ML113390449

From kanterella
Revision as of 11:12, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Initial Exam 2011-302 Final Sim/IN-Plant JPMs
ML113390449
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/01/2011
From:
NRC/RGN-II
To:
References
Download: ML113390449 (132)


Text

CR0-ill fs Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-Ill CANDIDATE EXAMINER

_______________

_____________

_____

________

CR0-ill fs Page2of9 REGION1I INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Withdrawal of Safety Rod Group 1 to 50%

Alternate Path:

Yes Facility JPM #:

New KIA Rating(s):

System: 001 KJA: G2.2.2 Rating: 4.6/4.1 Task Standard:

Begin withdrawal Of Safety Rod Group 1 To 50% and manually trip the reactor when CRD temperature limits are exceeded per OMP 1-18.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/i/Ni 105/019 (Rev 020) (Control Rod Drive System) End. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

OMP 1-18 (Rev 030) Implementation Standards During Abnormal and Emergency Events Validation Time: 10 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE Comments

CR0-ill fs Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS RECALL Snap 205 IMPORT CR0-i ii Simulator files G0T0RUN FIRE Timer I when CRD Group I is 10% withdrawn

CR0-Ill fs Page4of9 ToIsEuiprneM!ProGdure 1eeded -

OPIIIA.111051019 (Control Rod Drive System) End. 4.3 (Withdrawal Of Safety Rod Group I To 50%)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit I startup in progress OPI1/A11102/00I (Controlling Procedure For Unit Startup) Enclosure 4.13 CRD Patch Verification in progress Tc = 342°F RCS pressure = 567 psig INITIATING CUE The Control Room SRO directs you to withdraw CRD Group Ito 50% per OP/I/A/l 105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group I) beginning at Step 2.1.

The OSM has determined it is NOT desired to latch CRD Groups 2 thru 7 at this time.

CR0-ill fs Page 5 of 9 START TIME:

STEP 1: Step2.l Perform the following: (R.M.)

Ensure RUN is ON.

Ensure SINGLE SELECT SWITCH to ALL.

SAT STANDARD: Determine control rod speed switch is selected to RUN by observing light indication on the Diamond.

Determine SINGLE SELECT SWITCH is selected to ALL on the Diamond. UNSAT Continue to Step 2.2 COMMENTS:

STEP 2: Step 2.2 and 2.2.1 Perform latch and P1 alignment of CRD Groups, as follows:

WHILE CRDs are moving, monitor the following indications:

  • Appropriate ranged SAT NIs
  • Startup Rate STANDARD: As CRDs are withdrawn monitor the above indications.

UNSAT Continue to Step 2.2.2 COMMENTS:

CR0-ill fs Page6of9 CRCAL STEP NOTE: When LATCH AUTO is selected, the following automatically occurs:

  • Group/Rod inserts to latch rods (CRD TRAVEL In light ON)
  • Group/Rod withdraws to test for latching (CRD TRAVEL Out light ON)
  • Group/Rod inserts (CRD TRAVEL In light ON)
  • Group In Limit light on Diamond will momentarily extinguish then illuminate.

SAT STEP 3: Step 2.2.2 Perform Latch and P1 alignment of Group 1, as follows: (R.M.)

A. Ensure GROUP SELECT SWITCH to 1.

B. Ensure only Group 1 CONTROL ON lights are ON. (P1 panel) {9} UNSAT C. Select LATCH AUTO.

D. WHEN Auto Latch is complete:

  • Verify LATCH AUTO is OFF.
  • Verify Group 1 0% lights are ON. (P1 Panel)
  • Verify Group 1 API/RPI indications agree. (P1 Panel)

NOTE: The Reactor is manually tripped prior to the Shutdown Bypass automatic RPS trip on Unit Startup. For this reason, only Group 1 is required to be latched during a Unit Startup when RCS pressure <2100 psig.

STANDARD: Rotate GROUP SELECT SWITCH to 1.

Determine that only Group 1 CONTROL ON lights are ON on the P1 panel.

Depress the LATCH AUTO pushbutton.

WHEN Auto Latch is complete:

  • Verify LATCH AUTO is OFF.
  • Verify Group 1 0% lights are ON. (P1 Panel)
  • Verify Group 1 API/RPI indications agree using the position switch on the P1 Panel.

Continue to Step 2.2.3 COMMENTS:

STEP 4: Step 2.2.3 IF RCS pressure < 2100 psig, perform one of the following:

  • Go To Step 2.3.

SAT

  • Perform the remainder of enclosure to latch Groups 2 thru 7.

STANDARD: Go To Step 2.3.

Continue to Step 2.3 UNSAT COMMENTS:

CR0-ill fs Page7of9 3TEP5 Stup 2.3 - - -

CRfl1CAL STEP Select FAULT RESET.

SAT STANDARD: Depress the FAULT RESET pushbutton located on the diamond.

Continue to Step 2.4 COMMENTS:

UNSAT STEP 6: Step 2.4 Select Group 1, as follows: (R.M.)

. Ensure GROUP SELECT SWITCH to 1.

. Ensure only Group 1 CONTROL ON lights are ON. (P1 panel)

SAT STANDARD: Determine the GROUP SELECT SWITCH is selected to 1.

Determine that only Group I CONTROL ON lights are ON on the P1 panel.

UNSAT Continue to Step 2.5 COMMENTS:

STEP 7: Step 2.5 CRITICAL STEP Begin Group 1 withdraw to 50%. (R.M.)

STANDARD: Begin Group 1 withdrawal to 50% using the Joy Stick located on the Diamond. SAT

ALTERNATE PATH: As rods are withdrawn, CRD temperatures will begin to increase.

UNSAT COMMENTS:

STEP 8: OMP 1-18 Attachment A Step 1.17 CRITICAL STEP Initiate a manual reactor trip if any of the following conditions exist:

  • Two or more CRDM stator temperatures> 180°F STANDARD: When two or more CRD temperatures exceed 180°F then manually trip the reactor. SAT COMMENTS:

UNSAT END OF TASK TIME STOP:

CR0-ill fs Page8of9 CRiTICAL STEP EXPLANATIONS STEP # Explanation 3 This step is required to latch group 1 control rods.

5 This step is required to withdraw group I control rods.

7 This step is required to withdraw group I control rods.

8 This step is required to trip the reactor when CRD temperature limits are exceeded.

CANDIDATE CUE SHEET

-

- (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 startup in progress OP/I/A/l 102/001 (Controlling Procedure For Unit Startup) Enclosure 4.13 CRD Patch Verification in progress Tc = 342°F RCS pressure = 567 psig INITIATING CUE The Control Room SRO directs you to withdraw CRD Group I to 50% per OP/I/Ni 105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1) beginning at Step 2.1.

The OSM has determined it is NOT desired to latch CRD Groups 2 thru 7 at this time.

CR0-i 08 RO Page 1 of ii REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR0-I 08 ALIGN EMERGENCY BORATION DURING AN ATWS CANDIDATE EXAMINER 4 CO-tt( rbQ r2ne Acr thIQ. LI

________

_______

CR0-i 08 RO Page2of 11

-

- REGIONLI INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align Emergency Boration During An ATWS.

Alternate Path:

Yes Facility JPM #:

CRO-023 Modified K/A Rating(s):

System: BW/E 13 KIA: EA1.i Rating: 3 .413.2 Task Standard:

Steps of the EOP are properly completed by the candidate to align emergency boration during an ATWS per Rule 1.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EPI1IAJ1800IOO1, Rule 1 Validation Time: 5 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: I NAME SIGNATURE DATE COMMENTS

CR0-i 08 RO Page3of ii SIMULATOR OPERATOR INSTRUCTIONS

1. Recall IC-41
2. Import files for CRO-108
3. Go to RUN to allow timers to take effect and then FREEZE the simulator until the candidate has the unit.
4. Place a clean copy of Rule I on the front board.

CRO-108 RO Page4of 11 Tools/EguipmentlProcedures Needed:

EOPRuIe1 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A reactor trip should have occurred on Unit 1.

The control rod drive breakers failed to open and all control rods are withdrawn.

INITIATING CUES The Control Room SRO directs you to perform Immediate Manual Actions (IMAs).

Are there any Questions?

CR0-i 08 RO Page5of 11 STARTT[ME - -

STEP 1: IMAs Step 1 Depress REACTOR TRIP pushbutton.

SAT STANDARD: Candidate performs EOP IMAs from memory (per OMP 1-18) and depresses the REACTOR TRIP pushbutton located on UB1.

Candidate continues to Step 2. UNSAT COMMENTS:

STEP 2: IMAs Step 2 Verify reactor power < 5% FP and decreasing.

SAT STANDARD: Candidate performs EOP IMAs from memory and verifies reactor power

<5% and decreasing and determines that reactor power is > 5% on all Nis.

UNSAT Candidate performs Step 2 RNO.

COMMENTS:

STEP 3: Step 3 GO TO Rule 1 (ATWS/Unanticipated Nuclear Power Production).

SAT STANDARD: Candidate refers to Rule 1 Step 1.

UNSAT COMMENTS:

CR0-i 08 RO Page 6 of 11 STEP4: RufetStepl Verify jjy Power Range NI 5% FP.

SAT STANDARD: Candidate verifies any Power Range NI 5% FP and determines that all Power Range NIs are > 5% FR Candidate continues to Step 2. UNSAT COMMENTS:

STEP 5: Rule i Step 2 CRITICAL STEP Initiate manual control rod insertion to the IN LIMIT.

SAT STANDARD: Candidate initiates a manual control rod insertion by depressing the Manual pushbutton on the Diamond control panel and then locks the Control Rod Joystick in the INSERT (forward) position. UNSAT Candidate continues to Step 3.

COMMENTS:

STEP 6: Rule I Step 3 Notify CR SRO to GO TO UNPP tab.

SAT STANDARD: Candidate notifies the Control Room SRO to go to the UNPP tab of the EOP.

Candidate continues to Step 4. UNSAT COMMENTS:

CR0-i 08 RO Page 7 of ii STEP 7: Rule 1 Step 4 -.

- CRCAL STEP Open the following:

1HP-24 _SAT 1HP-25 STANDARD: Candidate locates I HP-24 and 1 HP-25 on I UB1 and rotates the UNSAT switches to the open position. Verify that the green closed lights go off and the red open lights illuminate.

Candidate continues to Rule 1 Step 5.

COMMENTS:

STEP 8: Rule 1 Step 5 Ensure only one of the following operating:

_IAHPIPUMP SAT lB HPI PUMP STANDARD: Candidate ensures either the IA or 1 B HPI pump is operating. UNSAT Candidate continues to Rule I Step 6.

NOTE: The IA HPI Pump is operating.

COMMENTS:

STEP 9: Rule I Step 6 CRITICAL STEP Start 1C HPI PUMP.

SAT STANDARD: Candidate locates the 1C HPI pump switch on 1UBI and rotates the switch to the CLOSE position and verifies white open light indicates off and the red closed lights are illuminated. 1C HPIP motor amps are UNSAT normal ( 60 amps).

Candidate continues to Rule 1 Step 7.

COMMENTS:

CR0-i 08 RO Page 8 of ii ALTENATE PATH -

STEP 10: Rule 1 Step 7 Open the following: SAT 1HP-26 1HP-27 UNSAT STANDARD: Candidate locates I HP-26 on 1 UB1 and rotates the control switch to the open position for 1 HP-26. Verify the green closed light indicates off and the red open light is illuminated.

Candidate determines that 1 HP-27 is already open Candidate determines that 1 HP-26 did not operate as expected and refers to Rule I Step 7 RNO.

NOTE: I HP-26 is failed closed and will not open.

COMMENTS:

STEP ii: Rule 1 Step 7 RNO CRITICAL STEP

1. IF 1 HP-26 will NOT open, THEN open 1 HP-41 0.

SAT

2. IF at least two HPI pumps are operating, AND 1 HP-27 will NOT

open, THEN perform the following:

A. Start the standby HPI pump.

B. Stop the 1C HPI PUMP. UNSAT C. Open IHP-409.

STANDARD: Candidate determines that I HP-26 will not open and then locates 1HP-410 on 1UB1 and rotates the control switch to the open position.

Verify the green closed light indicates off and the red open light is illuminated.

  • Verify flow is indicated in the B HPI crossover header.

Candidate verifies that two HPI pumps are operating and I HP-27 is open and continues to Rule 1 Step 8.

  • Flow verification NOT critical COMMENTS:

_________

CRO-108 RO Page 9 of 11 STEP12 Rutel-Step8 Dispatch one operator without wearing Arc Flash PPE to open 600V CRD breakers on the following:

1X9-5C (U-i CRD Norm Fdr Bkr) (Ui Equipment Rm) SAT 2X1-5B (U-i CRD Alternate Fdr Bkr) (T-3/Dd-28)

STANDARD: Candidate dispatches one operator to open Unit 1 normal and alternate UNSAT CRD feeder breakers without wearing Arc Flash PPE.

Candidate continues to Rule 1 Step 9.

COMMENTS:

STEP 13: Rule 1 Step 9 Verify only two HPI pumps operating.

SAT STANDARD: Candidate verifies two HPI pumps are operating by verifying the red ON lights are illuminated for the 1A or lB HPI pumps and the IC HPI pump.

Verify HPI pump motor amps are normal for the operating HPI pumps. UNSAT NOTE: The standby HPI pump may start due to the opening of IHP-410 robbing RCP seal injection flow. If this happens, the student should continue to Rule I Step 9 RNO to secure the IA or lB HPI pump. Otherwise, this is the END OF TASK.

COMMENTS:

END OF TASK STEP 14: Rule 1 Step 9 RNO IF ll HPI pumps operating, THEN perform the following: SAT

_Secure 1AOR lB HPI PUMP.

Place standby HPI pump in AUTO.

UNSAT STANDARD: Candidate secures the 1A or lB HPI pump by placing its control switch to the OFF position. Verify the red ON lights are OFF and the white OFF light is illuminated. Verify motor amps on the pump secured read zero.

NOTE: This step is a Critical Step only if the standby HPI pump started when IHP-4l0 was opened in Step 11 of this JPM.

COMMENTS:

ALTERNATE END OF TASK STOP TIME:

CRO-108 RO Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 5 Step 5 is required to initiate a manual control rod insertion and start adding negative reactivity to the core.

7 Step 7 is required to align emergency boration from the BWST to increase boron concentration in the RCS which will lead to a reduction in reactor power by adding negative reactivity to the core.

9 Step 9 is required to start the IC HPI pump to ensure HPI flow in both HPI headers.

II Step ills required to align flow to the A HPI header since I HP-26 is failed in the closed position.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS A reactor trip should have occurred on Unit 1.

The control rod drive breakers failed to open and all control rods are withdrawn.

INITIATING CUES The Control Room SRO directs you to perform Immediate Manual Actions (IMAs).

Are there any Questions

CRO-207 fs Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-207 CANDIDATE EXAMINER

CRO-207 fs Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Pressure makeup to Core Flood Tank Alternate Path:

No Facility JPM #:

CRO-55 K/A Rating(s):

System: 006 K/A: Al.13 Rating: 3.5/3.7 Task Standard:

Follow OP/i/All 104/001 (Core Flooding System) to increase CFT pressure Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/i/Ni 104/001 (Core Flooding System), rev 073 Validation Time: 10 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE COMMENTS

CRO-207 fs Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 206
2. IMPORT files for CR0- 207
3. Goto RUN

CRO-207 fs Page 4 of 9 Tools/Equipment/Procedures Needed OP/I/NI 104/001 (Core Flooding System) Enclosure 4.7 (Pressure Makeup To CFTs Using Nitrogen) Rev. 73 READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit I is operating at 100% power Core Flood Tank low pressure statalarm is actuated OP/I/NI 104/001 (Core Flooding System) Enclosure 4.7 (Pressure Makeup To CFTs Using Nitrogen) is in progress INITIATING CUES The CR SRO directs you to complete the pressurization of the affected CFT by pressurizing to 605 psig beginning at step 2.1 of Enclosure 4.7

CRO-207 fs Page5of9

-- STARTTIME - -

STEP 1: Step 2.1 CRITICAL STEP Notify operator to open iN-i 37 (CFTs Supply). (A-2-Hallway)

SAT STANDARD: Direct non-licensed operator to take a radio, open IN-i 37, communicate when the valve is open, and standby for further instruction.

Booth cue: Inform student that IN-137 is OPEN and you are standing by for further instructions. LINSAT COMMENTS:

STEP 2: Step 2.2 IF required to increase pressure in 1A CFT:

SAT STANDARD: Determine that 1A CFT is has low pressure by observing either:

The computer point for Core Flood Tank A on the Operator Aid Computer. U NSAT OR IA Core Flood Tank pressure gauge located on 1VB2.

Continue to step 2.2.1 COMMENTS:

NOTE: TS 3.6.3 Condition B requires penetration flow path to be isolated within one hour. A check valve with flow secured through the valve is considered operable.

SAT STEP 3: Step 2.2.1 Enter Technical Specification 3.6.3 Condition A and B.

U NSAT STANDARD: Notify the CR SRO to enter Technical Specification 3.6.3 Condition A and B.

Cue: Inform candidate that step 2.2.1 is complete and signed off COMMENTS:

CRO-207 fs Page 6 of 9 STEP 4: Step 2.2.2 CRfl1CAL SmP Open 1N-298 (N2 FILL CORE FLOOD TANK IA).

SAT STANDARD: Open 1N-298 the 1A Core Flood Tank nitrogen fill valve, located on 1VB2. Verify RED OPEN indicating light lit; Green CLOSE light off.

UNSAT COMMENTS:

STEP 5: Step 2.2.3 IF 1 N-128 (CFT IA Supply) is closed due to 1 N-298 leaks past seat, throttle IN-128(CFT lASupply)fora rate of 100 psig per 15 minutes SAT

( 6.6 psig/min). (A-4-409)

STANDARD: Determine 1N-128 is NOT closed. UNSAT Continue to Step 2.2.4.

Cue: If asked, inform candidate that IN-128 is not closed.

COMMENTS:

STEP 6: Step 2.2.4 Monitor IA CFT pressure.

SAT STANDARD: Observe computer point or pressure gauge for IA Core Flood Tank on 1VB2 and verify Core Flood Tank pressure is increasing.

UNSAT COMMENTS:

CRO-207 fs Page 7 of 9 STEP 7: Step 2.2.5 IF AT ANY TIME ES actuation occurs, close 1N-298 (N2 FILL CORE FLOOD TANK 1A). SAT STANDARD: Determine ES actuation has not occurred by observing:

Statalarm Panel ISA-i UNSAT Alarm 10 and 11 on rows A thru D NOT in alarm COMMENTS:

STEP 8: Step 2.2.6 CRITICAL STEP WHEN pressurization of 1A CFT complete, close 1N-298 (N2 FILL CORE FLOOD TANK 1A).

SAT STANDARD: Close the 1N-298 located on 1VB2 when Core Flood Tank pressure is approximately 605 psig (595 psig to 615 psig). Verify CFT pressure stops increasing. UNSAT COMMENTS:

END TASK STOP TIME:

CRO-207 fs Page 8 of 9 CRITICAL STEP EXPLANAT!ONS STEP# EXPLANATION 1 Valve must be opened to pressurize CFT.

4 Required to pressurize the CFT.

8 Required to prevent over pressurizing the CFT.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit i is operating at 100% power Core Flood Tank low pressure Statalarm is actuated OP/i/NI 104/001 (Core Flooding System) Enclosure 4.7 (Pressure Makeup To CFTs Using Nitrogen) is in progress INITIATING CUES The CR SRO directs you to complete the pressurization of the affected CFT by pressurizing to 605 psig beginning at step 2.1 of Enclosure 4.7

CRO-302 fs Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-302 CANDIDATE EXAMINER

___________

___________

_____

________

____

__

CRO-302 fs Page2of9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform 1 RC-66 (PORV) Stroke Test Alternate Path:

Yes Facility JPM #:

CR0-i 01 KIA Rating(s):

System: 010 KIA: A4.03 Rating: 4.0/3.8 Task Standard:

Perform 1 RC-66 (PORV) Stroke Test per procedure and close 1 RC-4 when I RC-66 fails to close.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

PT/i /A/0201/004 (Rev 009) (1 RC-66 Stroke Test)

Validation Time: 10 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: I NAME SIGNATURE DATE Comments

CRO-302 fs Page3of9 SIMULATOR OPERATOR INSTRUCTIONS RECALL Snap 202 IMPORT CRO-302 files PLACE TIC Sheet CR Tags on Component Drain and QT pump switches.

CRO-302 fs Page4of9 ToOI&EguipnieiitlProcedures Needed PT/11A102011004 [1 RC-66 (PORV) Stroke Test]

Stopwatch READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit I RCS pressure is at approximately 40 psig (Low Range Cooldown Pressure)

The Quench Tank is aligned in recirc per OP/i 1A111041017 (QT Operation)

A steam bubble has been established in the Pressurizer PT/i /A/02011004, I RC-66 Stroke Test is in progress.

INITIATING CUE The CRSRO directs you are to complete PTI1/A10201/004 (1 RC-66 Stroke Test) beginning at Step 12.4.

CRO-302 fs Page5of9 Note: Pfiorto the JPM, bitéf Will be hold With the candidate t explain the role of the extra RO and the operation of the stop watch.

START TIME:

STEP 1: Step 12.4 Verify operability of 1 RC-4 (PRZ RELIEF BLOCK) as follows:

  • Close 1RC-4 (PRZ RELIEF BLOCK).
  • Open I RC-4 (PRZ RELIEF BLOCK).

STANDARD: Close 1 RC-4 by rotating the switch to close and verifying that the green close light illuminates and the red open light goes out. SAT Open 1 RC-4 by rotating the switch to open and verifying that the green close light goes out and the red open light illuminates.

UNSAT Continue to Step 12.5 COMMENTS:

NOTE:

  • Quench Tank pressure change should be minimal during PORV operation.
  • If Quench Tank High Pressure alarm is received, Pressurizer Steam Bubble may be inadequate.

STEP 2: Step 12.5 and 12.5.1 Open 1 RC-66 (PORV) as follows:

  • Record O1A1 568 RC-66 RELIEF OUTLET TEMP: SAT Continue to Step 12.5.2 STANDARD: Refer to the OAC and record OIA1 568 RC-66 RELIEF OUTLET UNSAT TEMP: °F Continue to Step 12.5.2 COMMENTS:

STEP 3: Step 12.5.2 CRITICAL STEP Position the 1 RC-66 SETPOINT SELECTOR to OPEN.

STANDARD: Candidate rotates the 1 RC-66 SETPOINT SELECTOR to OPEN. SAT Continue to Step 12.5.3 COMMENTS: UNSAT

CRO-302 fs Page6of9 CRITICAL STEP NOTE:

  • I RC-66 remains open when the OPEN PERMIT Pushbutton is released until 1 RC 66 SETPOINT SELECTOR position is changed to LOW.
  • It is permissible to leave I RC-66 open while recording stroke time on Valve Data Sheet.

STEP 4: Step 12.5.3 SAT Simultaneously perform the following:

  • Depress the 1RC-66 OPEN PERMIT pushbutton.
  • Start stopwatch.

UNSAT STANDARD: Depresses the I RC-66 OPEN PERMIT pushbutton.

Continue to Step 12.5.4 Note: The extra RO will operate the stopwatch.

COMMENTS:

STEP 5: Step 12.5.4 When PORV flow monitor indicates flow, stop stopwatch.

STANDARD: The extra RO will operate the stopwatch. SAT Continue to Step 12.5.5 COMMENTS: UNSAT STEP 6: Step 12.5.5 Record open stroke time on Valve Data Sheet.

STANDARD: The extra RO will record the stroke time on the Valve Data Sheet.

SAT Continue to Step 12.5.6 COMMENTS:

UNSAT

CRO-302 fs Page 7 of 9 STEP7 Step 12.5.6 -

Simultaneously perform the following:

  • Select LOW on 1 RC-66 SETPOINT SELECTOR.
  • Start Stopwatch.

STANDARD: Rotate the 1 RC-66 SETPOINT SELECTOR to LOW on 1 UB1.

SAT Continue to Step 12.5.7 ALTHERNATE PATH: IRC-66 will NOT close.

UNSAT COMMENTS:

STEP 8: Step 12.5.7 CRITICAL STEP Perform EITHER:

  • WHEN PORV flow monitor indicates no flow, stop stopwatch.
  • IF 1 RC-66 (PORV) fails to close, immediately close 1 RC-4 (PRZ RELIEF BLOCK). _SAT STANDARD: Determine 1 RC-66 did not close and close 1 RC-4 by rotating the switch to the closed position and verifying that the red open light goes out and the green close light illuminates. UNSAT COMMENTS:

END OF TASK TIME STOP:

CRO-302 fs Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 This step is required to open 1RC-66 4 This step is required to open I RC-66 8 This step is required to stop flow through I RC-66.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 RCS pressure is at approximately 40 psig (Low Range Cooldown Pressure)

The Quench Tank is aligned in recirc per OP/1/A111041017 (QT Operation)

A steam bubble has been established in the Pressurizer PTI1/A10201/004, 1 RC-66 Stroke Test is in progress.

INITIATING CUE The CRSRO directs you are to complete PT/11A10201/004 (IRC-66 Stroke Test) beginning at Step 12.4.

CRO-405 fs Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-405 CANDIDATE EXAMINER

CRO-405 fs Page 2 of 11 REGIONH INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align ECCS Suction to the Emergency Sump Alternate Path:

Yes Facility JPM #:

CRO-096 KIA Rating(s):

System: BW/E08 K/A: EA1.1 Rating: 4.0/3.7 Task Standard: .12, ECCS Suction Swap to RBES is properly completed to align ECCS to the Emergency sump.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EPIIIAI1800IO1, (Rev 038A) LOCA CD .12 (Rev 038A) (ECCS Suction Swap to RBES) of the EOP Validation Time: 15 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: I NAME SIGNATURE DATE COMMENTS

CRO-405 fs Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS

1. RecaII2O4
2. Import files for CRO-405
3. Goto run
4. ENSURE BWST on OAC (SHOWDIG 01 P1 600)
5. Timer 3 will lower BWST Level to < 15 if needed at step 4
6. Timer 4 will lower BWST Level to < 9 if needed at step 5
7. Timer 4 will lower BWST Level to < 6 if needed at step 7

CRO-405 fs Page 4 of 11 Tools/Eq u ipmentlProcedures Needed .12, ECCS Suction Swap to RBES, of the EOP READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A large break LOCA has occurred which is depleting the BWST.

INITIATING CUES The Control Room SRO directs you to Align ECCS Suction to the Emergency Sump per .12, ECCS Suction Swap to RBES, of the EOP.

CRO-405 fs Page5of 11

-- START TIME -

STEP 1: Step 1 Start both of the following:

  • lB LPI Pump STANDARD: Locates control switches for 1A and 1 B LPI Pumps on I UB2 and SAT observes red ON lights are illuminated and pump amps indicated.

Continue to Step 2 UNSAT COMMENTS:

STEP 2: Step 2 Verify either:

  • LPI FLOW TRAIN A jj LPI FLOW TRAIN B 3400 gpm
  • Only one LPI header is operating, AND flow in that header is 2900 gpm STANDARD: Candidate should determine that step is met by observing LPI FLOW SAT TRAIN A gj LPI FLOW TRAIN B is 3400 gpm. Flow gauges are located on 1 UB2.

Continue to Step 3 UNSAT COMMENTS:

STEP 3: Step 3 GO TO Step 52 STANDARD: GO TO Step 52.

SAT Continue to Step 52 COMMENTS:

UNSAT

CRO-405 fs Page6ofll STEP 4: Step 52 CRITICAL STEP WHEN WSTlevuI is 15, THEN stop ji HPI pumps.

STANDARD: Locates the BWST level gauges on 1 UB2. The candidate determines level to be 15.

or May obtain BWST level from the OAC (Operator Aid Computer), at 1 UBI, 1 UB2, or STA monitor. SAT or ICCM monitors on 1 UB1.

Candidate places control switch for any operating HPI pump in the TRIP UNSAT or PTL position and observes ll HPI pumps are not operating by the red ON lights not illuminated.

Continue to Step 53 Cue: If needed, in form candidate that using time compression BWST level will be lowered to < 15 and RB level will be increased.

COMMENTS:

NOTE RB level of 2 is expected when BWST level reaches 9.

STEP 5: Step 53 WHEN BWST level 9, AND RB level is rising, THEN continue procedure.

STANDARD: Observes BWST level <9 feet on gauges on 1 UB2 or from the OAC SAT (IUB1, 1 UB2, or STA monitor) or the ICCM monitors on 1 UB1.

Continue to Step 54 UNSAT Cue: If needed, inform candidate that using time compression BWST level will be lowered to <9 and RB level will be increased.

COMMENTS:

CRO-405 fs Page7ofll STEP 6: Step 54 CRITICAL STEP Simuttaneousty open the fotlowtng

STANDARD: Candidate locates the control switch for 1LP-19 (lA RX. BLDG.

SUCTION) on 1 UB2 and rotates the switch in the OPEN direction.

Observes red OPEN light comes on, and green CLOSED light goes off.

Then locates the control switch for 1LP-20 (lB RX. BLDG. SUCTION) SAT on 1 UB2 and rotates the switch in the OPEN direction. Observes red OPEN light comes on, and green CLOSED light goes off.

Continue to Step 55 UNSAT Note: The candidate should operate both valves at the same time.

COMMENTS:

STEP 7: Step 55 IAAT BWST level 6, THEN perform Steps 56 59.

STANDARD: Candidate verifies BWST level 6 using:

BWST level gauges on 1 UB2.

BWST level from the OAC, at 1 UB1, I UB2, or STA monitor.

ICCM monitors on 1UB1.

SAT When BWST level is 6 go to the IAAT step and then perform Steps 56 through 59 Continue to Step 56 UNSAT Cue: If needed, inform candidate that using time compression BWST level will be lowered to <6 and RB level will be increased.

COMMENTS:

STEP 8: Step 56 Verify 1LP-19 open. (1A RB Suction)

STANDARD: Locates the control switch for 1LP-19 on 1UB2 and observes red OPEN light is illuminated. SAT Continue to Step 57 COMMENTS: UNSAT

CRO-405 fs Page8ofll STEP 9: Step 57

-

- Verify 1LP2O open. (1B RB Suction)

STANDARD: Locates the control switch for 1 LP-20 on 1 UB2 and observes red OPEN light is illuminated. SAT Continue to Step 58 COMMENTS: UNSAT STEP 10: Step 58 *CRITICAL STEP Simultaneously close the following:

STANDARD: The candidate locates the control switch for 1 LP-21 on 1 UB2 and rotates it in the CLOSE direction. SAT ALTERNATE PATH: ILP-21 will not close.

The candidate then locates the control switch for 1 LP-22 on I UB2 and UNSAT rotates it in the CLOSE direction. Observes green closed light on and red open light off.

Candidate recognizes that 1LP-21 did not close by observing green closed light off and red open light on.

Continue to Step 58 RNO COMMENTS:

STEP 11: Step 58 RNO CRITICAL STEP IF 1 LP-21 fails to close, THEN perform the following:

  • Stop 1A LPI PUMP.
  • Stop IARBS PUMP.

STANDARD: Locates LPI Pump A control on 1 UB2 and turns pump switch to off. SAT Red light is observed off and white light on.

Locates RB Spray Pump A control on I UB2. MANUAL pushbutton for ES channel 7 is depressed. RB Spray Pump A switch is rotated to the UNSAT OFF position. Green OFF light is lit and the red RUN light is off.

Continue to Step 59 COMMENTS:

CRO-405 fs Page 9 of 11 STEP 12: Step 59 CRITICAL STEP

- Dispatch an operator to-cLose 1 LP-28 (BWST Outlet) (East of Unit I BWST).

STANDARD: An operator is dispatch to close 1 LP-28 (BWST Outlet) (East of Unit 1 SAT BWST).

Booth cue: An operator has been dispatched to close ILP-28.

UNSAT Cue: Inform candidate task is complete and another RO will continue with this task.

COMMENTS:

END TASK STOP TIME:

CRO-405 fs Page lOof 11 CRmCAL STEP EXPLANATIONS STEP # Explanation 4 Protects HPI pumps 6 Aligns LPI Pump suction to Reactor Building Emergency Sump.

10 Secures LPI Pump suction from the BWST.

11 IA LPI and IA RBS pumps are secured to prevent damage.

12 Close I LP-28 (BWST Isolation) - Isolates suction from the BWST.

CANDIDATE CUE SHEET (TO BE RETIJRNEDTO EXAMINER 1JP0t4 COMPLETIONOF TASK)

INITIAL CONDITIONS A large break LOCA has occurred which is depleting the BWST.

INITIATING CUES The Control Room SRO directs you to Align ECCS Suction to the Emergency Sump per .12, ECCS Suction Swap to RBES, of the EOP.

CRO-407 fs Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-407 CANDIDATE EXAMINER

CRO-407 fs Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Establish EFDW flow through Startup valves Alternate Path:

Yes Facility JPM #:

CRO-015 K/A Rating(s):

System: APE-054 K/A: AA2.04 Rating: 4.2/4.3 Task Standard:

EFDW flow is established to the affected header through the startup valve.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EOP Rule 3 (Rev 038A), (Loss of Main or Emergency FDW)

EOP Rule 7 (Rev 038A), (SG Feed Control)

EOP Enclosure 5.27 (Rev 038A), (Alternate Methods for Controlling EFDW Flow)

Validation Time: 10 minutes Time Critical: NO Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner:

NAME SIGNATURE DATE COMMENTS

CRO-407 fs Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 207
2. Import files for CRO-407
3. Goto RUN

CRO-407 fs Page 4 of 12 TootslEguinmentlP rocedu res Needed EOP Rule 3, Loss of Main and Emergency Feedwater EOP End 5.27, Alternate Methods for Controlling EFDW Flow READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The reactor has just tripped from 25% power Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check

CRO-407 fs Page 5 of 12 STARTTIME:

STEP 1: Performs a Symptom Check STANDARD: Performs Symptom Check and determines that there are no symptoms to report but will perform Rule 3 due to a loss of Main Feedwater SAT Cue: CR SRO acknowledges performing Rule 3 due to a Loss of MaIn Feedwater.

COMMENTS: UNSAT STEP 2: Rule 3: Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

STANDARD: Observes that TB Flooding is NOT occurring by 2SA-18/A-1 1 (Turbine BSMT Water Emergency High Level) NOT illuminated. SAT (OP/2/A/61 02/018)

Candidate will perform RNO step and GO TO step 3.

UNSAT COMMENTS:

STEP 3: Rule 3: Step 3 IAAT NO SGs can be fed with FDW (Main/CBP/Emergency),

AND any of the following exist:

. RCS pressure reaches 2300 psig OR NDT limit

. Pzr level reaches 375 [340 acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling). SAT STANDARD: Candidate determines rule 4 is not required.

Continue to Step 4. UNSAT COMMENTS:

STEP 4 Rule 3: Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.

STANDARD: Observes MD EFDWP & TD EFDWP running with switch lights on and SAT normal discharge pressure.

Continue to Step 5.

COMMENTS: UNSAT

CRO-407 fs Page 6 of 12 S]EEP: Rule 3: Step 5 Verifies that py EFDW Pump is operating.

STANDARD: Checks MD EFDWP & TD EFDWP switch lights are on and Pumps have normal discharge pressure.

SAT Continue to Step 6.

COMMENTS: UNSAT STEP 6: Rule 3: Step 6 GO TO step 37.

STANDARD: GO TO step 37. SAT COMMENTS:

UNSAT STEP 7: Rule 3: Step 37 IAAT an EFDW valve CANNOT control in AUTO, OR manual operation of EFDW valve is desired to control flow/level, THEN perform Steps 38 42.

-

ALTERNATE PATH STANDARD: Determines that 1FDW-315 is NOT controlling properly(1A SG level is

< 30 and decreasing). Concludes that 1 FDW-31 5 has failed closed.

.

Continue to Step 38. UNSAT

COMMENTS:

STEP 8: Rule 3: Step 38 Place EFDW valve in MANUAL.

STANDARD: Place 1 FDW-31 5 in MANUAL by depressing the AIM pushbutton on the Moore controller.

SAT Continue to Step 39.

COMMENTS:

CRO-407 fs Page 7 of 12 STEP 9: Rule 3: Step39 Control EFDW flow with EFDW valve in MANUAL.

STANDARD: Determine that 1 FDW-31 5 will NOT control in MANAUL.

SAT Perform RNO, GO TO Step 41.

Continue to step 41

_UNSAT COMMENTS:

STEP 10: Rule 3: Step 41 Notify CR SRO that End 5.27 (Alternate Methods for Controlling EFDW CRITICAL STEP Flow) is being initiated.

SAT STANDARD: Removes End. 5.27 from EOP and initiates.

Cue: CR SRO acknowledges entry into Enclosure 5.27.

UNSAT COMMENTS:

STEP 11: End 5.27: Step 1 Identify the failure:

1 FDW-31 5 has Failed CLOSED [GO TO Step 2]

STANDARD: Candidate determines the next procedural step from table in Step 1. SAT Continue to Step 2.

COMMENTS: UNSAT STEP 12: End 5.27: Step 2 Verify IA MD EFDWP is operating STANDARD: Candidate verifies 1A MD EFDWP is operating. Verify red light on and green light off and normal discharge pressure. SAT Continue to Step 3.

COMMENTS: UNSAT

CRO-407 fs Page 8 of 12 STEP 13. - - End- 5-27:Steps 3 - -

GRITIGAI= STEP Stop 1A MD EFDWP STANDARD: Candidate places switch to OFF. Verify red light off and white light illuminated. SAT Continue to Step 4.

COMMENTS: UNSAT STEP 14: End 5.27: Step 4 Verify lB MD EFDWP is operating.

STANDARD: Candidate verifies 1 B MD EFDWP is operating. Verify red light on and SAT green light off and normal discharge pressure.

Continue to Step 5.

UNSAT COMMENTS:

STEP 15: End 5.27: Step 5 CRITICAL STEP Place I TD EFDW Pump in PULL TO LOCK STANDARD: Candidate places the UI TD EFDW Pump in PULL to LOCK and verifies red light is out and green light is lit. SAT Continue to Step 6.

COMMENTS: UNSAT STEP 16: End 5.27: Step 6 CRITICAL STEP Place 1 FDW-35 in HAND and set demand to 0%

STANDARD: Candidate places 1 FDW-35 in HAND and uses toggle switch to reduce demand to 0%. SAT Continue to Step 7.

COMMENTS: UNSAT

CRO-407 fs Page 9 of 12 STEP I 7: Enl 527 Step 7 - CRITICAL STEP Close I FDW-33 STANDARD: Candidate closes SU Control Block Valve (1 FDW-33) and verifies red light is out and green light is lit. SAT Continue to Step 8.

COMMENTS: UNSAT STEP 18: End 5.27: Step 8 Verify 1A MD EFDWP will be used.

STANDARD: Candidate determines that the 1A MD EFDWP will be used.

Continue to Step 9. SAT Cue: If candidate asks if IA MD EFDWP will be used, inform him that the CR SRO directs using the IA MD EFDWP.

UNSAT COMMENTS:

STEP 19: End 5.27: Step 9 CRITICAL STEP Open 1 FDW-374 STANDARD: Candidate locates and opens I FDW-374 and observes green closed light off and red open light on.

SAT Continue to Step 10.

COMMENTS:

UNSAT STEP 20: End 5.27: Step 10 Verify the following:

  • 1 FDW-36 closed
  • 1 FDW-38 open STANDARD: Candidate locates and closes 1 FDW-36 and observes green closed light on and red open light off on 1VB3 or uses OAC indication. SAT Candidate locates and opens I FDW-38 and observes green closed light off and red open light lit on 1VB3 or uses OAC indication.

UNSAT Continue to Step 11.

COMMENTS:

CRO-407 fs Page 10 of 12 STEP 21: End 527: Step ti - * - CRITIGAk STEP Start 1A MD EFDWP STANDARD: Candidate places 1A MD EFDWP switch to RUN and verifies pump start SAT by observing white light is off and red light is lit and proper discharge pressure.

Continue to Step 12. UNSAT COMMENTS:

NOTE:

Flow from the TD EFDWP through a S/U control valve should be read on the FDW SU FLOW gauge.

Flow from MD EFDWP through a S/U control valve should be read on the MDEFWP DISCH FLOW gauge.

STEP 22: End 5.27: Step 12 SAT Verify either of the following exists:

  • HPI Forced Cooling is maintaining core cooling
  • CBP Feed providing SG feed UNSAT STANDARD: Candidate determines that neither condition is met and goes to the RNO.

Continue to Step 12 RNO.

COMMENTS:

STEP 23: End 5.27: Step 12 RNO CRITICAL STEP IF any SG is being fed, THEN perform the following:

  • Throttle IFDW-35 to establish 100 gpm.
  • Throttle 1 FDW-35 to obtain desired SG level per Rule 7 (SG Feed Control)

Notify CR SRO of SG Feed Status (not critical)

SAT STANDARD: Candidate throttles 1 FDW-35 to attain 100 gpm flow initially on MD EFWP DISCH FLOW gauge or OAC EFW graphic, then throttles 1 FDW 35 as necessary to establish 25 XSUR (per Rule 7 table 4)

UNSAT Rule 7 Table 4 specifies the level to establish when using EFDWP is 30 (use MFDW setpoint if feeding via S/U CVs). The MFDW setpoint(i.e.

when using the S/U CVs) is 25.

Note: The candidate does not need to establish this level to complete the JPM.

IFDW-35 must be open and SG level increasing.

COMMENTS:

END TASK STOP TIME:

Cl)

-I N) N) - - - - - - m C) - CO - C) C C)

H H H H H H H H D D D D D D D D 5* 5* 5* ;5* E5* E5 Cl) Cl) Cl) Cl) Cl) Cl) Cl) Cl)

.-4 . - _4-CD CD CD CD CD CD CD CD C) C) C) C) C)

. . . s. * . .

- - - - 1 1 - -

CD CD CD CD CD CD CD CD a C) 0 C C C C c c c c CD CD CD CD CD CD CD CD C)

C) C). C). Cl Cl Cl Q Q

o o 0 0 0 0 0 0 CD Cl) Cl) Cl) Cl) CD CD CD D D D C)

Cl Cl) Cl) Cl)

D D C C C r

- _. - - -

D - - CD CD CD CD CD CD CD -

D D D CD CD CD m C) C) C) < < 0 m m m - -

o CD CD CD m C) C) C) Cl) Cl) 0

- u - c1 E

> . 0 0

- 0 0 Z

-

CD CD Cl) C CD CD CD Cl) Cl)

C)- CD C) a C C C C z

< D D D 0 CD CD CD CD CD C)_ C)_ C)_

CD CD CD

CD C)-

Cl) -o o

C

- CD 0

D -O

-4 o c

-q--.J

CAI4DLDATE CUE SKEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS The reactor has just tripped from 25% power Immediate Manual Actions are complete INITIATING CUES The SRO directs you to perform a Symptoms Check

CRO-503 fs Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-503 CANDIDATE EXAMINER

CRO-503 fs Page2of9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform EOP End 5.35 (Containment Isolation)

Alternate Path:

No Facility JPM #:

New KIA Ratinci(s):

System: 103 K/A: G2.1.23 Rating: 4.3/4.4 Task Standard:

Perform EOP End 5.35 (Containment Isolation) correctly.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EOP End 5.35 (Rev 038A) (Containment Isolation)

Validation Time: 10 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: I NAME SIGNATURE DATE Comments

CRO-503 fs Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS RECALL Snap 203 IMPORT Simulator files for CRO-503

CRO-503 fs Page 4 of 9 Tools!Eguipment!Procedures Needed -

EOP End 5.35 (Containment Isolation)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit I reactor trips from 100% power due to a spurious Main Turbine trip RCS leak of 190 gpm occurs as result of the trip EOP LOCA CD tab is in progress INITIATING CUE The CR SRO directs you to perform EOP End 5.35 (Containment Isolation)

CRO-503 fs Page5of9 START T1ME

-

-

STEP 1: Step 1 Verify End 5.1 (ES Actuation) is in progress or complete.

STANDARD: Determine ES has NOT actuated and perform the RNO step. SAT Continue to Step 1 RNO 1.

COMMENTS: UNSAT STEP 2: Step I RNO 1. *CRITICAL STEP

1. Close the following ES operated RB isolation valves:

J ES Chan 1 ES Chan 2 1HP3* 1HP-5 1HP-4 1GWD-12 1GWD-13 1LWD-1 1LWD-2 SAT 1CS-5 1CS-6 1PR-1 1PR-2 1PR-6 1PR-3 1PR-4 UNSAT 1PR-5 1PR7* iPR8*

1PR9* 1PR10*

1RC-5 1RC-7 1RC-6 1 FDW-1 05 1 FDW-1 06 1FDW-107 1FDW-108 1 FDW-103 1FDW-104 STANDARD: The above valves are closed.

ALTERNATE PATH: IHP-4 will NOT close.

Continue to Step 1 RNO 2.

COMMENTS:

CRO-503 fs Page6of9 StP3: Step1NO2. - -

2. IF 1 HP-3 fails to close, THEN close 1HP-1 STANDARD: Observe that 1 HP-3 is closed with red light off and green light on. SAT Continue to Step 1 RNO 3.

COMMENTS: UNSAT STEP 4: Step 1 RNO 3. CRITICAL STEP

3. IF 1 HP-4 fails to close, THEN close 1HP-2 STANDARD: Determine 1 HP-4 is open by observing red open light on and green closed light off. SAT Position 1 HP-2 switch in closed position and verify green closed light on and red open light off.

U NSAT Continue to Step 2 COMMENTS:

STEP 5: Step 2 Verify aU RCPs off.

STANDARD: Determine that all RCPs are operating by observing red on light lit and RCP amps indicate normal. Perform RNO. SAT GO TO Step 5 COMMENTS: UNSAT

CRO-503 fs Page7of9 STEP 6: Step 5 - CRfl1CAL STEP Rotate switches to the closed position for the following components.

  • 1LPSW-1062 SAT Note: Either ILPSW-1 054 or ILPSW-55 and ILPSW-1061 or ILPSW-1 062 must be closed to satisfy this critical step.

UNSAT STANDARD: Rotate the above switches to the closed position located on 1VB3.

Continue to Step 6 COMMENTS:

STEP 7: Step 6 Verify the following components indicate closed.

  • ILPSW-1054
  • 1LPSW-1 062 SAT STANDARD: Verify the above valves indicate closed by observing the green closed light is lit located on 1VB3.

UNSAT Continue to Step 7 COMMENTS:

STEP 8: Step 7 EXIT this enclosure.

SAT STANDARD: Exit the enclosure.

COMMENTS:

UNSAT END OF TASK TIME STOP:

CRO-503 fs Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 This step is critical to isolate the Reactor Building.

4 This step is critical as it since I HP-4 is failed open 1 HP-2 isolates this pathway.

6 This step is critical to isolate the Reactor Building.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit I reactor trips from 100% power due to a spurious Main Turbine trip RCS leak of 190 gpm occurs as result of the trip EOP LOCA CD tab is in progress INITIATING CUE The CR SRO directs you to perform EOP End 5.35 (Containment Isolation)

. .

CRO-603 fs Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-603 CANDIDATE EXAMINER

CRO-603 fs Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform A Manual Start Of Keowee Hydro Unit 1 Alternate Path:

No Facility JPM #:

CR0-i 06 K/A Rating(s):

System: 062 K/A: A4.07 Rating: 3.1/3.1 Task Standard:

Keowee Hydro Unit 1 is manually started and synchronized to the 230 Ky switchyard.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OPIOIAI1 106/019 (Rev 086) (Keowee Hydro At Oconee), End 4.3 (KHU-1 Manual Startup)

Validation Time: 15 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE Comments

CRO-603 fs Page3of9 SIMIJLATOR OPERATOR 1NSTRtJCTIO1S RECALL IC-41 IMPORT CRO-603 files ENSURE KHU #1 in REMOTE

CRO-603 fs Page4of9 TólslEquipmentlProcedures Needed -

OP/0/A/1 106/019 (Keowee Hydro At Oconee)

  • Limits and precautions
  • End 4.3 (KHU-1 Manual Startup)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Keowee Unit 1 is aligned to the Overhead.

Keowee Unit I is to be manually started and tied to the grid.

This is NOT an emergency.

OP/0/AI1 106/19, Enclosure 4.3 (KHU-1 Manual Startup) is in progress INITIATING CUE The CR SRO directs you to continue with a manual start of Keowee Unit 1, and tie it to the grid with no load, per OP/0/A11106/19, Enclosure 4.3 beginning at Step 2.1.

CRO-603 fs Page5of9 START TIME:

STEP 1: Step 2.1 CRITICAL STEP Place UNIT 1 MASTER SELECTOR in MAN.

STANDARD: UNIT 1 MASTER SELECTOR switch positioned to MAN.

SAT Continue to Step 2.2 COMMENTS:

UNSAT STEP 2: Step 2.2 CRITICAL STEP Place UNIT 1 SYNC 230 KV selector in MAN.

STANDARD: UNIT 1 SYNC 230 KV selector switch positioned to MAN. SAT Continue to Step 2.3 COMMENTS: UNSAT STEP 3: Step 2.3 IF this is NOT an emergency situation, notify Keowee operator to activate the Tailrace Rising Water Alarm Test button on CB-5.

STANDARD: Determine this is not an emergency situation and notify Keowee Operator to activate the Tailrace Rising Water Alarm Test button on CB-5.

Booth cue: Keowee operator (Casey Holder) reports Tallrace Rising Water Alarm Test button on CB-5 is active.

UNSAT Continue to Step 2.4 COMMENTS:

STEP 4: Step 2.4 CRITICAL STEP Place AND hold UNIT I LOCAL MASTER switch to START position for> 10 seconds until KHU starts.

STANDARD: UNIT I LOCAL MASTER switch held in the START position for >10 SAT seconds and verifies that the Turb I Gate Position increases on 2AB3.

Continue to Step 2.5 UNSAT COMMENTS:

CRO-603 fs Page 6 of 9 STEP 5: Step 7.5 CRITICAL STEP WHEN TURBINE 1 GATE POSITION indicator settles out:

  • Momentarily place EXCITER STOP/START to START.
  • Verify EXCITER STOP/START Red START light ON, Green STOP light OFF.

STANDARD: Candidate observes that the TURBINE I GATE POSITION has settled out and then:

  • Momentarily place EXCITER STOP/START to START. SAT
  • Observes EXCITER STOP/START Red START light ON, Green STOP light OFF and GEN FREQ is about 60 HZ and Keowee 1 Output volts is about 13.8 KV.

UNSAT Continue to Step 2.6 COMMENTS:

STEP 6: Step 2.6 CRITICAL STEP IF required, synchronize KHU-1 to the grid:

2.6.1 Make the following adjustments concurrently as required:

  • Using UNIT I AUTO VOLTAGE ADJUSTER, match KEOWEE 1 LINE VOLTS with KEOWEE 1 OUTPUT VOLTS when 13.8 KV SYNCHROSCOPE pointer is vertical.
  • Adjust KHU-1 Generator speed with UNIT I SPEED CHANGER MOTOR until slow clockwise rotation of 13.8 KV SAT SYNCHROSCOPE is established.

2.6.2 WHEN 13.8 KV SYNCHROSCOPE pointer is 5° before reaching vertical, close ACB 1 KEOWEE I GENERATOR BKR.

UNSAT STANDARD: 2.6.1 Determine that KHU-1 is required to be synced to the grid and make the following adjustment:

  • UNIT 1 AUTO VOLTAGE ADJUSTER manipulated to match KEOWEE 1 LINE VOLTS with KEOWEE I OUTPUT VOLTS when 13.8 KV SYNCHROSCOPE pointer is vertical.
  • KHU-1 Generator speed adjusted with UNIT I SPEED CHANGER MOTOR until slow clockwise rotation of 13.8 KV SYNCHROSCOPE is established.

2.6.2 ACB 1 KEOWEE I GENERATOR BKR switch is taken to close when the 13.8 KV SYNCHROSCOPE pointer is 5° before vertical, and observes the red close light lit and the white open light off.

Continue to Step 2.7 COMMENTS:

CRO-603 fs Page7of9 CAUTION: KHU-1 load should NOT be reduced below indicated zero (O)MW I STEP 7: Step 2.7 IF required, perform the following concurrently:

  • Adjust load to zero (0) MWs with UNIT 1 SPEED CHANGER MOTOR.

SAT

  • Adjust MVARS to zero (0) with UNIT 1 AUTO VOLTAGE ADJUSTER.

STANDARD: UNIT 1 AUTO VOLTAGE ADJUSTER manipulated to obtain zero (0) UNSAT MVARS.

KHU-1 Generator speed manipulated to obtain zero (0) MWs.

COMMENTS:

END TASK TIME STOP:

CRO-603 fs Page8of9 CRITICAL STEP EXPLANATIONS STEP # Explanation I This step is required to manually start KHU-1.

2 This step is required to manually start KHU-I.

4 This step is required to start KHU-I.

5 This step is required to excite the KHU-I generator.

6 This step is required to synchronize KHU-I to the grid.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Keowee Unit I is aligned to the Overhead.

Keowee Unit I is to be manually started and tied to the grid.

This is NOT an emergency.

OPIOIAII 106/19, Enclosure 4.3 (KHU-I Manual Startup) is in progress INITIATING CUE The CR SRO directs you to continue with a manual start of Keowee Unit 1, and tie it to the grid with no load, per OP/0/A/1106/19, Enclosure 4.3 beginning at Step 2.1.

CRO-901 fs Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-901 CANDIDATE EXAMINER

CRO-901 fs Page2ofii REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Place the Reactor Building Purge In Operation Alternate Path:

No Facility JPM #:

CR0-i 00 KIA Rating(s):

System: 029 K/A: A2.03 Rating: 2.7/3.1 Task Standard:

RB Purge is placed in operation correctly per the procedure.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OPIIIAI11O2/014 (Rev 042) RB Purge System PTIOIAIO23OIOO1 (Rev 159) Radiation Monitor Check Validation Time: 15 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: I NAME SIGNATURE DATE Comments

CRO-901 fs Page3ofll SIMULATOR OPERATOR INSTRUCTiONS RECALL Snap 201

CRO-901 fs Page4 of 11 Tools!EguipmentIProcedures Needed OPII/A111021014 End. 4.1 PTIOIAIO23OIOO1 (Radiation Monitor Check) End 13.2 (Unit I Process Monitor Setpoints)

Gaseous Release Permit READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit I Plant Conditions:

  • RCS temperature = 104°F
  • RCS pressure = 36 psig
  • No GWD or LWD releases are in progress
  • RBHatchisCLOSED
  • Continuous release is NOT in progress
  • RB Purge startup is in progress using OP/1/A11102/014 (RB Purge System),

Enclosure 4.1 (RB Purge Release)

INITIATING CUE The CR SRO directs you to place the RB Purge in operation at 1/3 Station Limit using OP/i/A/l 102/014, Enclosure 4.1, starting at Step 3.5.

CRO-901 fs Page5ofll S1ART TIME:

STEP 1: Step 3.5 Record Recommended Release Rate: 1.01 E7 cfm.

STANDARD: Record Recommended Release Rate on the procedure. SAT Continue to Step 3.6 COMMENTS:

STEP 2: Step 3.6 Perform the following:

3.6.1 Circle required approval level for release(s), including this one:

All Releases at Station in Progress including this one Approval Level 1/3 Station Limit 1 GWR in progress

-

SRO 1/3 Station Limit 2 GWRs in progress

- OSM 1/3 Station Limit 3 GWRs in progress

- OSM 2/3 Station Limit 1 GWR in progress

- OSM 3.6.2 Document approval for release: SAT Release Approver Date STANDARD: Determine that 1/3 Station Limit 1 GWR in progress applies and the

-

UNSAT required approval level is an SRO.

Continue to Step 3.7 Cue: When asked, state that Dean Porter (OSM) has approved this release.

COMMENTS:

NOTE: During RB purge, vent stack radiation monitors should be operable.

STEP 3: Step 3.7 IF Unit Vent Stack RIA(s) are inoperable, refer to SLC 16.11.3.

SAT STANDARD: Determine that the Unit Vent Stack RIA(s) are NOT inoperable.

Continue to Step 3.8 UNSAT COMMENTS:

CRO-901 fs Page6ofll STEP4: Step 18 - *CRIT1CAL STEP Perform the following:

  • Ensure one of the following:

> 1ARBAUXFANisOff.

> 1BRBAUXFAN1sOff.

  • Ensure TIC Sheet Control Room Tag on 1A RB AUX FAN.
  • Ensure TIC Sheet Control Room Tag on 1 B RB AUX FAN.
  • Ensure note on Turnover sheet: If RB Purge Fan is operating, 1A SAT RB Aux Fan or lB RB Aux Fan should be off.

STANDARD: *Secure the 1A or 1 B RB AUX FAN and place a T/C Sheet Control Room Tag on the 1 A and 1 B RB AUX FAN control room switches. UNSAT Note: Placing tags on the RB Aux Fan switches in NOT critical.

Candidate should state they would place note on Turnover sheet: If RB Purge Fan is operating, 1A RB Aux Fan or lB RB Aux Fan should be off.

Continue to Step 3.9 Cue: If asked as the SRO, inform the candidate that the IA RB Aux Fan should be secured.

COMMENTS:

CRITICAL STEP NOTE: Completion of Step 3.9 establishes an appropriate vent path during Fuel Movement Operations with any Transfer Tube open per the Shutdown Protection Plan. This prevents FTC and SFP level variations caused by differential pressures between RB and SEP.

STEP 5: Step 3.9 and 3.9.1 SAT Perform the following:

  • Open 1 PR-I (RB PURGE OUTLET (RB)).

STANDARD: Open 1 PR-I by rotating the switch located on 1 A83 to open and UNSAT verifying that the red open light illuminates and the green closed light goes out.

Continue to Step 3.9.2 COMMENTS:

CRO-901 fs Page7ofll STEP 6: Step 3.9.2 - CRITICAL STEP Open I PR-2 (RB PURGE OUTLET (PR)).

STANDARD: Open 1PR-2 by rotating the switch located on 1AB3 to open and SAT verifying that the red open light illuminates and the green closed light goes out.

Continue to Step 3.9.3 UNSAT COMMENTS:

STEP 7: Step 3.9.3 Ensure closed 1 PR-3 (RB PURGE FLOW). (Bailey Controller)

STANDARD: Rotate 1 PR-3 controller knob until the position indication indicates zero. SAT Continue to Step 3.9.4 COMMENTS: UNSAT STEP 8: Step 3.9.4 CRITICAL STEP Perform the following:

NOTE: When I PR-3 (RB PURGE OUTLET SWITCH) is positioned to open, 1 PR-3 will remain in the closed position since 1 PR-3 Bailey Controller is closed.

. Position I PR-3 (RB PURGE OUTLET SWITCH) to open. SAT

. Throttle > 60% open 1 PR-3 (RB PURGE FLOW). (Bailey Controller)

STANDARD: Position 1 PR-3 (RB PURGE OUTLET SWITCH) to open on 1VB2.

Rotate knob on the Bailey Controller for I PR-3 until it indicates > 60% UNSAT

open on 1AB3.

Continue to Step 3.10 COMMENTS:

CRO-901 fs Page8ofll STEP 9: Step 3.10 *CRITICAL STEP IE required to operate the RB Purge Fan, perform the following:

3.10.1 Perform one of the following:

A. Perform the following:

  • *Open IPR-5 (RB PURGE INLET (PR))

B. Ensure the following:

  • 1 PR-4 (RB PURGE INLET) valve position interlock jumpered per SAT
  • IPIOIAJOI61/004 (Outage Interlock Bypass For Purge Isolation Valves)
  • 1 PR-5 (RB PURGE INLET (PR)) valve position interlock UNSAT jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
  • I PR-6 (RB PURGE INLET (RB)) valve position interlock jumpered per I P10/NO 161/004 (Outage Interlock Bypass For Purge Isolation Valves)
  • Open RB Equipment Hatch NOTE: Starting/Stopping RB Purge may cause SFP level changes. Entry into AP/1&2/A/1700/35 not required if SFP level changes are evaluated and stabilizes as expected.

3.10.2 *Start RB Purge Fan.

Note: The RB Purge fan has a 20 second delay to allow dampers to operate.

3.10.3 Ensure 1PR-3(RB PURGE FLOW) (Bailey Controller) adjusted to

<recommended release rate.

STANDARD: Open 1PR-4, 5, and 6 by rotating the switches located on 1AB3 to open and verifying that the red open lights are illuminated and the green closed lights go out.

Start RB Purge Fan by placing the switch located on 1AB3 to start and verifying that the red on light illuminates.

Adjust I PR-3 (RB PURGE FLOW) (Bailey Controller) < recommended release rate as read on Chessell Misc. System Recorder I located on 1VB1.

Continue to Step 3.11 COMMENTS:

CRO-901 fs Page 9 of 11 STEP 1O: Step 3.11 -

Perform the following:

  • Record Begin GWR in Unit Log.
  • Record GWR start information on Enclosure 4.2 (RB Purge Sample Request).

STANDARD: Record Begin GWR Unit Log. SAT Record GWR start information on Enclosure 4.2 (RB Purge Sample Request).

UNSAT Cue: Another RO will complete this release.

COMMENTS:

END OF TASK TIME STOP:

CRO-901 fs Page lOofli CRITICAL STEP EXPLANATIONS STEP # Explanation 4 This step is required to prevent tripping 1XR incoming feeder breaker.

5 This step is required to establish RB Purge flow.

6 This step is required to establish RB Purge flow.

8 This step is required to establish desired RB Purge flow.

9 This step is required to start the RB Purge fan.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER yPoN COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 Plant Conditions:

  • RCS temperature = 104°F
  • RCS pressure = 36 psig
  • No GWD or LWD releases are in progress
  • RBHatchisCLOSED
  • Continuous release is NOT in progress
  • RB Purge startup is in progress using OP/I /A/1102/014 (RB Purge System),

Enclosure 4.1 (RB Purge Release)

INITIATING CUE The CR SRO directs you to place the RB Purge in operation at 1/3 Station Limit using OP/I/All 102/014, Enclosure 4.1, starting at Step 3.5.

NLO-427 fs Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE N LO-427 CANDIDATE EXAMINER

NLO-427 fs Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Reset An Emergency Feedwater Pump Turbine Alternate Path:

Yes Facility JPM #:

N LO-027 K/A Rating(s):

System: 061 K/A: A2.04 Rating: 3.4/3.8 Task Standard:

Emergency Feedwater Pump Turbine reset correctly by procedure Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

Rule 3 (Loss of Main or Emergency FDW), rev 38A EOP Enclosure 5.26 (Manual Start of TDEFDWP), rev 38A Validation Time: 8 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: /

NAME SIGNATURE DATE Comments

NLO-427 fs Page 3 of 10 SiMULATOR OPERATOR INSTRUCTIONS NONE

NLO-427 fs Page 4 of 10 ToolslEguipment!Procedures Needed EOP Enclosure 5.26 (Manual Start of TDEFDWP)

READ TO OPERATOR DIRECTIONS TO CANDIDATE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 3 Reactor has tripped from 100% power.

A loss of all 4160V power has occurred.

Unit 3 TD EFDW Pump is tripped.

Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to manually reset Unit 3 TD EFDW Pump.

NLO-427 fs Page 5 of 10 STARTTIME:

STEP 1: Step 1 Verify TDEFDWP trip device tripped.

SAT STANDARD: Candidate determines from the Initial Conditions that Unit 3 TD EFDW pump is tripped.

Cue: If the candidate asks for local indications for Unit 3 TD EFDW pump being UNSAT tripped, in form him/her that the latch block is in the down position, the spring plate is in the down position, and the hand trip lever is in the down position .

COMMENTS:

STEP 2: Step 2 Notify CRC to place TDEFDWP switch in PULL TO LOCK.

SAT STANDARD: Candidate notifies Unit 3 control room using radio/phone to place Unit 3 TD EFDW pump in PULL TO LOCK.

Cue: Indicate to candidate that Unit 3 TD EFDW pump is in PULL TO LOCK. UNSAT COMMENTS:

STEP 3: Step 3 CRITICAL STEP Push reset lever toward turbine shaft until engaged:

STANDARD: Candidate pushes the reset lever towards the turbine shaft to ensure it is engaged. SAT Cue: Indicate to candidate that the reset lever is engaged.

COMMENTS: UNSAT STEP 4: Step 4 CRITICAL STEP Rotate spindle fully clockwise.

SAT STANDARD: Candidate rotates 3M5-94 spindle fully clockwise until it reaches a hard stop.

Cue: Indicate to candidate that the spindle is in its full clockwise position. UNSAT COMMENTS:

NLO-427 fs Page 6 of 10 STEP 5: Step 5 CRITICAL STEP Rotate spindle fully counter-clockwise.

SAT STANDARD: Candidate observes spring plate in its full up position.

Cue: Indicate to candidate that the spindle is in its full counter-clockwise position.

U N SAT COMMENTS:

STEP 6: Step 6 Rotate spindle % turn clockwise.

SAT STANDARD: Candidate rotates spindle 1/4 turn clockwise.

Cue: Indicate to candidate that the spindle is 4 turn from full counterclockwise position. UNSAT COMMENTS:

STEP 7: Step 7 Notify CR0 to place TDEFDWP switch in RUN: SAT STANDARD: Candidate notifies Unit 3 CR0 by phone/radio to place Unit 3 TD EFDW pump switch in RUN:

U N SAT Cue: Indicate to candidate that Unit 3 TD EFDW pump switch is in the RUN position.

COMMENTS:

ALTERNATE PATH STEP 8: Step 8 Verify 3MS-93 (TD EFDWP Steam Supply Trip Valve) closed STANDARD: Candidate locates 3M5-93 and determines the valve is closed. UNSAT Cue: Indicate to candidate using 3MS-93 position indicator that the valve is CLOSED.

COMMENTS:

NLO-427 fs Page 7 of 10 STEP 9: Step 9 CRITICAL STEP Close 3MS-IV-0433 (3MS-SV-0074 Isolation) (T-IIC-49) SAT STANDARD: Candidate locates 3MS-IV-0433 and rotates the handle clockwise until it will not turn.

UNSAT Cue: Indicate to candidate that 3MS-IV-0433 is closed.

COMMENTS:

STEP 10: Step 10 CRITICAL STEP Bleed of instrument air to 3MS-93 SAT (TD EFDWP Steam Supply Trip Valve) by replacing the Swagelok body with the vent port.

STANDARD: Candidate locates Swagelok body and replaces it with the vent port. UNSAT COMMENTS:

STEP 11: Step 11 Verify TDEFDWP running SAT STANDARD: Candidate observes indications such as turbine shaft rotating, discharge pressure, and hydraulic oil pressure to determine that it is operating.

UNSAT Cue: Indicate to candidate that Unit 3 TD EFDW pump is operating.

COMMENTS:

NLO-427 fs Page 8 of 10 STEP1O: Step 12 -

EXIT this enclosure SAT STANDARD: Candidate exits the enclosure Cue: Indicate to candidate that this task is complete. UNSAT COMMENTS:

END TASK TIME STOP:

NLO-427 fs Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 This step is required to reset 3MS-94 4 This step is required to reset 3MS-94 5 This step is required to reset 3MS-94 9 This step is required to open 3MS-93 and start the TD EFDWP.

10 This step is required to open 3MS-93 and start the TD EFDWP.

CANDIDATE CUE SHEET

- (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 3 Reactor has tripped from 100% power.

A loss of all 41 60V power has occurred.

Unit 3 TD EFDW Pump is tripped.

Rule 3 is in progress.

INITIATING CUE Control Room Supervisor directs you to perform EOP Enclosure 5.26 (Manual Start of TDEFDWP) to manually reset Unit 3 TD EFDW Pump.

NLO-710 fs Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-710 CANDIDATE EXAMINER

NLO-710 fs Page2of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Place the Reactor Building Hydrogen Analyzer In Service Alternate Path:

No Facility JPM #:

NLO-010 K/A Rating(s):

System: 028 K/A: A4.03 Rating: 3.1/3.3 Task Standard:

Reactor Building Hydrogen Analyzer is placed in service by procedure within 90 minutes.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

EP/1/A11800/00, (rev 38A) EOP Enclosure 5.2, Placing RB Hydrogen Analyzers in Service Validation Time: 10 minutes Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time Examiner: /

NAME SIGNATURE DATE COMMENTS

NLO-710 fs Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS - -

None

NLO-710 fs Page4of 11 ToolslEquipmentlProcedures Needed .2, Placing RB Hydrogen Analyzers in Service Enclosure of EPIIIAI1800IOOI NOTE: Student is expected to know that this procedure is pre-staged at the Hydrogen Analyzers and be able to locate the procedure. (Not Critical)

READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A LOCA has occurred on Unit 1.

Engineered Safeguards Channels I and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.

The RB Hydrogen Analyzers are aligned in the standby mode.

INITIATING CUES The Control Room SRO directs you to place the RB Hydrogen Analyzers in service on Unit I per EOP Enclosure 5.2 Placing RB Hydrogen Analyzers in Service.

NLO-710 fs Page 5of 11

-

STARTTIME:- - -

NOTE I STEP Hydrogen analyzer (RP) panels are located in A-6-602, Vent Equipment Rm, col Q73 West.

STEP 1: Step 1 At 1A H2 ANALYZER (RP), perform the following:

  • Ensure POWER ON light is on.
  • Position H2 DUAL RANGE SW to H2 0 -10% Range. SAT
  • Position FUNCTION SELECTOR switch to SAMPLE.
  • Depress the OFF button for the following: UNSAT 1 PR-83 (BYP TO POST AC 1 SV220) 1PR-86(BYPTO POST AC 1SV221)

STANDARD: Red Power On light on remote panel is verified to be ON at the Remote RB Hydrogen Analyzer Panel (Train A).

Cue: Red power on light is illuminated.

H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the 0-10% scale.

Cue: Point to the H2 Dual Range switch 0-10% position and state switch is in this position.

  • FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the SAMPLE position.

Cue: Point to the Function Selector Switch Sample position and state switch is in this position.

At the remote panel, the OFF button is pushed for the following valves:

Train A

  • PR-83 (Bypass to Post Accident Sample Panel)
  • PR-86 (Bypass from Post Accident Sample Panel)

Cue: PR-83 and PR-86 indicate off.

COMMENTS:

NLO-710 fs Page6of 11 STEP2:. Step-Z -

At 1 B H2 ANALYZER (RP), perform the *CRITICAL STEP following:

  • Ensure POWER ON light is on.
  • Position H2 DUAL RANGE SW to H2 0 -10% Range.
  • Position FUNCTION SELECTOR switch to SAMPLE.
  • Depress the OFF button for the following:

1 PR-89 (BYP TO POST AC 1 SV222)

SAT 1 PR-92 (BYP TO POST AC 1 5V223)

STANDARD: Red Power On light on remote panel is verified to be ON at the UNSAT Remote RB Hydrogen Analyzer Panel (Train A).

Cue: Red power on light is illuminated.

H2 DUAL RANGE Sw. on the Remote Panel is verified to be positioned to the 0-10% scale.

Cue: Point to the H2 Dual Range switch 0-10% position and state switch is in this position.

  • FUNCTION SELECTOR SWITCH on the Remote Panel is verified to be positioned in the SAMPLE position.

Cue: Point to the Function Selector Switch Sample position and state switch is in this position.

At the remote panel, the OFF button is pushed for the following valves:

  • PR-89 (Bypass to Post Accident Sample Panel)
  • PR-92 (Bypass from Post Accident Sample Panel)

Cue: PR-89 and PR-92 indicate off COMMENTS:

STEP 3: Step 3 CRITICAL STEP Notify Control Room to perform the following:

  • Open 1 PR-87 and 1 PR-90 STANDARD: Unit iControl Room personnel are notified to open 1PR-81 & IPR-84 and 1 PR-87 & 1 PR-90 to align the Reactor Building Hydrogen Analyzer SAT to the Reactor Building.

Cue: After notification has been made, indicate to student that the red OPEN indication lights for IPR-81 & IPR-84 and IPR-87 & IPR-90 located at the UNSAT Remote Panel, are ON.

COMMENTS:

NLO-710 fs Page 7 of 11 NOTE CRITICAL STEP When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in 3 minutes.

STEP 4: Step 4 SAT At 1A H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-71 (TOP OF CONTAINMENT SAMPLE).

UNSAT

  • Position OFF / STANDBY / ANALYZE switch to ANALYZE.
  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.

STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

  • PR-71 (Top of Containment Sample) for Train A Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-71 position.
  • OFF/STANDBY/ANALYZE switch is positioned to the ANALYZE Mode.

Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed.

Cue: Control is from the remote panel.

TIME COMPRESSION Cue: Inform candidate that approximately three minutes has elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:

NLO-710 fs Page 8 of 11 NOTE CRITICAL STEP When ANALYZE is selected, the indication will go up scale, possibly causing a HIGH HYDROGEN ALARM in the Analyzer Panel, the Remote Panel, and the Control Room. It should return down scale to the correct reading in 3 minutes.

STEP 5: Step 5 SAT At I B H2 ANALYZER (RP), perform the following:

  • Position SAMPLE VALVE SEL SW to PR-76 (TOP OF CONTAINMENT SAMPLE).

UNSAT

  • Position OFF I STANDBY I ANALYZE switch to ANALYZE.
  • Depress REMOTE SELECTOR pushbutton to ensure control is from the Remote Panel.

STANDARD: SAMPLE VALVE SEL. Sw. is positioned to appropriate sample valve:

  • PR-76 (Top of Containment Sample) for Train B Cue: Point to the Sample Valve Selector Switch and state switch is in the PR-76 position.
  • OFF/STANDBY/ANALYZE switch is positioned to the ANALYZE Mode.

Cue: Point to the Off/Standby/Analyze Switch is in Analyze position.

The Hydrogen Concentration Meter reads approximately 3% hydrogen and the Yellow COMMON ALARM Light and Yellow HIGH HYDROGEN ALARM Lights are ON.

  • REMOTE SELECTOR Pushbutton is depressed.

Cue: Control is from the remote panel.

TIME COMPRESSION Cue: Inform candidate that approximately three minutes has elapsed and point to the Hydrogen Concentration Meter indicating 0% hydrogen concentration COMMENTS:

NLO-710 fs Page9of 11 STEP 6:. -- Step 6 -

IAAT either RB Hydrogen Analyzer Train indicates <2.25% Hydrogen, AND the meter reading stabilizes, THEN push the ALARM RESET pushbutton to reset the COMMON ALARM on appropriate train.

SAT 1A RB Hydrogen Analyzer Train 1 B RB Hydrogen Analyzer Train STANDARD: ALARM RESET Pushbutton is depressed. UNSAT Cue: If the candidate asks, indicate that the Hydrogen reading is 0 percent on both hydrogen meters.

Cue: Indicate to student that the Yellow Alarm Lights are out after the ALARM RESET Pushbutton is depressed.

COMMENTS:

STEP 7: Step 7 WHEN HIGH HYDROGEN alarm has been reset on both lAand lB RB Hydrogen Analyzer Trains, THEN notify Unit 1 Control Room that both 1A and lB Hydrogen SAT Analyzer Trains are in service.

STANDARD: Phone/radio is located and control room personnel are notified that the RB Hydrogen Analyzers are in service. UNSAT Cue: Control room acknowledges IA and lB Hydrogen Analyzers are in service.

COMMENTS:

STEP 6: Step 8 EXIT this enclosure.

SAT STANDARD: Procedure is exited.

COMMENTS:

UNSAT END TASK STOP TIME:

NLO-710 fs Page lOofil CRITICAL STEP EXPLANATIONS STEP # Explanation 1 The 3-position switch must be selected to sample.

2 Open the block valves to the hydrogen analyzer.

3 Start the Analyzer pump and the sampling process

CANDIDATECUSHET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS A LOCA has occurred on Unit I.

Engineered Safeguards Channels I and 2 have actuated. .1 (ES Actuation) of the EOP is being completed.

The RB Hydrogen Analyzers are aligned in the standby mode.

INITIATING CUES The Control Room SRO directs you to place the RB Hydrogen Analyzers in service on Unit I per EOP Enclosure 5.2 Placing RB Hydrogen Analyzers in Service.

NLO-604 fs Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-604 CANDIDATE EXAMINER

________________

_____________

________

NLO-604 fs Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Restore chiller operation following a loss of power Alternate Path:

No Facility JPM #:

New KIA Rating(s):

System: 056 K/A: AA1.08 Rating: 2.5*/2.5 Task Standard:

The B chiller started per AP/1 1 (Recovery from Loss of Power)

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

AP/1 1 (Recovery from Loss of Power) End 5.2 (Restoring Loads Outside the Control Room)

Validation Time: 15 mm. Time Critical: No Candidate: Time Start:

NAME Time Finish:

Performance Rating: SAT UNSAT Performance Time:

Examiner: I NAME SIGNATURE DATE Comments

NLO-604 fs Page 3 of 10 SiMULATOR OPERATOR INSTRUCTIONS NONE

NLO-604 fs Page 4 of 10 ToolslEguipmentlVrocedures Needed -

AP/1 1 (Recovery from Loss of Power) End 5.2 (Restoring Loads Outside the Control Room)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS A Loss of Offsite power has occurred.

Power has been restored from Keowee APIIII700/O1 I (Recovery from Loss of Power) has been initiated and End 5.2 (Restoring Loads Outside the Control Room) is in progress.

INITIATING CUE The SRO directs you to continue with End 5.2 beginning at Step 27.

NLO-604 fs Page 5 of 10 STARTTIME:

STEP 1: Step 27 Rack in breaker 2TE-13 (B CHILLER MOTOR) (T-3/between K31 and SAT L31).

STANDARD:- Locate 2TE-13 (B CHILLER MOTOR) and determine the breaker is UNSAT racked in.

Cue: Indicate that the breaker is racked in.

COMMENTS:

STEP 2: Step 28 Close (T-3/J29). SAT STANDARD: Locate 2KB-27 (B CHILLER CONTROL PANEL).

UN SAT Note: Do not allow candidate to open this electrical panel.

Cue: When the panel is located, indicate that the breaker is closed.

COMMENTS:

STEP 3: Step 29 CRITICAL STEP Open the following valves (T-IIK-32):

SAT

  • WC-9 (B Evaporator Inlet)
  • WC-1 1 (B Evaporator Outlet)

UNSAT STANDARD: Candidate rotates WC-9 and WC-1 1 handwheels in the counter clockwise direction.

Cue: WC-9 and WC-11 hand wheels are at the fully counter-clockwise position COMM ENTS:

NLO-604 fs Page 6 of 10 STEP 4: Step 30 Close the following breakers: SAT

  • 2XE-F4B (B CHILLED WATER PUMP MOTOR BKR) (T-1/between J28 and H29)

UNSAT

  • 2XF-1C (B CHILLER CONDENSER WATER PUMP BKR)(T-11M30)

STANDARD: Candidate locates the above breakers and determines that they are closed.

Cue: When the candidate locates the above breakers, indicate that they are in the closed position.

COMMENTS:

STEP 5: Step 31 Ensure B CHILLED WATER PUMP CONTROL SW in AUTO. (Located SAT on panel WCPL-ACCPB at T-1, 8 S of K31)

STANDARD: Candidate locates and recognizes the B CHILLED WATER PUMP UNSAT CONTROL SW is in the AUTO position Cue: Point to the B CHILLED WATER PUMP CONTROL SW auto position and state to the candidate the switch is in this position COMMENTS:

STEP 6: Step 32 CRITICAL STEP Close WC-7 (A/B Chilled Water Pump Cross Connect Discharge) (T1IJ-33 W). A Chiller. SAT STANDARD: Candidate rotates WC-7 handwheel in the clockwise direction (valve should already be closed). UNSAT Cue: WC-7 handwheei is in the fully clockwise position COMMENTS:

STEP 7: Step 33 Verify LPSW-135 (Chillers Condenser Supply) closed (T-1IK-34, 6 N).

STANDARD: Candidate locates and recognizes that LPSW-135 is closed.

SAT Cue: Indicate LPSW-135 is closed.

COMMENTS: UNSAT

NLO-604 fs Page 7 of 10 STEP 8: tep34 - -

Verify the following for the B Chiller:

  • Oil level visible in either of the upper sight glasses located at the north SAT end of the separator
  • Evaporator refrigerant pressure is 75 - 200 psig UNSAT
  • Condenser refrigerant pressure is 75 - 200 psig.

STANDARD: Candidate determines oil level visible in either of the upper sight glasses located at the north end of the separator.

Candidate simulates using the key pad on the compressor control panel (2 pushbutton from the top on the left side of the control panel labeled Refrigerant Pressures) to display refrigerant pressures and ensures Evaporator refrigerant pressure is 75 200 psig and Condenser

-

refrigerant pressure is 75 200 psig.

Note: DO NOT ALLOW the candidate to depress any of the pushbuttons on the compressor control panel. Inform the candidate to describe how helshe would monitor refrigerant pressures and then provide the cue below.

Cue: Provide Candidate with the following values:

  • Oil level is visible in the upper sight glass located at the north end of the separator
  • Evaporator refrigerant pressure is 140 psig
  • Condenser refrigerant pressure is 140 psig COMMENTS:

STEP 9: Step 35 CRITICAL STEP Press the STOP/RESET side of the B Chiller COMPRESSOR switch.

SAT STANDARD: Candidate presses STOP/RESET push button.

Cue: The STOP/RESET pushbutton is pressed UNSAT COMMENTS:

STEP 10: Step 36 CRITICAL STEP Press the START side of the B Chiller COMPRESSOR switch. SAT STANDARD: Candidate presses START push button.

- UNSAT Cue: B chiller display indicates Start Sequence lnitiated COMMENTS:

NLO-604 fs Page 8 of 10 TIME COMPRESSION: Inform the candidate that 30 seconds has elapsed STEP 11: Step37 SAT WHEN 30 seconds have passed, THEN verify the following:

Compressor started Chiller Service Water Pump started UNSAT Control Center Display indicates one of the following:

  • SYSTEM RUN- CURRENT LIMIT IN EFFECT
  • SYSTEM RUN- LEAVING TEMP. CONTROL STANDARD: Candidate verifies Compressor and chiller Service Water pumps running.

Candidate verifies Control Center Display.

Cue: B Chiller Compressor is running B Chiller Service Water Pump started Control Center Display indicates SYSTEM RUN Leaving Temp Control Note: The identification label for the Chiller Service Water Pump actually states Chiller Condenser Service Water Pump. If the candidate questions this and simulates contacting an SRO, inform himlher that the SRO confirms a soft match (or confirms this is the correct component).

Cue: Another operator will continue this task.

COMMENTS:

END TASK TIME STOP:

NLO-604 fs Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 3 This step is critical to properly align chiller for operation.

6 This step is critical to properly align chiller for operation.

9 This step is critical to start the B chiller 10 This step is critical to start the B chiller

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS A Loss of Offsite power has occurred.

Power has been restored from Keowee AP/1/1700/O11 (Recovery from Loss of Power) has been initiated and End 5.2 (Restoring Loads Outside the Control Room) is in progress.

INITIATING CUE The SRO directs you to continue with End 5.2 beginning at Step 27.