Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
_ _ _ _ _ _ _ _ __ . _ _ . - _
INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE Safety Valves . . .. . . . . . . . . . . . . . . 3/4 7-1 Auxiliary Feedwater System . . . . . . . . . . . . 3/4 7-4 Condensate Storage Tank . . . . . . . . . . . . . . 3/4 7-6 Activity .... . .. .. . . . . . . . . . . 3/4 7 7 Main Steam Line Isolation Valves . . . . . . . . . 3/4 7-9 Secondary Water Chemistry . . . . . . . . . . . . . 3/4 7-10 Motor Driven Feedwater Pump System. . . . . . . . 3/4 7-12a 3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION . . 3/4 7-13 3/4.7.3 COMPONENT COOLING WATER SYSTEM . . . . . . . . . . 3/4 7-14 3/4.7.4 SERVICE WATER SYSTEM ....... . . . . . . . . 3/4 7-15 3/4.7.5 ULTIMATE HEAT SINK ... . . . . . . . . . . . . . 3/4 7-16 3/4.7.6 CONTROL ROOM EMERGENCY VENTILATION SYSTEM . . . . . 3/4 7-17 3/4.7.7 HYDRAULIC SFU2BERS . .... . . . . . . . . . . . 3/4 7-20 3/4.7.8 SEALED SOURCE CONTAMINATION . . . . . . . . . . . . 3/4 7-36 3/4.7.9 FIRE SUPPRESSION SYSTEMS Fire Suppression Water System . . . . . . . . . . . 3/4 7-38 Spray and/or Sprinkler System . . . . . . . . . . . 3/4 7-42 Fire Hose Stations ... . . . . . . . . . . . . . 3/4 7-44 3/4.7.10 FIRE BARRIERS . .... . . . . . . . . . . . . . . 3/4 7-47 1 l
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES Operating . ... . ... . . . . . . . . . . . . . 3/4 8-1 Shutdown ... . . ... . . . . . . . . . . . . . 3/4 8-5 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. Distribution - Operating . . . . . . . . . . . 3/4 8-6 A.C. Distribution - Shutdown . . . . . . . . . . . 3/4 8-7 D.C. Distribution - Operating . . . . . . . . . . . 3/4 8-8 D.C. Distribution - Shutdown . . . . . . . . . . . 3/4 8-10 8712100318 871207 PDR ADOCK 05000346 VII AmendmentNo.//, 103 i P PDR l
l ----- -
l ADDilt0NAl CHMGS PREVIOUSLY
! PROPO$!D fn LtHlR N
$ctial No._ }_'{0] D3te //.p-F7 INDEX BASES SECTION PAGE 3_/.4 . 7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE . . . . . . . . . . . . . . ..... B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION . . B 3/4 7-3 3/4.7.3 COMPONENT COOLING WATER SYSTEM. . . . . . ..... B 3/4 7-3 4 3/4.7.4 SFRVICE WATER SYSTEM. . . . . . . . . . . ..... B 3/4 7-4 3/4.7.5 ULTIMATE HEAT SINK. . . . . . . . . . . . ..... B 3/4 7-4 3/4.7.6 CONTROL ROOM EMERGENCY VENTILATION SYSTEM . .... B 3/4 7-4 3/4.7.7 HYDRAULIC SNUBBERS. . . . . . . . . . . . ..... B 3/4 7-5 3/4.7.8 SEALED SOURCE CONTAMINATION . . . . . . . ..... B 3/4 7-6 3/4.7.9 FIRE SUPPRESSION SYSTEMS. . . . . . . . . ..... B 3/4 7-6 3/4.7.10 FIRE BARRIERS . . . . . . . . . . . . . . ..... B 3/4 7-6 l 3/4.8 ELECTRICAL POWER SYSTEMS. . . . . . . . . . . ..... B 3/4 8-1 3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION . . . . . . . . . . . ..... B 3/4 9-1 3/4.9.2 INSTRUMENTATION . . . . . . . . . . . . . ..... B 3/4 9-1 3/4.9.3 DECAY TIME. . . . . . . . . . . . . . . . ..... B 3/4 9-1 3/4.9.4 CONTAINMENT PENETRATIONS. . . . . . . . . ..... B 3/4 9-1 3/4.9.5 COMMUNICATIONS. . . . . . . . . . . . . . ..... B 3/4 9-1 DAVIS-BESSE, UNIT 1 XII Amendment No. 38
. ~.
)
L l -PLANT SYSTEMS
! I 3/4.7.10 FIRE BARRIERS LIMITING CONDITION FOR OPERATION 3.7.10 All fire barriers separating portions of redundant safe {
shutdown systems required in the event of a fire shall be OPERABLE.
APPLICABILITY: At all times.
ACTION:
- a. With one or more of the above fire barriers inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, either:
- 1. Establish a continuous fire watch on at least one side of the affected fire barrier, or
.2. Verify the OPERABILITY of the fire detectors on at least one side of the affected fire barrier and establish an hourly fire watch patrol.
- b. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.7.10 Each of the above required fire barriers, including sealing devices, shall be verified OPERABLE by:
- a. Performing a visual inspection of the exposed surfaces of anch fire-rated wall *, floor and ceiling, electrical race-way fire enclosure and structural steel fire-proofing at least once per 18 months.
- b. Performing a visual inspection of each fire door, fire damper and associated hardware at lesst once per 18 months.
- Barrier 102 West /210 East and a portion of barrict s 206 East /210 West and 205 North /206 South behind the filter bank are not subject to the requirements for visual inspection due to ALARA considerations.
DAVIS-EESSE, UNIT 1 3/4 7-47 Amendment No. 9,55,93
SURVEILLANCE REQUIREMENTS
- c. Performing a visual inspection of at least ten percent of each type of sealed penetration at least once per 18 months. If the penetration (s) is determined to be inoperable, declare the affected penetration (s) inoperable and perform a visual inspection of an additional ten percent of the degraded type of sealed penetration. This inspection process shall continue until a ten percent sample with no visually apparent adverse changes in appearance or changes from the as-built condition are found or until all required scaled penetrations of the degraded type have been inspected.
Samples shall be selected such that each penetration seal vill be inspected at least once per 15 years.
- d. Verifying at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each fire door that is unlocked is closed or that is equipped with an automatic hold-open and release mechanism is free from obstructions.
- e. Verifying at least once per 7 days each locked fire door is closed and locked,
- f. Performing a functional test that verifies the operation of autotatic hold-open and release mechanisms upon full openings, and Jatch and closing mechanisms upon full and partial openings, at least once per 18 months. l i
l i
)
l 1
i DAVIS-BESSE, UNIT 1 3/4 7-48 Amendment No. 9,65,93 l
i
l l
l I PLANT' SYSTEMS BASES l
3/4.7.8 SEALED SOURCE CONTAMINATION I
The limitations on removable conte.mination for sources requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(c) limits for plutonium. This limitation will ensure that leakage from by product, .!
source, and special nuclear material souces will not exceed allowable intake values.
4 3/4.7.9 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is arra11able to confine and extinguish fires occuring in.any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or. sprinklers, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimi e potential damage to safety related equipment and is a major element in the facility fire !
protection program.
In the event that portions of the fire suppression systems are inoper-able, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.
In the event the fire suppression water system becomes inoperable, immedi-ate corrective measures must be taken since this system provides the major fire suppression capability of the plant. The requirement for a twenty-four hour report to the Commission provideo for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppres-sion capability for the continued protection of the nuclear plant. i 3/4.7.10 FIRE BARRIERS The OPERABILITY of the fira barrier ensures that fires will be confined i i
or adequately retarded from spreading to adjacent fire areas or to portions of redundant safe shutdown systems required in the event of a fire within the fire area. This design feature minimizes the possibility of a single fire rapidly involving several fire areas of the facility prior to detection and extinguishment. The fire barriers are passive elements in the facility fire protection program.
Fire barriers, including cable penetration barriers, fire doors and j dampers, are considered OPERABLE when the visually observed condition is !
the same as the as-designed condition. The as-designed condition of each i fire barrier is based on a tested configuration or a configuration !
analyzed to withstand the fire hazards associated with the fire area. !
DAVIS-BESSE, UNIT 1 B 3/4 7-6 Amendment No. 9
-- _ _ ~
F-ADDITIONAL CHANGES PREVIOUSLY PROPOSED BY LETTER Scrial flo. l'/ / / Date F-3/-F7 l
ADMINISTRATIVE CONTROLS 1
6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum i qualifications of ANSI N18.1-1971 for comparable positions, except for (1) the Chemistry and Health Physics General Superintendent who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.
6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Nuclear Training Director and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55.
6.4.2 A training program for the Fire Erigade shall be maintained under the direction of the Nuclear Training Director.
6.5 REVIEW AND AUDIT 6.5.1 STATION REVIEW BOARD (SRB)
FUNCTION 6.5.1.1 The Station Review Board (SRB) shall function to advise the Plant Manager on all matters related to nuclear safety.
DAVIS-BESSE, UNIT 1 6-5 Amendment No. 9,37,89,98
ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Director of the Office of 7nspection and Enforcement Regional Office within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification:
- a. ECCS Actuation, Specifications 3.5.2 and 3.5.3.
I
- b. Inoperable Seismic Monitoring Instrumentation, Specification 3.3.3.3.
- c. Inoperable Meteorological Monitoring Instrumentation, Specification 3.3.3.4.
- d. Seismic event analysis, Specification 4.3.3.3.2.
- e. Fire Detection Instrumentation, Specification 3.3.3.8.
- f. Fire Suppression Systems, Specifications 3.7.9.1 and 3.7.9.2.
- g. Dose or dose commitment exceedences to a HEMBER OF THE PUBLIC !
from radioactive materials in liquid effluents released to UNRESTRICTED AREAS (Specification 3.11.1.2).
- h. The discharge of radioactive liquid waste without treatment acd I in excess of the limits in Specification 3.11.1.3.
- 1. The calculated air dose from radioactive gases exceeding the l
limits in Specification 3.11.2.2.
- j. The calculated dose from the release of iodine-131, tritium, and l radionuclides in particulate form w1th half-lives greater than 8 days, in gaseous effluents exceeding the limits in Specification 3.11.2.3.
- k. The discharge of radioactive gaseous vaste without treatment l
and in excess of the limits in Specification 3.11.2.4.
- 1. The calculated doses from the release of radioactive materials l in liquid or gaseous effluents exceeding the limits in Specification 3.11.4.
- m. The level of radioactivity as the result of plant effluents in ;
an environmental sampling medium exceeding the reporting levels I of Table 3.12-2 (Specification 3.12.1).
DAVIS-BESSE, UNIT 1 6- 18 Amendment No. 5,12,55,86 l
t ;