issues Discussed in 12/10/2002 Conference Call | |
ML030140545 | 17 January 2003 | Reactor Pressure Vessel Head (Rvhp) Penetration Concerns at North Anna Power Station, Unit 1 | Boric Acid Liquid penetrant |
ML030270089 | 27 January 2003 | Facsimile Transmission of Issues Discussed in a Conference Call | |
ML030270112 | 24 January 2003 | Fax, Request for Additional Information Framatome Fuel Transition | Exemption Request |
ML030270165 | 24 January 2003 | NRC Staff Request for Additional Information VEP-FRD-42, Reload Design Methodology, North Anna & Surry Units 1 & 2 | |
ML030290111 | 29 January 2003 | Meeting with Virginia Electric & Power Company (VEPCO) & Framatome to Discuss Results of Nrc'S Inspection of Vepco'S Reactor Vessel Head Replacement at North Anna, Unit 2 | |
ML030430106 | 12 February 2003 | Summary of January 15, 2003, Conference Call with Virginia Electric and Power Company to Discuss the Unidentified Leakage at North Anna Power Station, Unit 1 | Boric Acid |
ML030560072 | 25 February 2003 | Cancellation of the Improved Technical Specifications Project | |
ML030640068 | 5 March 2003 | Memo, Note to File Conference Call on 6/13/02 Re Performance of Volumetric Examinations of socket-welded Connections and Branch Connections Welds | |
ML030640087 | 5 March 2003 | Memo, Note to Fille, Conference Call on 1/26/03 Repair of Buried Fuel Oil Storage Tank During Plant Operation | Safe Shutdown Probabilistic Risk Assessment Large early release frequency |
ML030710523 | 12 March 2003 | Public Meeting Announcement - Category One Meeting Annual Assessment - Surry Power Station | |
ML030760715 | 17 March 2003 | Reactor Pressure Vessel Head Replacement Reconciliation Inspection | Hydrostatic Nondestructive Examination Liquid penetrant Through-Wall Leak |
ML030910434 | 31 March 2003 | Facsimile Transmission of Questions for Proposed Technical Specifications Changes and Exemption Request, Use of Framatome Anp Advanced Mark-BW Fuel | Exemption Request |
ML030940698 | 4 April 2003 | Meeting Summary- Discussion of Control Room Habitability Testing at North Anna Power Station, Units 1 and 2 | |
ML031000228 | 10 April 2003 | Memo, Note to File Draft Request for Additional Information to Support Conference Call on Extension of Vital Bus Inverter Completion Times | High winds |
ML031010197 | 14 April 2003 | Memo to File Re. Facsimile Transmission of Issues to Be Discussed in a Conference Call | |
ML031280333 | 8 May 2003 | Memo, Facsimile Transmissions Supporting Upcoming Conference Call. (Tac Nos. MB6291 & MB6292) | Earthquake |
ML031770100 | 4 June 2003 | Ltr to Dam Safety Group, Action Requested - Telephone Conference W/ Virginia Electric Power Company to Discuss Dam Safety Issues for the Catergory I Service Water Reservoir Dam at the North Anna Nuclear Power Plant | |
ML032100374 | 25 July 2003 | Facsimile Transmissions Supporting Upcoming Conference Call | |
ML032320002 | 19 August 2003 | Facsimile Transmission of Questions for Proposed Technical Specifications Changes, Use of Framatome Anp Advanced Mark-BW Fuel | Loop seal |