Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000298/LER-1978-029, Forwards LER 78-029/03L-012 September 1978Forwards LER 78-029/03L-0
05000298/LER-1978-030, Forwards LER 78-030/03L-012 September 1978Forwards LER 78-030/03L-0
05000298/LER-1978-038, Forwards LER 78-038/03L-027 December 1978Forwards LER 78-038/03L-0
05000298/LER-1978-039, Forwards LER 78-039/03L-05 January 1979Forwards LER 78-039/03L-0
05000298/LER-1980-051, Forwards LER 80-051/03L-013 January 1981Forwards LER 80-051/03L-0
05000298/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Submitted28 May 1982Forwards LER 82-009/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Submitted1 June 1982Forwards LER 82-010/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-011, Forwards LER 82-011/03-0.Detailed Event Analysis Submitted11 June 1982Forwards LER 82-011/03-0.Detailed Event Analysis Submitted
05000298/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted21 June 1982Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted28 June 1982Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-015, Forwards LER 82-015/03L-0.Detailed Event Analysis Submitted5 August 1982Forwards LER 82-015/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-016, Forwards LER 82-016/03L-0.Detailed Event Analysis Submitted10 August 1982Forwards LER 82-016/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-017, Forwards LER 82-017/03L-0.Detailed Event Analysis Submitted10 August 1982Forwards LER 82-017/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-018, Forwards LER 82-018/03L-0.Detailed Event Analysis Submitted26 August 1982Forwards LER 82-018/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Submitted13 August 1982Forwards LER 82-019/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Submitted22 October 1982Forwards LER 82-020/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-023, Forwards LER 82-023/03L-0.Detailed Event Analysis Submitted23 December 1982Forwards LER 82-023/03L-0.Detailed Event Analysis Submitted
05000298/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Submitted15 February 1983Forwards LER 82-026/03L-0.Detailed Event Analysis SubmittedHalf scram
05000298/LER-1983-001, Forwards LER 83-001/03L-0.Detailed Event Analysis Submitted17 March 1983Forwards LER 83-001/03L-0.Detailed Event Analysis Submitted
05000298/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Submitted17 March 1983Forwards LER 83-002/03L-0.Detailed Event Analysis Submitted
05000298/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Submitted29 April 1983Forwards LER 83-003/03L-0.Detailed Event Analysis Submitted
05000298/LER-1983-004, Forwards LER 83-004/03L-0.Detailed Event Analysis Submitted29 April 1983Forwards LER 83-004/03L-0.Detailed Event Analysis Submitted
05000298/LER-1983-013, Forwards LER 83-013/03L-0.Detailed Event Analysis Encl27 September 1983Forwards LER 83-013/03L-0.Detailed Event Analysis Encl
05000298/LER-1985-011, Identifies Defect in Certain DC Motor Starters Used for Controlling ECCS & Primary Containment Isolation Valves, Initially Reported in 851119 LER 85-011.Certain Starters Missing Spacers,Causing Cracking of Disconnect Switch26 December 1985Identifies Defect in Certain DC Motor Starters Used for Controlling ECCS & Primary Containment Isolation Valves, Initially Reported in 851119 LER 85-011.Certain Starters Missing Spacers,Causing Cracking of Disconnect Switch
05000298/LER-1988-008, Forwards LER 88-008 & Rev 1 to LER 88-01630 June 1988Forwards LER 88-008 & Rev 1 to LER 88-016
05000298/LER-1992-003, Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells19 October 1992Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells
05000298/LER-1992-008, Forwards Corrected LER 92-008-00,containing Info Re Component Failure Inadvertently Omitted from Initial Submittal14 July 1992Forwards Corrected LER 92-008-00,containing Info Re Component Failure Inadvertently Omitted from Initial Submittal
05000298/LER-1992-019, Forwards Corrected LER 92-019-00,including Event Date Inadvertently Omitted from 930128 Memo29 January 1993Forwards Corrected LER 92-019-00,including Event Date Inadvertently Omitted from 930128 Memo
05000298/LER-1994-029, Informs NRC That Plant Will Not Be Submitting LER 94-029. Number Internally Assigned to Potentially Reportable Condition That Later Determined Not Reportable23 January 1995Informs NRC That Plant Will Not Be Submitting LER 94-029. Number Internally Assigned to Potentially Reportable Condition That Later Determined Not Reportable
05000298/LER-1995-020, Forwards Rev 1 to LER 95-020,identifying Conditions Affecting Originally Reported Cause & Corrective Actions,As Result of Further Investigation7 May 1996Forwards Rev 1 to LER 95-020,identifying Conditions Affecting Originally Reported Cause & Corrective Actions,As Result of Further Investigation
05000298/LER-1997-009, Forwards LER 97-009-01,clarifying Length of Time That a RPS Bus Was Supplied from Alternative Power Source.Info Supplied on Issue in Original LER Was Unclear & Subject to Misinterpretation3 October 1997Forwards LER 97-009-01,clarifying Length of Time That a RPS Bus Was Supplied from Alternative Power Source.Info Supplied on Issue in Original LER Was Unclear & Subject to Misinterpretation
05000298/LER-1997-010, Forwards LER 97-010-02 Restandby Gas Treatment Inoperability Due to Design Deficiency.Rev Provides Addl Info on Safety Significance of Event16 July 1998Forwards LER 97-010-02 Restandby Gas Treatment Inoperability Due to Design Deficiency.Rev Provides Addl Info on Safety Significance of Event
05000298/LER-1997-014, Forwards LER 97-014-00,for Which Addl Time Was Required to Provide Full & Accurate Description of Event & Safety Consequences12 December 1997Forwards LER 97-014-00,for Which Addl Time Was Required to Provide Full & Accurate Description of Event & Safety Consequences
05000298/LER-1997-015, Forwards LER 97-015-00,which Was Due on 971208.Requested Addl Time to Provide Full & Accurate Description of Event on 971208 Telcon W/Cs Marschall of NRC12 December 1997Forwards LER 97-015-00,which Was Due on 971208.Requested Addl Time to Provide Full & Accurate Description of Event on 971208 Telcon W/Cs Marschall of NRC
05000298/LER-1998-005, Forwards Rev 1 to LER 98-005 Which Corrects Administrative Errors on Page 2 of Rept14 May 1998Forwards Rev 1 to LER 98-005 Which Corrects Administrative Errors on Page 2 of Rept
05000298/LER-1998-011, Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl19 January 1999Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl
05000298/LER-1998-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl16 March 1999Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments EnclMissed surveillance
05000298/LER-1999-001, Forwards LER 99-001-00,including List of NRC Commitments Made by Util22 March 1999Forwards LER 99-001-00,including List of NRC Commitments Made by Util
05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel23 August 1999Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support PersonnelStroke time
Enforcement Discretion
05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl28 June 1999Forwards LER 99-004-01.Commitments Made by Util Are EnclCorrosion bonding
05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1 July 1999Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl
05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl26 August 1999Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl
A800020, Responds to Re LWR Primary Coolant Sys Pressure Isolation Valves.Review Conducted of High Pressure Piping Penetrating Drywell & Connecting to Primary Coolant Sys. Forwards Drawings of Sys Connecting to Low Pressure Piping17 March 1980Responds to Re LWR Primary Coolant Sys Pressure Isolation Valves.Review Conducted of High Pressure Piping Penetrating Drywell & Connecting to Primary Coolant Sys. Forwards Drawings of Sys Connecting to Low Pressure Piping
A800058, Forwards Endorsement 41 to Maelu Policy MF-70 & Endorsement 51 to Nelia Policy NF-2007 May 1981Forwards Endorsement 41 to Maelu Policy MF-70 & Endorsement 51 to Nelia Policy NF-200
A810007, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/81-19.Corrective actions:1/2-inch Tolerance Between Weld & Edge of Overlay Was Specified for Dimensional Tolerances17 November 1981Responds to NRC Re Violations Noted in IE Insp Rept 50-298/81-19.Corrective actions:1/2-inch Tolerance Between Weld & Edge of Overlay Was Specified for Dimensional TolerancesWeld Overlay
A810017, Forwards Response to NRC 810306 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages4 May 1981Forwards Response to NRC 810306 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages
A820001, Advises That Commitment Date,Per ,Re NUREG-0737, Item II.A.1.2, Upgrade Emergency Support Facilities, Will Not Be Met,Due to Extensive Contractual Negotiations & Legal Reviews16 December 1982Advises That Commitment Date,Per ,Re NUREG-0737, Item II.A.1.2, Upgrade Emergency Support Facilities, Will Not Be Met,Due to Extensive Contractual Negotiations & Legal Reviews
A820002, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/82-16.Corrective Actions:Entry Ways Into Affected Area Posted,Locked or Observable to Radiographer. Disciplinary Action Taken Re Procedure 7.4.4,Revision 1210 September 1982Responds to NRC Re Violations Noted in IE Insp Rept 50-298/82-16.Corrective Actions:Entry Ways Into Affected Area Posted,Locked or Observable to Radiographer. Disciplinary Action Taken Re Procedure 7.4.4,Revision 12
A820015, Forwards Response to 10CFR50,App R Re Fire Protection Rule28 June 1982Forwards Response to 10CFR50,App R Re Fire Protection RuleSafe Shutdown
Exemption Request
A820016, Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation28 July 1982Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation