05000354/LER-1986-074, Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail12 November 1986
05000354/LER-1988-022, Special Rept 88-006-00:on 880826,HPCI Injection Occurred. Caused by Low Reactor Vessel Level Signal Following Reactor Scram Described in LER 88-022-00.HPCI Injection Nozzle Usage Factor Not Calculated21 November 1988
05000354/LER-1989-009, Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded17 May 1989
05000354/LER-1990-0085 July 1990
05000354/LER-1990-0095 July 1990
05000354/LER-1994-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC14 August 1995
05000354/LER-1995-003, Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 96010530 November 1995
05000354/LER-1995-016, Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable9 August 1995
05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable11 August 1995
05000354/LER-1995-033, Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program20 November 1996
05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-0011 March 1996
05000354/LER-1995-038, Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions14 March 1996
05000354/LER-1996-014, Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted14 May 1996
05000354/LER-1996-015, Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted10 May 1996
05000354/LER-1996-022, Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed31 January 1997
05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up6 December 1996
05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed20 January 1997
05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-0029 January 1997
05000354/LER-1997-002, Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures14 February 1997
05000354/LER-1997-004, Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed10 March 1997
05000354/LER-1997-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached25 April 1997
05000354/LER-1997-007, Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl7 May 1997
05000354/LER-1997-008, Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl19 June 1997
05000354/LER-1997-013, Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment1 October 1997
05000354/LER-1997-015, Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl31 July 1997
05000354/LER-1997-017, Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F28 August 1997
05000354/LER-1997-018, Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl27 August 1997
05000354/LER-1997-019, Forwards LER 97-019-00, Engineered Safety Feature Actuation Closure of B Safety Auxiliaries Cooling Sys to Turbine Auxiliaries Cooling Sys Isolation Valves. LER Is Being Submitted to Discuss 970807 & 970904 Events17 September 1997
05000354/LER-1997-020, Forwards LER 97-020-00 Re Past Inoperability of Safety Related Chiller Due to Operation W/Low Safety Auxiliary Cooling Sys Temp.Commitments Made by Util,Attached27 September 1997
05000354/LER-1997-021, Forwards LER 97-021-00 Entitled, Standby Liquid Control Sys Tank Concentration Below TS Limits. Commitments Made within Rept,Encl22 September 1997
05000354/LER-1997-022, Forwards LER 97-022-00 Re Unplanned Manual Scram Following Relay Malfunction in a Phase Main Generator step-up Transformer.Commitments Made by Util,Encl6 October 1997
05000354/LER-1997-023, Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl28 November 1997
05000354/LER-1997-024, Forwards LER 97-024-00 Re as Found Values for Safety Relief Valve Lift Setpoints Exceed Tech Spec Allowable Limits. Attachment a Represent Commitments Util Made to NRC Relative to LER20 October 1997
05000354/LER-1997-025, Forwards LER 97-025-00 Re Design Deficiency Potential for Unmonitored Release Path Through Station Svc Water Sys. Commitment Util Made to NRC Relative to Ler,Encl27 October 1997
05000354/LER-1997-026, Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed19 November 1997
05000354/LER-1997-031, Forwards LER 97-031-00 Re Reactor Core Isolation Cooling Sys Isolation.Commitments Made by Util Also Encl24 December 1997
05000354/LER-1997-032, Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl2 January 1998
05000354/LER-1997-034, Forwards LER 97-034-01, Condition Prohibited by Ts:Missed EDG Surveillance. Util Commitments to NRC Re Subj LER Encl6 April 1998
05000354/LER-1998-001, Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI16 March 1998
05000354/LER-1998-002, Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl20 April 1998
05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl7 May 1998
05000354/LER-1998-004, Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks22 June 1998
05000354/LER-1998-006, Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl13 October 1998
05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a4 May 1999
05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made26 March 1999
05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl8 April 1999
05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER15 June 1999
05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl14 July 1999
05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl20 September 1999
05000354/LER-2001-00210 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
10 CFR 50.73(a)(2)(i)

On June 22, 2001, the 'C' emergency diesel generator (EDG) heat exchanger cooling water outlet relief valve opened when two pumps were operating in the 'A' Safety Auxiliaries Cooling System (SACS) loop. The relief valve was set to open at 120 psig instead of the design setpoint of 150 psig.

During a postulated design basis event, pressure could have exceeded the lift setpoint, causing the valve to open. If automatic makeup to the 'A' SACS loop head tank was not available, operator action would be required to identify and correct the condition before loss of inventory resulted in loop inoperability. At the time of discovery, scheduled maintenance prevented the 'B' train of the Control Room Emergency Filtration (CREF) System from performing its design function. Thus, it is possible that neither CREF train would have been available during a postulated design basis event. The root cause was the failure to update the Bill of Material for relief valve 1EGPSV-2409C as part of a design change package. Upon discovery, the 'A' SACS loop was placed in a configuration that ensured system pressure would not exceed the lift setpoint for 1 EGPSV-2409C. The relief valves on the 'A', 'B', and 'D' EDGs were verified to have the correct lift setpoint. The 'B' CREF train was returned to OPERABLE status. Relief valve 1EGPSV-2409C was replaced with a valve with the correct lift setpoint.