Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000456/LER-2016-00128 April 2016Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs
LER 16-001-00 for Braidwood, Unit 1, Regarding Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs
Unanalyzed Condition
Fire Watch
05000456/LER-2016-00219 July 2016Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions
LER 16-002-00 for Braidwood, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions
Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Enforcement Discretion
Tornado Generated Missile
Tornado Missile Protection
05000456/LER-2021-001, Forward LER 2021-001-00 for Braidwood Station, Unit 1, Train a and B Source Range Neutron Flux Trip Functions Bypassed During Plant Startup21 June 2021Forward LER 2021-001-00 for Braidwood Station, Unit 1, Train a and B Source Range Neutron Flux Trip Functions Bypassed During Plant Startup
05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case17 November 2023Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case
CP-202000285, Pressure and Temperature Limits Report (Ptlr), ERX-07-003, Revision 522 April 2020Pressure and Temperature Limits Report (Ptlr), ERX-07-003, Revision 5Hydrostatic
Pressure and Temperature Limits Report
IR 05000045/200730120 December 2007Er 05000456-07-301; 0500045-07-301; 12/03/07 - 12/10/07; Braidwood Station, Units 1 and 2; Initial License Examination ReportPost Accident Monitoring
Significance Determination Process
Job Performance Measure
IR 05000219/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000452/20070012 March 2007EOC Annual Assessment Letter (Report 05000452-07-001; 05000457-07-001)
IR 05000454/201101516 June 2011IR 05000456-11-012; 05000457-11-012; 05000454-11-015; 05000455-11-015, on 3/31/2011 - 5/4/2011; Braidwood and Byron Stations, Units 1 & 2; Special InspectionUnanalyzed Condition
Past operability
Significance Determination Process
IR 05000454/20120121 May 2014Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000456/20015004 August 2015IR 05000456/20015002; 05000457/2015002, on 04/01/2015 - 06/30/2015, Braidwood Station, Units 1 & 2; Inservice Inspection Activities; Maintenance EffectivenessBoric Acid
High winds
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Water Inventory Control
Weld Overlay
Internal Flooding
Enforcement Discretion
Met Tower
Nondestructive Examination
Temporary Modification
Nuclear Accident Reporting System
VT-2
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Process Control Program
Operability Determination
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
IR 05000456/200200323 July 2002IR 05000456-02-003, IR 05000457-02-003, on 02/04/2002 -02/22/2002, Braidwood Station Units 1 & 2. NOV - Final Significance Determination for White FindingCondition Adverse to Quality
Significance Determination Process
IR 05000456/200200429 April 2002IR 05000456/2002-004(DRP), Braidwood, Unit 1 on 02/15/2002. Supplemental Inspection to Access Evaluation of Unavailability/Fault Exposure Time for 1B Auxiliary Feedwater Train Exceeding Nrc'S Performance Indicator Threshold During Last QuarProbabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
IR 05000456/200200622 July 2002IR 05000456-02-006, 05000457-02-006, on 04/01-06/30/2002, Exelon Generation Co, LLC; Braidwood Station; Units 1 & 2. Areas Inspected: Fire Protection, Refueling & Other Outage Activities & Identification & Resolution of ProblemsSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Fire Barrier
Probabilistic Risk Assessment
VT-2
Locked High Radiation Area
Test box
Significance Determination Process
Operability Determination
Fire Protection Program
Power Uprate
IR 05000456/200200722 October 2002IR 05000456-02-007 & IR 05000457-02-007, on 07/01/2002 Through 09/30/2002, Braidwood Station, Units 1 & 2. Fire Protection, Maintenance Effectiveness & Maintenance Risk Assessments & Emergent Work ControlSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Scaffolding
Power change
IR 05000456/200200924 January 2003IR 05000456-02-009, 05000457-02-009; Exelon Generation Company, LLC; on 10/01-12/31/02, Braidwood Station; Units 1 and 2. Operability EvaluationsSafe Shutdown
Shutdown Margin
High Radiation Area
Fire Barrier
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Maintenance Rule Program
Continuous fire watch
Fire Protection Program
Fire Watch
Scaffolding
IR 05000456/200201031 December 2002IR 05000456-02-010 DRP, on 11/04 - 12/04/2002, Braidwood Station Unit 1. Supplemental Inspection - Mitigation Systems CornerstoneProbabilistic Risk Assessment
Battery sizing
Maintenance Rule Program
IR 05000456/200230125 July 2002Er 05000456-02-301, Er 05000457-02-301, on 07/8-18/2002, Exelon Generation Co., LLC, Braidwood Station, Units 1 & 2. Initial License Examination Report. Six RO & Five SRO Applicants Passed Written Exam & Operating TestsJob Performance Measure
IR 05000456/20030014 March 2003Annual Assessment Letter - Braidwood Units 1 & 2 - (05000456-03-001; 05000457-03-001)
IR 05000456/200300325 July 2003IR 05000456-03-003; 05000457-03-003, on 04/01/03 - 06/30/03; Braidwood Station, Units 1 and 2; Routine Baseline Inspection ReportSafe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Past operability
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Operability Determination
Maintenance Rule Program
Scaffolding
Operability Assessment
Siren
IR 05000456/200300418 April 2003IR 05000456-03-004, IR 05000457-03-004, on 03/10-13/2003, Exelon Generation Company, LLC; Braidwood Station, Units 1 & 2. Ti 2515/148, Verification of Compliance with Interim Compensatory Measures Order
IR 05000456/200300521 August 2003IR 05000456-03-005 (Drs), IR 05000457-03-005 (DRS) on 06/23-07/11/03; Exelon Generation Company, LLC, Braidwood Station, Units 1 & 2; Fire Protection Triennial. Non-Cited Violations NotedHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Significance Determination Process
Operability Determination
Fire Protection Program
IR 05000456/200300628 October 2003IR 05000456-03-006, 05000457-03-006, 07/01/03 - 09/30/03; Braidwood Station, Units 1 & 2; Performance Indicator VerificationHigh Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Annual Radiological Environmental Operating Report
Maintenance Rule Program
Power Uprate
IR 05000456/200300826 January 2004IR 05000456-03-008; IR 05000457-03-008, on 10/01/2003 - 12/31/2003; Braidwood Station, Units1&2; Operability EvaluationsSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Pressure Boundary Leakage
Substantial potential for an overexposure
Power change
Unidentified leakage
Overexposure
IR 05000456/200300914 November 2003IR 05000456-03-009(DRP); IR 05000457-03-009(DRP); on 9/22-10/15/2003; Braidwood Station; Units 1 & 2. Accelerated Identification and Resolution of Problems InspectionForeign Material Exclusion
Operability Determination
IR 05000456/20040014 March 2004Annual Assessment Letter, Braidwood (IR 05000456-04-001 and IR 05000457-04-001)
IR 05000456/200400323 April 2004IR 05000456-04-003, IR 05000457-04-003, on 01/01/04 - 03/31/04, for Braidwood Station, Units 1 and 2; Routine Integrated Inspection ReportTime of Discovery
Fire Barrier
Temporary Modification
Process Control Program
Operability Determination
Maintenance Rule Program
IR 05000456/200400420 July 2004IR 05000456-04-004, 05000457-04-004, on 04/01/04 - 06/30/04; Braidwood Station, Units 1 & 2; Adverse Weather Protection and Operability EvaluationsHigh winds
High Radiation Area
Fire Barrier
Internal Flooding
Hydrostatic
Temporary Modification
Significance Determination Process
Large early release frequency
Operability Determination
Earthquake
Maintenance Rule Program
Scaffolding
Operability Assessment
IR 05000456/200400525 June 2004IR 05000456-04-005, on 05/25/2004 Through 05/27/2004, for Braidwood Station, Unit 1; Supplemental Inspection - Mitigating Systems CornerstoneCondition Adverse to Quality
Operability Determination
IR 05000456/200400621 October 2004IR 05000456-04-006, 05000457-04-006, on 04/06/2004 - 04/09/2004; Exelon Nuclear Corporate, Mid-West Rog Headquarters and 10/04/2004 - 10/17/2004; Braidwood Nuclear Power Station; Security Review of Access Authorization, Access Control, Fitn
IR 05000456/200400729 October 2004IR 05000456-04-007, 05000457-04-007; on 07/01/2004 - 09/30/2004; Braidwood Station, Units 1 and 2; Post-Maintenance and Surveillance Testing
IR 05000456/200400826 January 2005IR 05000456-04-008; 05000457-04-008, on 10/01/2004 - 12/31/2004; Braidwood Station, Units 1 & 2; Operator Performance During Non-Routine Evolutions and EventsSafe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
VT-2
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Power change
Overexposure
IR 05000456/20040096 December 2004IR 05000456-04-009 (Drs); 05000457-04-009 (Drs), on 11/15/2004 - 11/19/2004; Braidwood Station; Emergency Preparedness Specialist Report
IR 05000456/200500227 April 2005IR 05000456-05-002, IR 05000457-05-002 on 01/01/2005 - 03/31/2005 for Braidwood Station, Units 1 & 2; Fire ProtectionUltimate heat sink
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Rod Drop Event
Maintenance Rule Program