Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML16355A3462016-12-14014 December 2016 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1) Project stage: Request ML17033A2832017-02-0606 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Section XI Requirements in Accordance with 10CFR 50.55a(z)(1) Project stage: Acceptance Review ML17031A1302017-02-23023 February 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17055C3602017-02-23023 February 2017 Submittal of Supplement to Proposed Alternative to ASME Section XI, Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Project stage: Supplement ML17030A0812017-02-24024 February 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 Project stage: Request ML17156A0832017-07-0303 July 2017 Non-Prop RAI - Regarding Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) (CAC Nos. MF8987-88) Project stage: RAI ML17251A8952017-08-31031 August 2017 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information Project stage: Response to RAI ML17264A2272017-10-20020 October 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17277A2962017-11-0202 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) Project stage: Withholding Request Acceptance ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) Project stage: Approval ML18068A0642018-03-26026 March 2018 Relief from the Requirements of the ASME Code Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) Project stage: Approval 2017-02-24
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Daniel G. Stoddard President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd. Glenn Allen, VA 23060-6711 February 6, 2017 SUBJECT: SURRY, UNIT NOS. 1 AND 2 -SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF CIRCULATING AND SERVICE WATER CLASS 3 BURIED PIPING IN ACCORDANCE WITH 1 OCFR 50.55a(z)(1) (CAC NOS. MF8987 AND MF8988) Dear Stoddard: By letter dated December 14, 2016 Agencywide Documents Access and Management System (ADAMS) Accession Number ML 16355A337), Virginia Electric and Power Company (Dominion), submitted a relief request (RR) for Surry Units 1 and 2. The relief request proposes an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, IWA-4000. The RR proposes to apply a carbon fiber reinforced polymer system for the internal repair of buried circulating water and service water piping at Surry Power Station Units 1 and 2. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. The NRC staff has reviewed your application and concluded that it did not provide the technical information in sufficient detail to enable the NRC staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed amendment/relief request in terms of regulatory requirements and the protection of public health and safety and the environment.
D. Stoddard -2 -In order to make the application complete, the NRC staff requests that Dominion supplement the application to address the information requested in the enclosure by February 27, 2017. This will enable the NRC staff to begin its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the staff's detailed technical review by separate correspondence. The information requested and associated time frame in this letter were discussed with Gary Miller of your staff on Monday, February 6, 2017. If you have any questions, please contact the Surry Project Manager, Karen Cotton Gross, at (301) 415-1438 or be e-mail at Karen.Cotton@nrc.gov. Docket Nos: 50-280 and 50-281 Enclosure: As stated cc w/encl: Distribution via Listserv Sincerely, Karen Cotton Gross, Project Manager Plant Licensing Branch 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation SUPPLEMENTAL INFORMATION NEEDED PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF CIRCULATING AND SERVICE WATER CLASS 3 BURIED PIPING IN ACCORDANCE WITH 10 CFR 50.55a(z)(1) VIRGINIA ELECTRIC AND POWER COMPANY. SURRY POWER STATION UNITS 1AND2 LIST OF INSUFFICIENCIES 1. American Society of Mechanical Engineers (ASME)Section XI, IWA-4221 (b) requires repair/replacement piping to meet the original Construction Code requirements for the Circulating Water (CW) and Service Water (SW) piping. However, the applicable Construction Code for Surry does not provide the requirements for the design, fabrication, installation, examination and testing of Carbon Fiber Reinforced Polymer (CFRP) in buried piping. The application identifies 15 separate repairs using CFRP. The submittal lacks sufficient analyses or technical evaluations to demonstrate structural integrity for these 15 separate repairs using CFRP. Attachment 5C, in Enclosure 5, of the application provides a typical calculation. a. Please provide a summary of design inputs to include loads, pressures, temperatures, geometrical inputs, CFRP layers, thicknesses, and bonding length used for the analysis and evaluations of these 15 repairs. b. Please provide a summary of the results of all analysis and evaluations to include circumferential design analysis, buckling evaluations, longitudinal design analysis, bond integrity at terminations for the applicable load combinations, corresponding allowable limits, and margins for each of 15 of the repairs using CFRP. 2. Analytical methodology Change: ASME Codes and Standards for piping analysis are discussed in Title 10 of the Code of Federal Regulations, Part 50.55a. Piping analysis for safety related class 3 piping in ASME Subsection ND does not utilize the Load and Resistance Factor Design (LRFD) method. The application describes using a LRFD methodology that has never been used for analysis of safety related class 3 piping. a. Please provide a justification and rationale for applying this LRFD methodology for safety related ASME Class 3 piping. b. Please provide a discussion of the analysis method used in the original design for class 3 circulating water and service water piping and any variances from applying both methods to include at the terminal ends where CFRP overlaps with the intact steel pipe.
D. Stoddard -3 -SUBJECT: SURRY, UNIT NOS. 1AND2-SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF CIRCULATING AND SERVICE WATER CLASS 3 BURIED PIPING IN ACCORDANCE WITH 10CFR 50.55a(z)(1) (CAC NOS. MF8987 AND MF8988) Date: February 6, 2017 DISTRIBUTION: PUBLIC Branch Reading File RidsACRS_MailCTR Resource RidsNrrEMCB Resource RidsNrrEPNB Resource RidsNrrDorl Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAGoldstien Resource RidsNrrPMKCotton Resource RidsRgnXMailCenter Resource ADAMS Accession No.: ML 17033A283 *by email correspondence OFFICE NRR/DORL/LPL2-1 /PM NRR/DORL/LPL2-1 /LA NRR/DE/EMCB/BC NAME KCotton KGoldstein JQuichocho* DATE 02/06/17 02/06/17 02/06/17 OFFICE NRR/DE/EMCB/BC N RR/DORL/LPL2-1 /BC NRR/DORL/LPL2-1 /PM NAME DAiiey* MMarkley KCotton DATE 12/28/16 02/06/17 02/06/17 OFFICIAL RECORD COPY