MONTHYEARML20217N3121999-10-26026 October 1999 Informs That Tf Dragoun Will Be NRC Inspector Assigned to Univ of Illinois at Urbana-Champaign Effective 991026 ML20216F9651999-09-20020 September 1999 Forwards Amend 11 to License R-115 & Safety Evaluation.Amend Approves Safstor Decommissioning Plan for Univ of Illinois Advanced Triga Research Reactor & Authorizes That Plan Be Included as Supplement to Safety Analysis Report ML20212F0291999-09-16016 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Amend to License R-115.Proposed Amend Would Approve Safstor Decommissioning Plan for Univ of Illinois Advanced Triga Research Reactor ML20210N9961999-08-0303 August 1999 Submits Statement of Intent to NRC That at Such Time That Physical Decommissioning of Univ of Il Nuclear Reactor Lab Is Required,Necessary Funds Will Be Appropriated ML20210E9801999-07-22022 July 1999 Forwards Draft Environ Assessment for Univ of Illinois Safstor Decommissioning Plan ML20195D3211999-06-0707 June 1999 Forwards,For Info,Notice & Solicitation of Comments Pursuant to 10CFR20.1405 & 10CFR50.82(b)(15) Re Proposed Action to Decommission Univ of Il at Urbana-Champaign Univ of Il Advanced Triga Research Reactor ML20206S0011999-05-11011 May 1999 Forwards Response to RAI Re Univ of Il Research Reactor. Revised TS with Rev Marks,Encl ML20206A5381999-04-20020 April 1999 Forwards Request for Addl Info Re Review of Licensee Amend Request for License R-115 Submitted on 981113 ML20205N4341999-04-12012 April 1999 Forwards Amend 10 to License R-115 & Se.Amend Removes Authority from License to Operate Reactor,Authorizes possession-only of Reactor & Makes Other Changes to TSs Commensurate with possession-only Status ML20205J0351999-03-26026 March 1999 Informs That Licensee Was in Violation of Surveillance TS 4.2(a) Requiring Control Rod Reactivity Worth Semiannually Not to Exceed Eight Months.Ts Revs in Support of Safstor Eliminate Subject Surveillances ML20203C1091999-02-0303 February 1999 Forwards Response to RAI Re Univ of Il Advanced Triga Reactor Facility ML20202C8691999-01-27027 January 1999 Forwards Request for Addl Info Re Amend Request for FOL R-115 for Univ of Illinois at Urbana-Champaign Advanced Triga Reactor That Was Submitted on 981005 ML20199L1221999-01-21021 January 1999 Informs That Jf Stubbins Will Replace B Jones as Department Head for Univ of Il Nuclear Engineering Dept,Effective 990122 ML20199D4471999-01-12012 January 1999 Forwards Response to NRC 981209 RAI & Revised Pages to TS as Appropriate ML20196K1141998-12-0909 December 1998 Forwards RAI Re Univ of Illinois at Urbana-Champaign Advance Triga Reactor,Submitted on 981005.Response Requested within 60 Days of Date of Ltr ML20195D6001998-11-13013 November 1998 Forwards Safstor Decommissioning Plan for Univ of Il Nuclear Reactor Lab. Proprietary Matl Encl.Proprietary Encl Withheld ML20196G7501998-11-13013 November 1998 Informs That Gts Duratek Info Submitted in Licensee 981113 Safstor Plan,Is Not to Be Considered Proprietary Per 10CFR2.790.Licensee Grants NRC Permission to Duplicate & Disseminate as Necessary Gts Duratek Info ML20154G0421998-10-0505 October 1998 Forwards Listed Documents in Support of Safstor Option for Decontamination & Decommissioning of Univ of Il Nuclear Reactor Lab.Documents Revise Facility License & TS in Support of Facility Status ML20151X2291998-09-11011 September 1998 Informs That Based on Review of Univ of Il Nuclear Reactor Lab (Uinrl) Operator Requalification Program Submitted on 980831,NRC Concludes That Uinrl Operator Requalification Program Meets Requirements of 10CFR55 & Acceptable ML20239A1821998-08-31031 August 1998 Forwards Rev 0 to Univ of Il Nuclear Reactor Lab Reactor Operator Requalification Program, in Support of Current Shutdown Status & Future Possession Only Amend to Facility License ML20236H0601998-07-0101 July 1998 Informs of Licensee Decision to Permanently Cease Operation of Univ of Il Advanced Triga Reactor Effective 980809. Understands That Licensee Must Submit Decommissioning Plan & Request for Termination of License within 2 Yrs ML20247D8081998-04-30030 April 1998 Ack Receipt of Ltr Dtd 980305,transmitting Changes to Physical Security Plan for Univ of Il Nuclear Reactor Lab Submitted Under Provisions of 10CFR50.54(p) ML20216J7901998-04-16016 April 1998 Forwards SRO License Certificates to M Dillavou & a Smit at Univ of Illinois Advanced Triga Reactor.W/O Encl ML20247R9551998-04-0101 April 1998 Forwards Preliminary Drawing for Univ of Il at Urbana-Champaign Advanced Triga Control Console Conversion Project ML20217F3271998-03-24024 March 1998 Forwards Results of Operator Inital Exam Conducted on 980302-03.W/o Encl ML20216F5281998-03-0505 March 1998 Forwards Administrative Changes to Physical Security Plan for Univ of Illinois Nuclear Reactor Lab.Changes Do Not Decrease Effectiveness of Plan.W/O Encls ML20198R5271998-01-20020 January 1998 Discusses Arrangements for Administration of Operator Licensing Exams at Univ of Illinois Reactor Scheduled for Week of 980302.In Order to Meet Schedule,Furnish Matl Listed in Encl 1 at Least 30 Days Prior to Exam Date ML20198T2791998-01-16016 January 1998 Ack Receipt of Which Transmitted Changes to Univ of Illinois Nuclear Reactor Lab Emergency Plan, Submitted Under 10CFR5.54(q) ML20199J6901998-01-12012 January 1998 Informs NRC in Writing of Discovery of Procedural & TS Violation on 971117 & 21 Re Fuel Temperature & Power Indications.Corrective Actions:Procedure Will Be Out & Observed for All Operations Regardless of Simplicity ML20198G0881997-12-24024 December 1997 Discusses Arrangements Made for Administration of Operator Licensing Exams at Univ of Illinois Reactor.Written & Operating Exams Scheduled for Wk of 980302.Ref Matl for Reactor/Senior Reactor Operator Licensing Exams Encl ML20198C1531997-12-23023 December 1997 Requests That Concerning Univ of Illinois,Urbana- Champaign Nuclear Reactor Laboratory Emergency Plan,Be Disregarded.Ltr Was Sent in Error ML20217P3201997-08-22022 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Nrr.All Related Repts, Correspondence & Inquires W/Docket Number Specified Should Be Directed to Listed Address ML20210K0961997-08-15015 August 1997 Forwards Emergency Plan for Nuclear Reactor Lab at Univ of Il in Urbana,Il. Ltr Attached to Rev Bar Copy,Outlines Changes Made to Plan ML20149J2411997-07-24024 July 1997 Provides Reminder That License R-115 for Univ of Illinois at Urbana-Champaign Advanced Triga Reactor Will Expire on 980809 & Guidance for Preparing Application for Renewal ML20149J2821997-07-24024 July 1997 Forwards Insp Rept 50-151/97-201 on 970623-26 & Notice of Violation ML20148T5051997-06-30030 June 1997 Forwards Draft & Final Versions of Emergency Plan for Nuclear Reactor Laboratory at Univ of Il in Urbana,Il. Changes Made Do Not Decrease Effectiveness of Plan ML20140C4651997-06-0202 June 1997 Informs NRC That J Ralston Is No Longer Employed as Facility Operations Supervisor IAW TS Section 6.8(b)(3) ML20137R7971997-04-0909 April 1997 Forwards Senior Reactor Operator License Certificate to Rl Holm.W/O Encl ML20137R7871997-04-0909 April 1997 Forwards SRO License Certificates for Jr Faircloth & Kj Mushinski.W/O Encl ML20134Q1041997-02-14014 February 1997 Forwards Rept Re Problem W/One Kilowatt Interlock and Corrective Action Taken ML20059K2221993-10-26026 October 1993 Informs That Encl Map Entitled, TLD Locations Outside RB May Not Have Been Included in Re Request for Authorization to Operate at 0.5 Rem Limit Per 10CFR20.1301(c).Map Provided to Help Clarify Text ML20057D4501993-09-28028 September 1993 Informs That on 930920,set of Liquid Std Samples Shipped to B Hart of Univ of Western Ontario Instead of Geological Samples.No Formal Procedure Exists for Shipping of Radioactive Matl.Draft Procedure Encl ML20056E3581993-08-16016 August 1993 Forwards Operator/Senior Operator License Certificates for L Golchert & Jh Romans,Per Commission Request.W/O Encls ML20056E0711993-08-0303 August 1993 Forwards Results for Operator Initial Exam Conducted on 930728.W/o Encl ML20056C4521993-06-0909 June 1993 Forwards Initial Exam Repts 50-151/OL-93-01 & 50-356/OL-93-01 During Wk of 930517.W/o Encl ML20128P8531993-02-16016 February 1993 Forwards Amend 6 to License R-115 & Safety Evaluation.Amend Approves Installation of Microprocessor Based Instrumentation & Control Sys on Licensee Triga Reactor.Tss Amended to Reflect New Sys ML20127J5471993-01-19019 January 1993 Forwards Answers to Request for Addl Info Re Authorization to Possess & Use U-235 ML20127D7051993-01-11011 January 1993 Forwards Revised Page 15 to Ts,Per 930111 Telcon ML20127B2471993-01-0505 January 1993 Forwards Response to NRC 921229 Request for Addl Info Re Listing of Scrams Provided by New Ga Co Control Console That Are Not Part of TS & How New Control Console Provides Interlocks Required by TS ML20126L2061993-01-0404 January 1993 Forwards RAI in Relation to Completion of Review of 920527 Application for Amend to License R-115 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20210N9961999-08-0303 August 1999 Submits Statement of Intent to NRC That at Such Time That Physical Decommissioning of Univ of Il Nuclear Reactor Lab Is Required,Necessary Funds Will Be Appropriated ML20206S0011999-05-11011 May 1999 Forwards Response to RAI Re Univ of Il Research Reactor. Revised TS with Rev Marks,Encl ML20205J0351999-03-26026 March 1999 Informs That Licensee Was in Violation of Surveillance TS 4.2(a) Requiring Control Rod Reactivity Worth Semiannually Not to Exceed Eight Months.Ts Revs in Support of Safstor Eliminate Subject Surveillances ML20203C1091999-02-0303 February 1999 Forwards Response to RAI Re Univ of Il Advanced Triga Reactor Facility ML20199L1221999-01-21021 January 1999 Informs That Jf Stubbins Will Replace B Jones as Department Head for Univ of Il Nuclear Engineering Dept,Effective 990122 ML20199D4471999-01-12012 January 1999 Forwards Response to NRC 981209 RAI & Revised Pages to TS as Appropriate ML20195D6001998-11-13013 November 1998 Forwards Safstor Decommissioning Plan for Univ of Il Nuclear Reactor Lab. Proprietary Matl Encl.Proprietary Encl Withheld ML20196G7501998-11-13013 November 1998 Informs That Gts Duratek Info Submitted in Licensee 981113 Safstor Plan,Is Not to Be Considered Proprietary Per 10CFR2.790.Licensee Grants NRC Permission to Duplicate & Disseminate as Necessary Gts Duratek Info ML20154G0421998-10-0505 October 1998 Forwards Listed Documents in Support of Safstor Option for Decontamination & Decommissioning of Univ of Il Nuclear Reactor Lab.Documents Revise Facility License & TS in Support of Facility Status ML20239A1821998-08-31031 August 1998 Forwards Rev 0 to Univ of Il Nuclear Reactor Lab Reactor Operator Requalification Program, in Support of Current Shutdown Status & Future Possession Only Amend to Facility License ML20236H0601998-07-0101 July 1998 Informs of Licensee Decision to Permanently Cease Operation of Univ of Il Advanced Triga Reactor Effective 980809. Understands That Licensee Must Submit Decommissioning Plan & Request for Termination of License within 2 Yrs ML20247R9551998-04-0101 April 1998 Forwards Preliminary Drawing for Univ of Il at Urbana-Champaign Advanced Triga Control Console Conversion Project ML20216F5281998-03-0505 March 1998 Forwards Administrative Changes to Physical Security Plan for Univ of Illinois Nuclear Reactor Lab.Changes Do Not Decrease Effectiveness of Plan.W/O Encls ML20199J6901998-01-12012 January 1998 Informs NRC in Writing of Discovery of Procedural & TS Violation on 971117 & 21 Re Fuel Temperature & Power Indications.Corrective Actions:Procedure Will Be Out & Observed for All Operations Regardless of Simplicity ML20198C1531997-12-23023 December 1997 Requests That Concerning Univ of Illinois,Urbana- Champaign Nuclear Reactor Laboratory Emergency Plan,Be Disregarded.Ltr Was Sent in Error ML20210K0961997-08-15015 August 1997 Forwards Emergency Plan for Nuclear Reactor Lab at Univ of Il in Urbana,Il. Ltr Attached to Rev Bar Copy,Outlines Changes Made to Plan ML20148T5051997-06-30030 June 1997 Forwards Draft & Final Versions of Emergency Plan for Nuclear Reactor Laboratory at Univ of Il in Urbana,Il. Changes Made Do Not Decrease Effectiveness of Plan ML20140C4651997-06-0202 June 1997 Informs NRC That J Ralston Is No Longer Employed as Facility Operations Supervisor IAW TS Section 6.8(b)(3) ML20134Q1041997-02-14014 February 1997 Forwards Rept Re Problem W/One Kilowatt Interlock and Corrective Action Taken ML20059K2221993-10-26026 October 1993 Informs That Encl Map Entitled, TLD Locations Outside RB May Not Have Been Included in Re Request for Authorization to Operate at 0.5 Rem Limit Per 10CFR20.1301(c).Map Provided to Help Clarify Text ML20057D4501993-09-28028 September 1993 Informs That on 930920,set of Liquid Std Samples Shipped to B Hart of Univ of Western Ontario Instead of Geological Samples.No Formal Procedure Exists for Shipping of Radioactive Matl.Draft Procedure Encl ML20127J5471993-01-19019 January 1993 Forwards Answers to Request for Addl Info Re Authorization to Possess & Use U-235 ML20127D7051993-01-11011 January 1993 Forwards Revised Page 15 to Ts,Per 930111 Telcon ML20127B2471993-01-0505 January 1993 Forwards Response to NRC 921229 Request for Addl Info Re Listing of Scrams Provided by New Ga Co Control Console That Are Not Part of TS & How New Control Console Provides Interlocks Required by TS ML20125B1591992-12-0101 December 1992 Forwards Nonproprietary & Proprietary Versions of Document Provided by General Atomics on Univ of Il Specific I&C Sys Software Mods.Proprietary Version Withheld (Ref 10CFR2.790) ML20058L0721990-07-26026 July 1990 Forwards Revised Operator Requalification Program for Illinois Advanced Triga & Lopra Reactors ML20055J3911990-07-26026 July 1990 Forwards Revised, Univ of Illinois Nuclear Reactor Lab Operator Requalification Program, Adding List of Items in 10CFR55.41 & 10CFR55.43 ML20055G3091990-07-0606 July 1990 Submits Decommissioning Funding Plan for Reactor,Per 10CFR50.33 & 50.75.Estimated Cost of Decommissioning Reactor Stated ML20215E8071986-12-15015 December 1986 Forwards Emergency Plan for Advanced Triga Reactor, Reflecting Staffing Changes & Changing Status of Nuclear Engineering from Program to Dept ML20215E7991986-12-15015 December 1986 Forwards Emergency Plan for Advanced Triga Reactor, Reflecting Staffing Changes & Changing Status of Nuclear Engineering from Program to Dept ML20214V3851986-11-24024 November 1986 Forwards Response to Violations Noted During Insp of License R-115.Nuclear Reactor Committee Misunderstanding of NRC Regulations Resolved & Reactor Control Rod Position Interlock Restored to Full Compliance on 860910 ML20126H4121985-05-0606 May 1985 Responds to Telcon Re Violation Noted in Safety Insp on 850226-28.Corrective Actions:Comm Ed Contacted for Immediate Delivery of Continuous Air Monitors.Portable Air Particulate Monitor Used in Interim ML20248E2881975-01-10010 January 1975 Provides Operator Requalification Program to Comply W/Amend to 10CFR50 1999-08-03
[Table view] |
Text
- .=. ._. -- .
Radiation Science Laboratory UnivCrsity of Illinois at Urt>ana-Champaign Departrnent of Nuclear Engineering / College of Engineering K j.. s..
[h-- 214 Nuclear Engineering Laboratory 217-333-77550866
[b$ef 103 South Goodwin Avenue 217-333-2906 fax .
- W//s'- ' Urbana,IL 61801 2984 ,
~ E~
Aeninistator HeaNh Phvsicist
),
Rchard L. Holrn r-holmquiuc.edu Mark Kaczor m-kactorQuluc.edu g
February 3,1999 Docket No. 50-151 Document Control Desk U.S. Nuclear Regulatory Commission l Washington,DC 20555 i l
l
Dear Sir,
i Please find enclosed response to the Request for Additional Information (TAC NO. MA4177) dated January 27,1999. j i
If there are any questions please do not hesitate to contact me. l Sincerely, ;
~
Richard L. Holm Reactor Administrator C: A. Adams Regional Administrator, USNRC, Region III file l !
[AG2O f 9902110203 990203 I PDR ADOCK 05000151 4 P .. PDR _j i
l
_. ~ . _. __ , -- _.
\
a STATE OF ILLINOIS' COUNTY OF CHAMPAIGN Richard L. Holm, being first duly sworn on oath, deposes and'says that he has affixed his ;
signature to the letter above in his official capacity as Reactor Administrator, University of - ;
Illinois Nuclear Reactor Laboratory \; that in accordance with the provisions of Part 50, Chapter !
1, Title 10 of the Code of Federal Regulations, he is attaching this affidavit \; that the facts set j forth in the within letter are true to his best information and belief. i I
/
Richard L. Holin !
Reactor Administrator I I
i Sub' scribed and sworn to before me, a Notary Public, in and for the County of Champaign, State ofIllinois, this ddday of 64o m .A.D.,1999.
O b, n s Atl- S'16 r)Cni)
No(ary Public ofIlliny(s My Commission Expires i
OFFICIAL SEAL KATHLEEN M. DYSART i
' NOTARY PUBUC,8 TATE OFILUNOIS l
WY C0thilS810N EXPIRES 8-10-2000 :
l i
l l
l
?
Response to Request for Additional Information (TAC NO.
MA4177); Dated January 27,1999 University of Illinois Advanced TRIGA Reactor l l Facility License No. R-115 Docket No. 50-151 ;
f i
m
- 1. TS 4.7 d. . Your proposed TS refers to fuel element storage in the suberitical assembly, wet
, storage racks and Bulk Shielding Facility. To match the wording used in TS 3.9, would it-be simpler to say fuel element storage in the Bulk Shielding Facility and TRIGA pool?
Please explain the purpose of moving fuel elements to "other storage."
Appropriate changes were made to 4.7d, please see attached sheets. Thepurpose of moving elements to "other storage" would be to isolate a leaking element or minimize corrosion of thefuel cladding in the event that the conductivity of the pool should be excessive.
- 2. TS 4.7 f. This TS refers to checking pool level in the Bulk Shielding Facility. Should this TS also refer to the TRIGA pool when is is used for fuel storage?
Appropriate changes were made to 4.7f, please see attached sheets.
- 3. TS 6.2.1 c. This TS refers to reactor operating staff. Please propose wording that reflects the permanent shutdown status of tim facility.
Appropriate changes were made to 6.2.1 c, please see attached sheets.
l 1
l l
i I
3
.a r
-26a .
t
- l 4.7 Subcritical Experia=4 and Fuel Storaec Using the Bulk Shieldinn Facility ;
.Anolicability -
' his specification applies to the surveillance requirements associated with the subcritical assembly and storage i offuel elements in the bulk shielding facility. ]
Obiective j q
To ensure safe operata of the subcritical assemblyr, to ensure that the radiation monitoring equipment is ;
operating properly, and that the pool level is maintainedfor radiation protection. l 1
Spopification a) De reactivity worth of the control rod shall be determined annually (interval not to exceed fifteen months).
He surveillance may be deferred indefinitely when the subcritical assembly is not being utilized, but shall be the first operation performed when the subcritical assembly is to be operated, b) Control rod drop time shall be determmed annually (interval not to exceed fifteen months). %e drop time from the fully withdrawn to 90 percent of full reactivity inserta shall be less than one second. He surveillance may be deferred indefinitely when the suberitical ast,ambly is not being utilized, but shall be performed prior to operation of the assembly.
c) De radiation monitor utilized for a high radiation signal scram shall be calibrated and verified operable annually (interval not to exceed fifteen months). We surveillance may be deferred indefinitely when the i suberitical assembly is not being utilized, but shall be performed prior to operation of the assembly. !
I i
d) Approximately 210 % ofthe fuel elements in the = bed!=1 =x;ityBulk Shielding Facility or TRIGA
= pool, shall be visually inspected annually for sny indication of deterioration or distortion (interval not to ~
exceed fifteen months) such that all of the elements ir. $c =bedi=! =n.;bly are inspected over a Aveten year period (interval not to exceed Aveten and one half years). If any indication of deterioration or distortion i
' is noted the element shall be removed frenumee to other storage and all elements in the Bulk Shielding Facility shall be inspected.within one week Other storage shall be any other approvedfuel storage area at !
the Nuclear Reactor Laboratory.:
e) De manual and high radiation scrams shall be verified operable daily prior to operation of the suberitical assembly. His specification is only applicable on days when the subcritical assembly is to be operated.
f) The Bulk Shielding Facilitypoollevel and TRIGA poollevel shall be checked on a weekly (not to exceed ten days) basis when usedforfuel storage.
Basis ne reactivity worth is measured to assure that control of the subcritical assembly can be maintained. He control rod drop time verifies the scram capability of the control rod. Calibration and verification of the operability of the radiation monitor verifies the scram capability of the monitor. He visual inspection of the fuel elements specified had bem shown to be adequate based on prior experience with a lack of fuel deterioration over time.
a ;,;
" -26a-f0.7 Shritical Experi==* and Fuel Storane Usina the Bulk hm- Facility
.Anolicability q I
s
! . His specification applies to the surveillance requirements associated with the suberitical assembly and storage l
, . of fuel elements in the bulk shielding facility. )
i L Obiective j l
To ensure safe operation of the suberitical assembly, to ensure that the radiation monitoring equipment is
, operating properly, and that the pool level is maintained for radiation protectim. .
l Specification a) De reactivity worth of the control rod shall be determmed annually (interval not to exceed fifteen months).
He surveillance may be deferred indefinitely when the subcritical assembly is not being utilized, but shall be the first operatim performed when the suberitical assembly is to be operated. ,
I b) Control rod drop time shall be determined annually (interval not to exceed fifteen months). He drop time - )
i from the fully withdrawn to 90 percent of full reactivity insertson shall be less than one second. %e surveillance may be deferred mdefinitely when the subcritical assembly is not being utilized, but shall be l performed prior to operation of the assembly. !
- c) He radiation monitor utilized for a high radiation signal scram shall be calibrated and verified operable l g annually (interval not to exceed fifteen months). He surveillance may be deferred indefinitely when the j l suberitical assembly is not being utilized, but shall be performed prior to operation of the assembly.
i d) Approxunately 10 % of the fuel elements in the Bulk Shielding Facility or TRIGA pool, shall be visually l inspected annually for any indication of deterioration or distortion (interval not to exceed fifteen months) {
such that all of the elements are inspected over a ten year period (interval not to exceed ten and one half ')
- years). If any indication of deterioration or distortion is noted the element shall be removed to other storage and all elements in the Bulk Shielding Facility shall be inspected within one week. Other storage shall be any other approved fuel storage area at the Nuclear Reactor Laboratory.
e) ne manual and high radiation scrams shall be verified operable daily prior to operation of the suberitical assembly. His specification is only applicable on days when the suberitical assembly is to be operated.
~ f) He Bulk Shielding Facility pool level and TRIGA pool level shall be checked on a weekly (not to exceed ten days) basis when used for fuel storage.
Basis
! he reactivity worth is measured to assure that control ofthe subcritical assembly can be maintained. De control rod drop time verifies the scram capability of the control rod. Calibration and verification of the
(! operability of the radiation monitor verifies the scram capability of the monitor. He visual inspection of the fuel elements specified had been shown to be adequate based on prior experience with a lack of fuel deterioration over time, c
i a
l
, l i
t 6.2 Review and Audit .
- 6.2.1 Charter and Rules ,
a, ne Reactor Committee shall be wiyosed of at least five voting members, one of whom shall be a Heakh .
Physicist designated by the campus Radiation Safety Officer for the University, and one whom shall be the ,
Reactor Admmistrator, and one whom shall be the Reactor Health Physicist. %reeThe remaining !
members shall be appomted by the Head of the Department of Nuclear Engineering, ehesen hem the f:n&y of th:k:: 'h;i.uch; ;o as to maintain a balanced knowledge of reactor safety and regulation. ;
""r " sect ".:21 Syib: i:1! b: : := eming .._..Sc. ;
- b. He Reador Committee shall have a wntten statement defining such matters as the authority ofthe l comnuttee, the subjects within its purview, and other such admmistrative provisions as are required for the .
I effective functioning of the Reador CammW= Minutes of all meetings of the Reactor Cammhaa shall be kept.
j c.' A quorum of the Reador Ownminee shall be a majority of not less than one half of the members and the .j '
L .l reactor operateg-staff shall not consttute a voting majority.
- d. The Reactor Cammi*aa shall meet at least quavterlysemiannually not to crceednine months -with-the j l '
i' inte=15;:c.;;.. ==thg:::: to exc=d 5 ==th::.'
i 6.2.2 Review Function ;
- The review function of the Comnuttee shall include, but is not linuted to the followmg a.' Determination that proposed changes in equipment, systems, tests, experiments, or procedures do not involve l an unreviewed safety question. .;
l \
I
- b. All new procedures and major revisions thereto having safety significance, proposed changes in reactor facility equipment, or systems having safety significance. ;
- c. All new experiments or classes of experiments for determination that an unreviewed safety question does not ;
exist.
- d. Proposed changes in the technical specifications or license.
- e. Violations of technical specifications or license.
- f. Operating abnormalities having safety significance.
('
. g. Reportable occurrences as listed in 6.8.
h.' Audit reports.
l
! A wntten report or minutes of the fmdings and recommendations of the Committee shall be submitted to the Head,
- Department of Nuclear Engineering; and the Reactor Committee numbers in a timely manner after each meeting.
1 s
a f
r ., . , .-. - - ,,
i
, 6.2.} Charter a_n4 Rules
- a. He Reactor Committee shall be composed of at least five voting members, one of whom shall be a Heahh Physicist designated by the campus Radiation Safety Officer for the University, one whom shall be the Reactor Administrator, and one whom shall be the Reactor Heahh Physicist. %e remaining members shall be appointed by the Head of the Department of Nuclear Engineering, so as to maintain a balanced knowledge of reactor safety and regulation,
- b. He Reactor Commi*aa shall have a wntien statement defining such matters as the authority of the committee, the subjects within its purview, and other such administrative provisions as are required for the effective functioning of the Reactor Committee Minutes of all meetings of the Reactor Committee shall be kept.
- c. A quomm of the Reactor Comnuttee shall be a majority of not less than one half of the members and the reactor staff shall not constitute a voting majority.
- d. He Reactor Comnuttee shall meet at least semiannually not to exceed nine months 6.2.2 Review Function ne review function of the Committee shall include, but is not limited to the following:
- a. Determination that proposed changes in equipment, systems, tests, experiments, or procedures do not involve an unreviewed safety question.
- b. All new procedures and major revisions thereto having safety significance, proposed changes in reactor facility equipment, or systems having safety significance.
- c. All new experiments or classes of experiments for determination that an unreviewed safety question does not exist.
- d. Proposed changes in the technical specifications or license,
- e. Violations of technical specifications or license.
- f. Operating abnormalities having safety significance.
- g. Reportable occurrences as listed in 6.8.
- h. Audit reports.
A written report or minutes of the fmdings and recommendations of the Committee shall be submitted to the Head, Department of Nuclear Engineering, and the Reactor Comnuttee members in a timely manner after each meeting.
l l
l l