 Issue dateTitleTopic
L-91-002, Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl4 January 1991Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl
LD-93-003, Part 21 Rept Re Defect in Potter & Brumfield Model 170-1 Relay.One of Two Rotor Return Springs Broke & Portion of Spring Lodged Between Rotor & Stator.Rotor Springs Supplied by Lewis Spring Co.Info Bulletin Being Prepared13 January 1993Part 21 Rept Re Defect in Potter & Brumfield Model 170-1 Relay.One of Two Rotor Return Springs Broke & Portion of Spring Lodged Between Rotor & Stator.Rotor Springs Supplied by Lewis Spring Co.Info Bulletin Being Prepared
LD-93-177, Part 21 Rept Re Potter & Brumfield motor-driven Relays Models 7032,7033 & 7034 Supplied by ABB/C-E to Entergy Operations Waterford Steam Electric Station,Unit 3.Eighty- Two Percent of Affected Relays Tested23 December 1993Part 21 Rept Re Potter & Brumfield motor-driven Relays Models 7032,7033 & 7034 Supplied by ABB/C-E to Entergy Operations Waterford Steam Electric Station,Unit 3.Eighty- Two Percent of Affected Relays TestedCommercial Grade Dedication
LD-94-019, Suppl Part 21 Rept Re Notification of Potential Defect in motor-driven Relays Supplied by ABB-CE to Waterford Steam Electric Station Unit 3.Entergy Oparations Aware of Info16 March 1994Suppl Part 21 Rept Re Notification of Potential Defect in motor-driven Relays Supplied by ABB-CE to Waterford Steam Electric Station Unit 3.Entergy Oparations Aware of Info
LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power15 April 1996Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power
LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-00414 August 1997Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004
LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys13 October 1997Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys
LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 97120120 November 1997Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201
ML17223A74526 January 1990Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N
ML18065B01118 October 1996Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology
ML18065B1356 January 1998Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency
ML19208A96114 September 1979Interim Deficiency Rept 13 Re Improper Consolidation of Concrete on Containment Bldg Dome Parapet Wall Placement 521-1B.Vibrators,laborers & Inspectors Were Added to Ensure Proper Placement of Concrete.Next Rept Issue Date Is 800201High winds
Tornado Generated Missile
ML19209A75928 September 1979Discusses Status of Const Deficiency 11.Planned Mod of Switchgear Breaker Position Will Be Delayed Due to Shipping Date Slippage.Final Rept Will Be Submitted by 791201
ML19209C42428 September 1979Potential Reportable Incident 21 Re Pressure Transmitter lift-off Voltage Problem.Device Will Not Start in Certain Combinations.Since Problem Does Not Exceed Tech Spec Limits, Failure Should Not Be Classified as RO
ML19250A63814 September 1979Interim Deficiency Rept 13:during Placement of Concrete for Reactor Containment Bldg,Improper Consolidation of Concrete Observed.Testing & Repair Underway.Final Rept by 800201
ML19250A64028 September 1979Deficiency Rept 21:Rosemont 1153A Transmitter Would Not Start for Certain Combinations of Power Supply Voltage,Zero Suppression or Ambient Temp.No Liftoff Voltage Problems If Power Supply Voltage Exceeds 30 Volts
ML19253A57031 August 1979Final Rept of Significant Const Deficiency 12 Re 4-inch,45 Degree Ell & 4-inch,90 Degree Ell Pipe Fittings Subj to Cracking When Welded.Caused by Erroneous Identification of Piping Matl as High Carbon Steel
ML19253A83031 August 1979Final Deficiency Rept Re Matl Used to Construct Pipe Fittings.Corrective Actions:Manufacturer Has Been Notified of overly-high Carbon Content in Steel Pipe Fittings & Those Already Installed Have Been Removed from Svc
ML19256E85229 October 1979Significant Const Deficiency 13,interim Rept,Suppl 1,re Reactor Containment Bldg Dome Concrete. Calculations Indicate Only Small Portion of Wall Lowers Dome Support Framework
ML19257C9708 January 1980Part 21 Rept 80-190-000:spring Used in Some NH91-96 & 98 Milliampere Hydramotor Acuators Discovered Mfg from Incorrect Matl.Notifications to Affected Customers Encl
ML19257D77930 January 1980Interim Deficiency Rept Re LPIS Pumps Impeller Shaft Retaining Mechanism Failure.Repairs on One Pump Complete; Repairs on Second Pump Delayed Until Apr 1980.Final Rept Will Be Forwarded on 800501
ML19257D78030 January 1980Interim Deficiency Rept Re Reactor Containment Dome.Initial Date of 800201 for Final Rept Cannot Be Met.All Repairs Complete W/Verification Testing Currently Underway.Final Rept Will Be Forwarded 800415
ML19260B19130 November 1979Deficiency Rept 11 Re Switchgear Breaker Position Switch Operator Defect.Replacement Installation Expected in Dec. Final Rept to Be Submitted by 800331
ML19260C5482 January 1980Interim Rept of Const Deficiency 15:on 791126,procedural & Performance Deficiencies Identified in Ultrasonis Testing of Structural Welds.Ebasco Engineering Studying Methods to Ensure That Affected Welds Meet Design Requirements
ML19273C19529 October 1979Significant Const Deficiency 14 Interim Rept, Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4. Caused by Fatigue Produced by Typical Dynamic Events.Matl Returned to Manufacturer for Repair
ML19296B58430 November 1979Advises of Addl Time Required to Close Out Const Deficiency Re Noncompliance W/Welding Requirements for Heating, Ventilation & Air Conditioning Seismic Support Hangers.Final Rept Will Be Submitted on 790331
ML19305A89314 March 1980Discusses Status of Deficiency Re Const of Shafts,Springs & Roller Pin of Emergency Diesel Generators.Delays Encountered W/Hoisting Mechanism of Overhead Monorail Crane.Final Rept Will Be Submitted by 800930
ML19305E44318 March 1980Final Deficiency Rept Re Switchgear Breaker Position Switch Operator Defect.All 33 Breaker Switch Operators Have Been Replaced W/More Rigid Design Assemblies
ML19305E63128 April 1980Final Rept on Deficiency Re Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4 Supplied by Associated Piping & Engineering Corp.Matl Returned to Vendor for Mod &/Or Replacement.Test Results Now AcceptableHydrostatic
ML19308A22229 December 1978Addl Interim Report of Significant Const Deficiency 9, Noncompliance to Welding Requirements for HVAC Seismic Support Hanger to Embedded Plates. in Addition to Immediate Corrective Actions,Hanger to Plate Welds Are Being RepairedNondestructive Examination
Liquid penetrant
ML19309A79418 March 1980Final Rept of Significant Deficiency 11,re Switchgear Breaker Position Switch Operator defect.Thirty-three Breaker Position Switch Operators Replaced W/Newly Designed GE Assemblies.Operators Have Guides Preventing Bending
ML19309B89731 March 1980Final Deficiency Rept Re Noncompliance to Welding Requirements for Heating,Ventilation & Air Conditioning Seismic Support Hanger to Embedded Plates.All Affected Welds Repaired & Insps Documented for QA FilesTime of Discovery
ML19309F2018 April 1980Final Rept of Significant Const Deficiency 13 Re Defects in Containment Bldg Dome Concrete.Caused by Improper Random Vibration Due to Vibrators That Were Inadequate in Size & Number.Qualified Job Superintendent Will Be Provided
ML19309F9288 April 1980Supplementary Deficiency Rept Re AH90 & NH90 Series Actuators Supplied by Itt General Controls.Itt General Control Will Supply Actuator Force Values & Torque & Damper Torque Values Will Be Compared.Customer List Encl
ML19309G37230 April 1980Final Rept of Significant Const Deficiency 14 Re Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4.Cause Not Stated.Scope of QC Personnel Indoctrination Increased Re Emphasis on Preparation of Qc/Qa RecordsHydrostatic
ML19309G79318 April 1980Final Rept of Significant Const Deficiency 14 Re Unsatisfactory Impact Tests on Pipe Penetration Assemblies. QC Training Program Provides More Emphasis on Preparation of Qc/Qa Records.Penetration Assemblies Were ReturnedHydrostatic
ML19318A05110 June 1980Final Deficiency Re Loose Control Element Drive Mechanism Guide cones.C-E Secured & Tightened Each Guide Cone to 60 Ft Lb Torque Value.Completed Spot & Tack Welds Visually Inspected & Approved
ML19318D2382 July 1980Interim Rept of Significant Const Deficiency 17 Re Base Metal Defects in Main Steam & Feedwater Containment Penetration Anchors.Evaluation Underway to Establish Repair Techniques.Final Rept Will Be Forwarded by 810301
ML19320A60127 June 1980Final Significant Const Deficiency Rept 16 Re Control Element Drive Mechanism Guide Cones & Penetration Assemblies Interface.Offset Condition Exists Which Could Produce Interference on Control Assembly ShaftLiquid penetrant
ML19321A8968 July 1980Interim Part 21 Rept Re Defective Itt Actuators in Dampers. Customer Notification Encl.Jobs Classified Nonnuclear safety-related Are Not Reportable.Actuators Supplied for Other Jobs Are Considered Purchaser Responsibility
ML19322A15727 December 1978Bolted Connections That Connect Horizontal Channel Sections of the Termination Subassembly to the Header Mounting Brackets Were Loose or Disengaged.Termination sub-assembly Connections Were Redesigned to Use Welded Pemnuts
ML19323D52931 March 1980Final Rept of Significant Const Deficiency 9,re Welding of Heating,Ventilation & Air Conditioning Seismic Support Hangers to Embedded Plates.Caused by Engineering Error. Contractor Initiated Repairs for Hanger to Embedded PlatesTime of Discovery
ML19323F81921 May 1980Final Const Deficiency Rept 5 Re Impeller Shaft Retaining Mechanism Failure in Low Presssure Safety Injection Pumps, Discovered on 780216.Exact Cause Not Known But May Be Due to Gasket Deterioration.Locking Devices Modified
ML19323J15810 June 1980Final Rept of Significant Const Deficiency 7 Re Loose Control Element Drive Mechanism Guide cones.C-E Completed Corrective Repairs During Wk Ending 800315.Guide Cones Were Firmly Locked in Place,Torqued & Spot Welded
ML19330A79720 June 1980Part 21 Rept Re Potential Interference in Full Function of Bergen-Paterson Strut Assembly W/Pacific Scientific Co Mechanical Shock Arrestor.Customers Will Be Notified of Affected Items & Recommended Solution
ML19330B66431 July 1980Final Deficiency Rept for Significant Const Deficiency 15 Re Procedural & Performance Deficiencies in Ultrasonic Testing of Structural Welds.Caused by Mfg Procedural & Ebasco ASME Insp Deficiencies.Mfg & Insp Responsibilities EstablishedCoatings
ML19338C78929 August 1980Deficiency Rept Re Cracking Problem in Electrical Wiring Conduit.Caused by Overbending Below Original Published Min Inside Bend Diameters.Will Replace Conduits Installed at Bend Diameters Below Min Inside Bend Diameter
ML19338E9501 October 1980Rept on Significant Const Deficiency 18 Re Flexible Liquid Tight Wiring Conduit Covering Failure (Anaconda).Deficiency Under Evaluation.Rept Will Be Submitted by 801017
ML19340D05515 December 1980Interim Significant Deficiency Rept 19,Target Rock Motor Operated Valves-Bushing Not Staked. High Pressure Safety Injection Header Shutoff Valve Found W/Loose Bushing. Bushings Will Be Corrected & Insp by 810630