L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 | 18 December 2003 | Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 | |
L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors | 25 January 2018 | Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors | VT-2 |
L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. | 24 September 2015 | Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. | |
L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. | 29 June 2015 | Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. | B.5.b Mitigating Strategies Earthquake |
L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System | 26 December 2019 | Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System | Open Phase Condition Offsite Circuit |
L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection | 26 November 2018 | Notification of Readiness for NRC Inspection Procedure 95001 Inspection | |
L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation | 24 January 2019 | American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation | Through Wall Leak |
L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) | 29 January 2019 | Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) | Tritium Producing Burnable Absorber Rods |
L-19-015, Annual Non-Radiological Environmental Operating Report - 2018 | 11 April 2019 | Annual Non-Radiological Environmental Operating Report - 2018 | |
L-19-016, Annual Radiological Environmental Operating Report - 2018 | 15 May 2019 | Annual Radiological Environmental Operating Report - 2018 | Annual Radiological Environmental Operating Report |
L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 | 7 March 2019 | Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 | Stroke time |
L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual | 19 March 2019 | Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Missed surveillance Pressure and Temperature Limits Report Process Control Program Fuel cladding Offsite Circuit Grace period Coast down |
L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision | 7 March 2019 | Unit 2 - Emergency Plan Implementing Procedures Revision | |
L-19-026, Revised Pressure and Temperature Limits Report (PTLR) | 4 April 2019 | Revised Pressure and Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report | 24 April 2019 | Submittal of Revision 0 of Cycle 3 Core Operating Limits Report | Shutdown Margin |
L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations | 15 May 2019 | Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations | |
L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report | 18 June 2019 | Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report | Post Accident Monitoring |
L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection | 20 June 2019 | Notification of Readiness for NRC Inspection Procedure 95001 Inspection | |
L-19-041, Cycle 2 Steam Generator Tube Inspection Report | 27 August 2019 | Cycle 2 Steam Generator Tube Inspection Report | Nondestructive Examination |
L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions | 8 August 2019 | Unit 2 - Forward Emergency Plan Implementing Procedure Revisions | |
L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation | 14 August 2019 | American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation | Moisture barrier Through Wall Leak |
L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met | 3 October 2019 | Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met | |
L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 | 12 September 2019 | Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 | Unanalyzed Condition |
L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies | 30 September 2019 | Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies | |
L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision | 5 December 2019 | Unit 2 - Emergency Plan Implementing Procedure Revision | |
L-19-058, Statement of Payment of Civil Penalty | 11 December 2019 | Statement of Payment of Civil Penalty | |
L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision | 16 December 2019 | Unit 2 - Emergency Plan Implementing Procedure Revision | |
L-20-006, Unit 2, Emergency Plan Implementing Procedure Revision | 10 February 2020 | Unit 2, Emergency Plan Implementing Procedure Revision | |
L-88-017, Response Clarification to Generic Letter 88-017 | 13 August 2013 | Response Clarification to Generic Letter 88-017 | |