Discusses Status of Const Deficiency 11.Planned Mod of Switchgear Breaker Position Will Be Delayed Due to Shipping Date Slippage.Final Rept Will Be Submitted by 791201
ML19209A759
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/28/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To:
References
LPL-12102, NUDOCS 7910050342
Download: ML19209A759 (1)


Text

.

3 b LOUISIANA 242 octana . e srn m P O W E R & L I G H T! P o. cox 6008

  • NEW CALEANS. LOUIStANA 70174

+ 1504) 366-2345 Sepi.c-b er 28, 1979 0 L AS AELL Va Prescent t : e petoucte LPL 12102 Q-3-A35.07.ll Mr. K.V. Seyfrit, Director, Region IV U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 SLTJECT: Waterford SES Unit 3 Docket No. 50-382 Status of Significant Construction Deficiency No. 11 Switchgear Breaker Position Switch Operator Defect

Dear Mr. Seyfrit:

As discussed with your Mr. Stewart, the planned modification of the switch-gear breaker position switch operators will be delayed due to the slippage of the planned shipping date of the replacement parts. We now expect to be able to submit the final report by December 1, 1979.

Yours very truly, D.L. Aswell DLA/TFG/ys cc: Director Office of Inspection and Enforcement U.S. Nuclear Rcgulatory Commission Washington, D.C. 20555 Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commissica Washington, D.C. 20555 \

%P 1126 207 S

7 910050 SV2' y