Letter Sequence RAI |
---|
|
|
MONTHYEARML16355A3462016-12-14014 December 2016 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1) Project stage: Request ML17033A2832017-02-0606 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Section XI Requirements in Accordance with 10CFR 50.55a(z)(1) Project stage: Acceptance Review ML17031A1302017-02-23023 February 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17055C3602017-02-23023 February 2017 Submittal of Supplement to Proposed Alternative to ASME Section XI, Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Project stage: Supplement ML17030A0812017-02-24024 February 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 Project stage: Request ML17156A0832017-07-0303 July 2017 Non-Prop RAI - Regarding Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) (CAC Nos. MF8987-88) Project stage: RAI ML17251A8952017-08-31031 August 2017 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information Project stage: Response to RAI ML17264A2272017-10-20020 October 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17277A2962017-11-0202 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) Project stage: Withholding Request Acceptance ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) Project stage: Approval ML18068A0642018-03-26026 March 2018 Relief from the Requirements of the ASME Code Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) Project stage: Approval 2017-02-24
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21049A2662021-02-16016 February 2021 NRR E-mail Capture - Surry, Units 1 and 2 - Final RAI Concerning the Leak-Before-Break (LBB) LAR ML21049A2672021-02-11011 February 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Draft RAI for the LBB LAR ML21020A1322021-01-19019 January 2021 NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML21020A1332021-01-13013 January 2021 NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML20315A3972020-11-10010 November 2020 Notification of NRC Supplemental Inspection (95001) and Request for Information - RA ML20156A0652020-06-0404 June 2020 NRR E-mail Capture - Final RAIs for Surry U1 Fall 2019 Sgtir Application ML20136A0102020-05-14014 May 2020 NRR E-mail Capture - Final RAIs Regarding Surry Units 1 & 2 LAR to Adopt 10 CFR 50.69 ML20134J1382020-05-0606 May 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20106E9552020-04-15015 April 2020 Program Inspection RFI ML20029D8382020-02-0505 February 2020 Email from T. Tran, Nmss/Drefs/Elrb; Re., Request for Additional Information - Surry SLRA Environmental Review ML20013C7282020-01-0909 January 2020 NRR E-mail Capture - Final RAI Regarding Surry'S TS One-Time 14-Day AOT RSST Cable Replacement LAR ML20007F7952020-01-0606 January 2020 NRR E-mail Capture - Surry RAI Regarding Its Rx Coolant P-T Limits LAR ML19323E2212019-11-13013 November 2019 NRR E-mail Capture - RAI on the SPS Rtb CT Extension LAR ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19296D8982019-10-23023 October 2019 NRR E-mail Capture - RAI for Surry ISTF-411 LAR to Extend Rx Trip Breakers TS CT to 24 Hours ML19283B6252019-10-0202 October 2019 Questions Related to Interval Visual Inspections in Lieu of External Visual Inspections ML19283B6232019-09-20020 September 2019 NRC Surry Draft RAI-Open Cycle Cooling Water (NRC TRP-20 James Gavula) ML19283B6282019-09-19019 September 2019 SLRA - Draft 3rd Round RAI - Selective Leaching (Trp 33) ML19283B6272019-09-18018 September 2019 SLRA - Clarification Call for 3rd Round RAI - Trp 14 (Buried Piping) ML19253C7532019-08-20020 August 2019 SLRA Transmittal Email Attachment 4D Confirmation Letter - August 20, 2019 ML19231A1532019-08-14014 August 2019 Final Requests for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 4 August 14, 2019. L-2018-RNW-0023/000951 ML19217A3582019-08-0202 August 2019 SLRA RAI Transmittal Email Set 3 with Attachments- 2-August 5, 2019 ML19192A2472019-07-10010 July 2019 Final Disposition List of Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application (L-2018-RNW-0023/000951) ML19184A1392019-07-0101 July 2019 SLRA Email Transmittal of Draft RAIs with Attachments - 29JUN2019 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19164A3332019-06-11011 June 2019 Final Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 2 June 11, 2019 ML19176A5262019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments June 11, 2019 ML19163A0182019-06-11011 June 2019 Transmittal Email Surry SLRA Draft RAI- 22 May 2019 ML19163A3962019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments - June 11, 2019 2023-07-06
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION July 3, 2017 Mr. Daniel G. Stoddard President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glenn Allen, VA 23060-6711
Subject:
SURRY POWER STATION UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF CIRCULATING AND SERVICE WATER CLASS 3 BURIED PIPING IN ACCORDANCE WITH 10 CFR 50.55A(z)(1) (CAC NOS. MF8987 AND MF8988)
By letter dated December 14, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16355A337), as supplemented by letter dated February 23, 2017 (ADAMS Accession No. ML17055C360), Virginia Electric and Power Company (the licensee) proposed an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, IWA-4000.
The licensee proposes to apply a carbon fiber reinforced polymer system for the internal repair of buried circulating water (CW) and service water (SW) piping at Surry Power Station Units 1 and 2.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. A draft copy of the enclosed request for additional information (RAI) was provided to Mr. Gary Miller of your staff via e-mail on May 10, 2017. The licensee agreed to provide the RAI response within 60 days from the date of this letter. Enclosures 1 and 2 to this letter are the proprietary and non-proprietary versions of the RAIs, respectively.
Enclosure 1 transmitted herewith contains Proprietary information. When separated from Enclosure 1, this document is decontrolled.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION If you have any questions, please contact me at 301-415-1438 or Karen.Cotton@nrc.gov.
Sincerely,
/RA MMahoney for/
Karen Cotton Gross, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosures:
- 1. RAI (Proprietary)
- 2. RAI (Non-proprietary) cc w/Encl 2: Distribution via Listserv OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION ENCLOSURE 2 (NON-PROPRIETARY)
REQUEST FOR ADDITIONAL INFORMATION PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF CIRCULATING AND SERVICE WATER CLASS 3 BURIED PIPING VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-280 AND 50-281 CAC NOS. MF8987 AND MF8988 By letter dated December 14, 2016 (Agencywide Documents Access and Management System Accession No. ML16355A337), with a supplement dated February 23, 2017 (ADAMS Accession No. ML17055C360), Virginia Electric and Power Company (the licensee) proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, IWA-4000. The licensee proposed to apply a carbon fiber reinforced polymer system for the internal repair of buried circulating water (CW) and service water (SW) piping at Surry Power Station Units 1 and 2.
To complete its review, the Nuclear Regulatory Commission (NRC) staff requests the following additional information. The Enclosures referred to in the request for additional information (RAI) are from the licensees proposed alternative.
3.1 Affected Components RAI 3.1-1 Section 4 of Enclosure 1 specifies that Carbon Fiber Reinforced Polymer (CFRP) will be applied to 24, 30, 36, 43 and 48-inch SW pipes and 96-inch CW pipes.
((
)) (a) Will small bore piping be repaired as part of this project or does the inclusion of the branch line only refer to repair of the Tee of which the branch line is a part? (b) If long sections of small bore piping are to be repaired, it is not apparent that the process for making this type of repair has been described sufficiently in the request. Please describe this process, and (c) Identify all branch lines and associated diameter that will be covered under the proposed alternative.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION 3.2 Applicable Code RAI 3.2-1 (a) As stated in Section 5 of Enclosure 1, the proposed alternative has not yet determined the edition for the ASME Code,Section XI, for the Surry Unit 1 sixth 10-year inservice inspection (ISI) interval. Section 10 of Enclosure 1 states that the CFRP repair system alternative will be implemented during the fifth 10-year ISI internal that began December 14, 2013, and ends on October 13, 2023, except for a common Unit 1 and Unit 2 SW line will be completed during the Unit 1 sixth 10-year ISI interval. The NRC notes that the request is for multiple 10 year ISI intervals. The NRC staff also notes that the inspection of the repaired pipe is not a part of this request. Please confirm that this authorization request is to permit the repaired piping remain in service for the life of the repair and that any repair/replacement and/or inspections of the repaired piping will be conducted in accordance with the applicable edition of ASME Code Section XI, or alternative thereto, at the time of the repair/replacement or inspection.
3.5.1 General Requirements RAI 3.5.1-1 ((
))
RAI 3.5.1-2 Discuss whether any locations in the proposed repair where the expected mode of degradation is other than loss of material, e.g., cracking or cavitation. If so, please explain how/why the proposed repair will be effective in mitigating the potential forms of degradation.
RAI 3.5.1-3 Discuss whether this repair will include pumps, valves, expansion joints, flange joints, small bore piping, and threaded connections If so, please clarify how the repair will be made and the basis for determining whether it will be effective.
Please provide additional details concerning such repairs and success criteria.
RAI 3.5.1-4 ((
))
RAI 3.5.1-5 ((
))
3.5.2 Material Specification RAI 3.5.2-1 Various sections of the proposed alternative provide temperature and pressures of interest to the design and application of the CFRP repair. Please identify OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION where in the submittal that the NRC may find the design temperature and pressure, maximum and minimum operating pressures (as defined by the ASME Code,Section XI) for the subject piping. Please provide (a) Design pressure and temperature of the CW piping and SW piping, (b) Maximum and minimum operating pressure and temperature of the CW piping and SW piping, (c) Maximum pressure and temperature that were used to qualify and analyze the CFRP system, excluding host pipe. (d) Clarify if ((
)) discussed in the proposed alternative are the same as the operating pressure in the ASME Code, Sections III and XI.
RAI 3.5.2-2 ((
))
3.5.3 Testing Quality Check for Fiber Fabrics RAI 3.5.3-1 ((
))
Adhesion Test RAI 3.5.3-2 ((
))
RAI 3.5.3-3 ((
))
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION Density Test RAI 3.5.3-4 ((
))
Tensile Testing RAI 3.5.3-5 ((
))
RAI 3.5.3-6 ((
))
RAI 3.5.3-7 ((
))
Durability testing RAI 3.5.3-8 ((
))
RAI 3.5.3-9 ((
))
Curing Testing RAI 3.5.3-10 ((
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
]
RAI 3.5.3-11 ((
))
Heat Transfer Test RAI 3.5.3-12 ((
))
Weight Test RAI 3.5.3-13 ((
))
Pressure Testing RAI 3.5.3-14 Please discuss (a) Whether a pressure test will be performed on the CFRP-repaired piping prior to the plant startup. If yes, discuss the test pressure that will be used and hold time. (b) Whether VT-2 inspection will be performed as part of pressure testing and (c) Whether the pressure test will be performed in accordance with the ASME Code, Section IWA-5000 and IWD-5000, and, if a pressure test will not be performed, provide justification.
3.5.4 Design EMCB-RAI-1 Section 11 of Enclosure 1 mentions repair using CFRP for non-safety-related piping of diameter as low as 30 inches. ((
)) Provide a discussion describing the accessibility for repair of the ((
)) and if the repair can be performed satisfactorily to maintain adequate structural integrity.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION EMCB-RAI-2 Enclosure 2 states that CFRP repairs include 90 degree vertical elbows, 45 degree vertical bends, tie-ins and other discontinuities in addition to straight pipe segments. ((
))
EMCB RAI-3 ((
))
EMCB-RAI-4 ((
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
))
EMCB-RAI-5 ((
))
EMCB-RAI-6 ((
))
EMCB-RAI-7 ((
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
))
EMCB-RAI-8 ((
))
EMCB-RAI-9 ((
))
EMCB-RAI-10 ((
))
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION EMCB-RAI-11 ((
))
RAI 3.5.4-2 ((
))
RAI 3.5.4-3 ((
))
RAI 3.5.4-4 ((
))
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION 3.5.5 Failure Modes and Effects Analysis RAI 3.5.5-1 ((
))
RAI 3.5.5-2 ((
))
RAI 3.5.5-3 ((
))
RAI 3.5.5-4 ((
))
RAI 3.5.5-5 ((
))
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION 3.5.6 Pre-Installation Evaluation RAI 3.5.6-1 ((
))
RAI 3.5.6-2 ((
))
RAI 3.5.6-3 ((
))
RAI 3.5.6-4 ((
))
RAI 3.5.6-5 ((
))
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION RAI 3.5.6-6 ((
))
3.5.7 Installation RAI 3.5.7-1 ((
))
RAI 3.5.7-2 ((
))
RAI 3.5.7-3 ((
))
RAI 3.5.7-4 ((
))
RAI 3.5.7-5 ((
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
))
RAI 3.5.7-6 ((
))
RAI 3.5.7-7 ((
))
RAI 3.5.7-8 ((
))
RAI 3.5.7-9 ((
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
]
RAI 3.5.7-10 ((
))
RAI 3.5.7-11 ((
))
3.5.8 Examinations Acceptance Examination RAI 3.5.8-1 ((
))
RAI 3.5.8-2 ((
))
RAI 3.5.8-3 ((
))
Inservice Examination RAI 3.5.8-4 ((
)) (a) Please discuss how the inservice inspections of the CFRP-repaired CW and SW piping satisfy the requirements of Section XI of the ASME Code for buried pipe. (b) Will periodic inspections of the inside diameter surface of the repaired CW and SW piping be conducted, if so, at what interval and by what method? (c) Confirm that after the SW piping is repaired with the CFRP system, the SW pipe will still be inspected in accordance with NRC Generic Letter 89-13.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION RAI 3.5.8-5 ((
)) (a) Discuss the acceptance criteria for visual inspections. (b) If the CFRP layers are found to be damaged or degraded, discuss the corrective actions.
Miscellaneous RAIs RAI M-1 Please (a) Submit detailed and legible drawings and sketches, including dimensions, of the pipe terminal ends. The drawings should include where the expansion rings are installed, the end of the CFRP layers, and the area of the pipe that does not have the CFRP layers. (b) Submit drawings or sketches showing a typical cross section of the repaired pipe, including the concrete encasement, and soil above and below the buried piping. Provide dimensions if available. (c) ((
. ))