BYRON 2002-0005, Revision 1 to Byron Stations 1 and 2, Cycles 11a and 10a, Core Operating Limits Reports | 17 January 2002 | Revision 1 to Byron Stations 1 and 2, Cycles 11a and 10a, Core Operating Limits Reports | Shutdown Margin |
BYRON 2002-0023, Revision 3 to Cycle 11A Core Operating Limits Report | 27 February 2002 | Revision 3 to Cycle 11A Core Operating Limits Report | Shutdown Margin |
BYRON 2002-0033, Regulatory Commitment Change Summary Report | 28 March 2002 | Regulatory Commitment Change Summary Report | Biofouling |
BYRON 2002-0034, 2001 Annual Radioactive Effluent Release Report | 26 April 2002 | 2001 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
BYRON 2002-0035, Annual Environmental Operating Report | 15 April 2002 | Annual Environmental Operating Report | |
BYRON 2002-0038, Notification of Modification Completion in Support of License Amendment to Revise Technical Specification Requirements Associated with the Boron Dilution Protection System | 17 May 2002 | Notification of Modification Completion in Support of License Amendment to Revise Technical Specification Requirements Associated with the Boron Dilution Protection System | |
BYRON 2002-0040, Occupational Radiation Exposure Report | 24 April 2002 | Occupational Radiation Exposure Report | Deep Dose Equivalent |
BYRON 2002-0050, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. | 26 April 2002 | Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. | Boric Acid VT-2 |
BYRON 2002-0051, Response to NRC Bulletin 2002-001, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | 26 April 2002 | Response to NRC Bulletin 2002-001, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 |
BYRON 2002-0053, 2001 Annual Radiological Environmental Operating Report | 13 May 2002 | 2001 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
BYRON 2002-0056, April 2002 Monthly Operating Report for Byron Station, Units 1 & 2 | 15 May 2002 | April 2002 Monthly Operating Report for Byron Station, Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2002-0073, June 2002 Monthly Operating Report for Byron Units 1 & 2 | 15 July 2002 | June 2002 Monthly Operating Report for Byron Units 1 & 2 | |
BYRON 2002-0074, Cycle 12 Core Operating Limits Report, Revision 2 | 6 August 2002 | Cycle 12 Core Operating Limits Report, Revision 2 | Shutdown Margin |
BYRON 2002-0075, Response to Request for Additional Information Regarding Inspection Plans for the Byron Station Unit 2 Reactor Vessel Head During the Fall 2003 Refueling Outage in Support of NRC Bulletin 2002-01 | 26 July 2002 | Response to Request for Additional Information Regarding Inspection Plans for the Byron Station Unit 2 Reactor Vessel Head During the Fall 2003 Refueling Outage in Support of NRC Bulletin 2002-01 | Boric Acid |
BYRON 2002-0100, Cycle 11 Core Operating Limits Report | 27 September 2002 | Cycle 11 Core Operating Limits Report | Shutdown Margin |
BYRON 2002-0102, Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage | 8 October 2002 | Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage | |
BYRON 2002-0109, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles | 25 October 2002 | Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles | Boric Acid VT-2 |
BYRON 2002-0110, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 25 October 2002 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 |
BYRON 2002-0111, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | 25 October 2002 | Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | Boric Acid VT-2 |
BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual | 25 October 2002 | LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual | Fitness for Duty |
BYRON 2002-0129, Generator Inservice Inspection Summary Report | 10 December 2002 | Generator Inservice Inspection Summary Report | Nondestructive Examination |
BYRON 2002-0133, November 2002 Monthly Operating Report for Byron Station, Units 1 & 2 | 16 December 2002 | November 2002 Monthly Operating Report for Byron Station, Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2002-0135, Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10) | 3 January 2002 | Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10) | |
BYRON 2002-5006, Steam Generator Tube Repairs Resulting from Cycle 11 Refueling Outage | 28 March 2002 | Steam Generator Tube Repairs Resulting from Cycle 11 Refueling Outage | |
BYRON 2002-5008, Steam Generator Inservice Inspection Summary Report | 13 June 2002 | Steam Generator Inservice Inspection Summary Report | Nondestructive Examination |
BYRON 2003-0017, January 2003 Monthly Operating Report for Byron Units 1 & 2 | 15 February 2003 | January 2003 Monthly Operating Report for Byron Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2003-0019, Annual Environmental Operating Report | 24 March 2003 | Annual Environmental Operating Report | |
BYRON 2003-0023, February 2003 Monthly Operating Report for Byron Station, Units 1 & 2 | 15 March 2003 | February 2003 Monthly Operating Report for Byron Station, Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2003-0025, Regulatory Commitment Change Summary Report | 1 April 2003 | Regulatory Commitment Change Summary Report | Boric Acid Ultimate heat sink VT-2 |
BYRON 2003-0035, Occupational Radiation Exposure Report | 30 April 2003 | Occupational Radiation Exposure Report | Deep Dose Equivalent |
BYRON 2003-0036, Annual Radioactive Effluent Release Report | 26 April 2003 | Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
BYRON 2003-0043, April 2003 Monthly Operating Report for Byron Station Units 1 & 2 | 15 May 2003 | April 2003 Monthly Operating Report for Byron Station Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2003-0064, Revision to Reactor Coolant System Pressure & Temperature Limits Report | 17 July 2003 | Revision to Reactor Coolant System Pressure & Temperature Limits Report | Hydrostatic Pressure and Temperature Limits Report |
BYRON 2003-0070, July 2003 Monthly Operating Report for Byron Units 1 & 2 | 15 August 2003 | July 2003 Monthly Operating Report for Byron Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2003-0079, to Byron, Unit 1 Cycle 12, Core Operating Limits Report and Revision1 to Byron, Unit 2 Cycle 11, Core Operating Limits Report | 28 August 2003 | to Byron, Unit 1 Cycle 12, Core Operating Limits Report and Revision1 to Byron, Unit 2 Cycle 11, Core Operating Limits Report | Shutdown Margin |
BYRON 2003-0093, Issuance of Core Operating Limits Report for Byron Unit One Cycle 13 | 7 October 2003 | Issuance of Core Operating Limits Report for Byron Unit One Cycle 13 | Shutdown Margin |
BYRON 2003-0110, October 2003 Monthly Operating Report for Byron Station, Units 1 and 2 | 14 November 2003 | October 2003 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2003-0114, Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | 12 December 2003 | Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Through-Wall Leak |
BYRON 2003-0115, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | 12 December 2003 | Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | Boric Acid VT-2 |
BYRON 2003-0116, November 2003 Monthly Operating Report for Byron Station Units 1 and 2 | 15 December 2003 | November 2003 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0002, December 2003 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 January 2004 | December 2003 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12) | 12 January 2004 | Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12) | Boric Acid Hydrostatic Nondestructive Examination VT-2 Moisture barrier Pressure Boundary Leakage |
BYRON 2004-0017, January 2004 Monthly Operating Report for Byron Station Units 1 and 2 | 13 February 2004 | January 2004 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0028, February 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | 15 March 2004 | February 2004 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2004-0030, Annual Environmental Operating Report | 16 April 2004 | Annual Environmental Operating Report | |
BYRON 2004-0033, Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination | 31 March 2004 | Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination | |
BYRON 2004-0035, Regulatory Commitment Change Summary Report | 1 April 2004 | Regulatory Commitment Change Summary Report | Grace period |
BYRON 2004-0036, Issuance of Core Operating Limits Report, Cycle 12 | 5 April 2004 | Issuance of Core Operating Limits Report, Cycle 12 | Shutdown Margin |
BYRON 2004-0037, March 2004 Monthly Operating Report for Byron Units 1 & 2 | 15 April 2004 | March 2004 Monthly Operating Report for Byron Units 1 & 2 | Offsite Dose Calculation Manual |
BYRON 2004-0038, Steam Generator Tube Repairs Resulting from Byron, Unit 2, Cycle 11 Refueling Outage | 17 April 2004 | Steam Generator Tube Repairs Resulting from Byron, Unit 2, Cycle 11 Refueling Outage | |