Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML17347A797 | 16 June 1988 | Seismic Hazard Data Prepared for Resolution of USI A-46. | Earthquake |
ML17347A798 | 16 June 1988 | Radiological Data Prepared for Resolution of USI A-46. | Safe Shutdown Earthquake Earthquake Backfit |
ML17347B462 | 31 December 1989 | App a to USI A-46 & Generic Ltr 87-02. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Backfit |
ML18008A031 | 31 July 1989 | NTH-TR-01 Decrease in Heat Removal by Secondary Sys. | Safe Shutdown Rod Drop Event |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML18092B497 | 3 April 1987 | S-C-E500-NSE-0675-R-1, Justification for Operation of All Three Units at Artificial Island at Increased Power During Hope Creek-Keeney Line Outage. | |
ML18093A179 | 19 June 1987 | Installation of Trip-A-Unit Protection Scheme Suppl Info Salem & Hope Creek Generating Stations. | |
ML18094A355 | 30 April 1989 | Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. | Safe Shutdown Earthquake |
ML18130A395 | 10 November 1983 | VEPCO North Anna Power Station & Surry Power Station Compliance W/10CFR50.49(b)(2). | |
ML18139B819 | 31 March 1982 | Nine-Month Response to NRC Ltr Dtd 801220 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2. | Control of Heavy Loads |
ML18139B925 | 30 June 1982 | PWR Safety & Relief Valve Adequacy Rept for North Anna Units 1 & 2. | Loop seal Stroke time |
ML18139C010 | 31 August 1982 | PWR Safety & Relief Valve Test Program,Porv Block Valve Adequacy Rept for Vepco,North Anna Unit 1 & Unit 2. | Stroke time Control of Heavy Loads |
ML18139C291 | 30 April 1982 | Evaluation of Online Boron Analyzers, Final Rept | Boric Acid High Radiation Area Grab sample |
ML18141A468 | 20 January 1984 | Safety Parameter Display Sys SAR for NUREG-0696 Computer Project,North Anna & Surry Nuclear Power Stations. | Boric Acid Shutdown Margin Reactor Vessel Water Level Fuel cladding |
ML18151A135 | 28 August 1987 | Rev 1 to SPDS SAR for VEPCO NUREG-0696 Computer Project, North Anna & Surry Nuclear Power Stations. | Fuel cladding |
ML19256B819 | 30 June 1979 | Revised Response to Branch Technical Position,Auxiliary & Power Conversion Sys Branch,9.5-1 App a Re Fire Protection Review | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Coatings Emergency Lighting Fuel cladding Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding |
ML19316B225 | 31 May 1980 | Westinghouse Multiple Aperture Small Break ECCS Analyses. | Loop seal Hydrostatic Fuel cladding |
ML19323A162 | 26 March 1980 | TMI-Plus One:Toward a Safer Nuclear Power Program. | |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML19331C693 | 31 August 1980 | Basis for Auxiliary Feedwater Sys Flow Requirements. Response to Encl 2 of NRC 800310 Ltr | |
ML19338F565 | 10 October 1980 | Special Low Power Tests Safety Evaluation. | Shutdown Margin |
ML19339C923 | 10 October 1980 | Analysis of Duke McGuire Containment Shell to Determine Response of Critical Panel to Uniform Internal Pressure. | Finite Element Analysis |
ML19341D400 | 2 March 1981 | Review of Piping Seismic Analysis Methods. | Safe Shutdown Earthquake Earthquake |
ML19343A805 | 17 November 1980 | Analysis of Hydrogen Control Measures at McGuire Nuclear Station, Vols 1 & 2 | |
ML19344A625 | 2 May 1977 | Evaluation of Effects of Postulated Pipe Failures Outside Containment for Facility. Oversize Drawings Encl | |
ML19350A234 | 15 January 1981 | Some Very Preliminary Results of Short-Term Analysis (3-Wk Study) of Hydrogen Combustion During Degraded Core Accidents in Sequoyah Nuclear Power Plant in Presence of Glow Plugs. | |
ML19350B592 | 9 January 1981 | Evaluation of Glow Plug Igniter Concept for Use in Sequoyah Nuclear Power Plant. | |
ML19350B752 | 20 January 1980 | Nuclear Reactor Accidents:Value of Improved Containment. Related Correspondence | |
ML19351F869 | 17 February 1981 | Vol 2 Errata for Analysis of Hydrogen Control Measures at McGuire Nuclear Station. | |
ML19351F872 | 17 February 1981 | Vol 4 of Analysis of Hydrogen Control Measures at McGuire Nuclear Station. | Safe Shutdown Boric Acid Coatings Emergency Lighting Finite Element Analysis |
ML20003G383 | 18 March 1981 | Evaluation of Nc Site-Specific Radiological Emergency Response Plan for Plant Mcguire. Related Documentation Encl | |
ML20004C309 | 28 February 1981 | Some Hydrogen Control Considerations for Ice-Condenser Nuclear Plants. | |
ML20005G421 | 28 February 1989 | Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. | Hydrostatic |
ML20008D874 | 30 October 1980 | Special Low Power Tests Safety Evaluation. | Shutdown Margin Thermal fatigue |
ML20011E253 | 31 July 1989 | Arrotta Validation & Verification - Std Benchmarks Set. | Safe Shutdown |
ML20011E255 | 30 April 1986 | Draft Arrotta:Advanced Rapid Reactor Operational Transient Analysis Computer Code Documentation Package,Vol 1:Theory & Numerical Analysis. | |
ML20023B396 | 31 October 1982 | Const Project Evaluation for Catawba Nuclear Station. | Hydrostatic Coatings Fire Protection Program Scaffolding |
ML20023D146 | 27 August 1982 | Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. | |
ML20023D213 | 25 August 1982 | Rev 1 to LaSalle County Station Technical Proposal, Including Scope of Work,Work Plan to Accomplish Independent HVAC Review,Organization Chart & Resumes of Personnel Assigned to Project.List of Matl Specs for HVAC Const Encl | Coatings Nondestructive Examination Liquid penetrant Scaffolding |
ML20023E221 | 15 March 1983 | Priority Concerns of Licensed Nuclear Operators at TMI & Oyster Creek & Suggested Action Steps, Final Rept | |
ML20023E223 | 28 February 1983 | Review of Current & Projected Expenditures & Manpower Utilization for Gpu Nuclear Corp. | |
ML20024B306 | 30 April 1983 | Determining Portion of Regulatory Burden on Indian Point 3 Capital & O&M Expenditures 1976 - 1986:10-Yr Cost Projection Also Included. | Hydrostatic Probabilistic Risk Assessment |
ML20028F728 | 8 August 1977 | Control Complex Bldg High Strength Bolting Operation Insp & Testing Checkoff Sheet | |
ML20028G618 | 15 February 1983 | Rev 6 to Analysis of Hydrogen Control Measures at McGuire Nuclear Station. | Safe Shutdown Emergency Lighting |
ML20039D708 | 21 December 1981 | to Evaluation of Effects of Postulated Pipe Failures Outside Containment for McGuire Nuclear Station. | |
ML20039E177 | 31 October 1981 | Revision I of Analysis of Hydrogen Control Measures at McGuire Nuclear Station, Vol III | |
ML20040B390 | 22 January 1982 | Analysis of Hydrogen Control Measures at McGuire Nuclear Station, Revision 2 |