Proposed Tech Spec 3.16 Re Secondary Water Chemistry
ML19320A211
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/28/1976
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A205 List:
References
NUDOCS 8004210513
Download: ML19320A211 (3)


Text

-

-- ~ ~.

.,

... -.

,

3.16 Secondary Water Chemistry DhhM Applicability A D

'T R Objective b U d d)

To maintain steam generator feedwater chemistry within values without potential for degradation of steam generator tube walls.

Specification 3.16.1 The reactor shall not be taken or maintained above hot shutdown con-ditions unless the total cation conductivity limits of Table 3.16-1 are met except as provided below.

3.16.2 If the total cation conductivity of the steam generator feedwater is found to exceed the Steady State Limit of Table 3.16-1 but is within the Transient Limit of Table 3.16-1, it shall be verified at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the pH and maximum total solids in the steam generator feedwater are within the limits of Table 3.16-1 and the conductivity shall be restored to within its Steady State Limit within 7 days; or the reactor shall be placed in the hot shutdown condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.16.3 If, during the conditions described in 3.16.1 requiring surveillance of steam generator feedwater pH and/or maximum total dissolved solids, said pH and/or maximum total dissolved solids are found to exceed the limits of Table 3.16-1 they shall be restored within the limits of ,

Tabic 3.16-1 within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the reactor shall be placed in the hot shutdown condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.16.4 If the total cation conductivity of the steam generator feedwater

.

is found to exceed the Transient Limit of Table 3.16-1 it shall be restored to within the Transient Limit of Table 3.16-1 within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the reactor shall be placed in the hot shutdown con-dition within 12 ho'urs. -

  • 3.16.5 No report per specification 6.12.3.2 will be required unless the above requirements necessitate placing the reactor in the hot shutdown condition.

.

Bases Msintaining the steam generator feedwater within the limits of this specifi-cation will control the introduction of potentially corrosive impurities into the steam generators and minimize tube degradation.

80()42,10 s

. - _ . . . . . . ~ - . . . . , . . - . - . . . _ . _ . . . -,._ . . . - . - - - - . . - ~ . . . . . . _ . . . . . . _ . -_.- ,

c ,

,

< 2

' - -

-

,

c,.-3 ;

-

.

.:..

.

t, m' 'd

'

y J

, ,'. .

. TABLE 3.16-1 '

  • .

. Steam Generatorfmedwater Chemistry Limits - .

4

- tiaximum Total ~

Total Cation ConductivityL Solids .' . "I umhos/cm2 0 250 C: pil 0 250C ppb-Steady State .

Transient

,

Liuits- - Limits Limits Limits ,

<0.5.  ;<1.0* 8. 5< . pil<9. 5 <50**

  • I

-

.

t

..

  • lay be increased to -2. 0 for the first 8' hours ' during'startup from llot Shutdown.

l

    • ilay be increased to .100 for the first '8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during startup from llot Shutdown.

~

.

.

4 1 '

4

- 1,

..

.

.

I; i

7 -t

>14's

-

.;

1 ....

1 I

"

p.

  • *

.o. ,

s - p - . ~ ,

_ _ . . - - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _

, . _ _- . . ._ - _ ~ _ . ~ .- . .

, - . * . <

. .s .

4.18 Secondary Water Chemistry Surveillance

]

I g .icability Ap,slies to-the surveillance of steam generator feedwater chemistry.

pajective To verify that ' secondary water chemistry is within the limits of specifi-cation 3.16.

Specification At ,least 5 times per week determine that steam generator feedwater chemistry is within the total cation conductivity limits of specification 3.16, Table 3.16-1.

Bases This monitoring provides reiasonable assurance that the potential for undue steam generator tube degrajation has been minimized.

.