MONTHYEARMNS-18-044, Independent Spent Fuel Storage Installation (Isfsi), Submittal of 10 CFR 72.48 Summary Report from September 15, 2016 to July 26, 2018, No Changes, Tests, or Experiments2018-07-26026 July 2018 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 10 CFR 72.48 Summary Report from September 15, 2016 to July 26, 2018, No Changes, Tests, or Experiments MNS-18-036, Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles2018-07-0303 July 2018 Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles MNS-18-042, Independent Spent Fuel Storage Installation (ISFSI)2018-06-28028 June 2018 Independent Spent Fuel Storage Installation (ISFSI) MNS-18-040, Submittal of Information Related to Pressurizer Surge and Spray Nozzle Thermal Sleeves Attachment Welds for License Renewal2018-06-26026 June 2018 Submittal of Information Related to Pressurizer Surge and Spray Nozzle Thermal Sleeves Attachment Welds for License Renewal MNS-18-039, Independent Spent Fuel Storage Installation (ISFSI)2018-06-19019 June 2018 Independent Spent Fuel Storage Installation (ISFSI) MNS-18-001, Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable2018-05-31031 May 2018 Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable MNS-18-030, 2017 Annual Radiological Environmental Operating Report2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report MNS-18-029, Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-A2018-05-0909 May 2018 Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-A MNS-18-029, McGuire Nuclear Station, Units 1 and 2 - Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-2018-05-0909 May 2018 McGuire Nuclear Station, Units 1 and 2 - Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-A MNS-18-028, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report MNS-18-017, Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-02-26026 February 2018 Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs MNS-18-018, McGuire, Units 1 & 2, Submittal of Emergency Plan Implementing Procedure Changes2018-02-22022 February 2018 McGuire, Units 1 & 2, Submittal of Emergency Plan Implementing Procedure Changes MNS-18-009, McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 18-12018-01-31031 January 2018 McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 MNS-18-003, End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports2018-01-11011 January 2018 End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports MNS-17-050, Review Request for the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A2017-12-13013 December 2017 Review Request for the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A MNS-17-048, Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-12-12012 December 2017 Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-17-026, Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles2017-12-0808 December 2017 Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles MNS-17-042, McGuire Nuclear Station, Unit 1, Submittal of Cycle 26, Revision 0, Core Operating Limits Report2017-10-0909 October 2017 McGuire Nuclear Station, Unit 1, Submittal of Cycle 26, Revision 0, Core Operating Limits Report MNS-17-040, (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force ..2017-09-27027 September 2017 (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force .. MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate2017-09-25025 September 2017 Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate MNS-17-039, McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 17-12017-09-19019 September 2017 McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 17-1 MNS-17-031, License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition2017-09-14014 September 2017 License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition MNS-17-037, Submittal of Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments During the Period from January 1, 2016 to March 31, 20172017-08-10010 August 2017 Submittal of Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments During the Period from January 1, 2016 to March 31, 2017 MNS-17-033, Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval2017-08-0202 August 2017 Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval MNS-17-034, 16C4435-RPT-002, Rev. 1, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for McGuire Nuclear Station.2017-07-24024 July 2017 16C4435-RPT-002, Rev. 1, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for McGuire Nuclear Station. MNS-17-030, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-06-28028 June 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal MNS-17-023, Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-05-25025 May 2017 Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-17-016, Nuclear Regulatory Commission (NRC) Annual Commitment Change Report2017-05-18018 May 2017 Nuclear Regulatory Commission (NRC) Annual Commitment Change Report MNS-17-020, Transmittal of McGuire, Units 1 and 2, 2016 Annual Radiological Environmental Operating Report2017-05-0505 May 2017 Transmittal of McGuire, Units 1 and 2, 2016 Annual Radiological Environmental Operating Report MNS-17-019, McGuire Nuclear Station, Units 1 and 2 - Submittal of Annual Radioactive Effluent Release Report2017-04-28028 April 2017 McGuire Nuclear Station, Units 1 and 2 - Submittal of Annual Radioactive Effluent Release Report MNS-17-008, Letter of Intent to Submit Plant-Specific Reactor Vessel Internals Inspection Plans2017-02-23023 February 2017 Letter of Intent to Submit Plant-Specific Reactor Vessel Internals Inspection Plans MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-16-091, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity.2016-12-0808 December 2016 License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity. MNS-16-086, Emergency Plan, Revision 16-42016-12-0707 December 2016 Emergency Plan, Revision 16-4 MNS-16-078, Written Notification Joslyn Clark Overload Heater Element Part No. 24552016-10-19019 October 2016 Written Notification Joslyn Clark Overload Heater Element Part No. 2455 MNS-16-077, Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program2016-09-29029 September 2016 Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program MNS-16-070, Response to Request for Additional Information to Relief Request 16-MN-0032016-08-18018 August 2016 Response to Request for Additional Information to Relief Request 16-MN-003 MNS-16-060, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-18018 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident MNS-16-062, Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping2016-08-10010 August 2016 Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping MNS-16-046, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity2016-06-30030 June 2016 License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity MNS-16-056, License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information2016-06-30030 June 2016 License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information MNS-16-053, Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping2016-06-23023 June 2016 Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping MNS-16-052, Supplement to License Amendment Request for the Removal of Superseded Technical Specification Requirements, Dated May 5, 2016, TAC Nos. MF7682 and MF76832016-06-16016 June 2016 Supplement to License Amendment Request for the Removal of Superseded Technical Specification Requirements, Dated May 5, 2016, TAC Nos. MF7682 and MF7683 MNS-16-042, Withdrawal of Relief Request Serial No. 15-MN-0022016-05-17017 May 2016 Withdrawal of Relief Request Serial No. 15-MN-002 MNS-16-020, License Amendment Request Removal of Superseded Technical Specification Requirements2016-05-0505 May 2016 License Amendment Request Removal of Superseded Technical Specification Requirements MNS-16-041, Supplement to Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051..2016-05-0505 May 2016 Supplement to Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051.. MNS-16-036, Relief Request 16-MN-001, Limited Weld Examinations2016-04-28028 April 2016 Relief Request 16-MN-001, Limited Weld Examinations MNS-16-039, Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program2016-04-26026 April 2016 Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program MNS-16-026, Transmittal of Updated Final Safety Analysis Report, Revision 192016-04-0505 April 2016 Transmittal of Updated Final Safety Analysis Report, Revision 19 MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. 2018-07-03
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report2023-03-16016 March 2023 Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds2023-02-28028 February 2023 Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)2023-02-15015 February 2023 End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2022-04-0707 April 2022 Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-21-0259, Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-10-0404 October 2021 Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-21-0017, Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage2021-01-29029 January 2021 Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage RA-20-0087, Response to Request for Additional Information Regarding Request for Alternative in Accordance with 10CFR 50.55a(z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period2020-04-0202 April 2020 Response to Request for Additional Information Regarding Request for Alternative in Accordance with 10CFR 50.55a(z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period RA-19-0189, Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.12019-04-0808 April 2019 Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 22019-03-0707 March 2019 Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-19-0005, Response to NRC Request for Additional Information Regarding Review Request of the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A2019-01-30030 January 2019 Response to NRC Request for Additional Information Regarding Review Request of the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A RA-18-0229, Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.12018-12-0303 December 2018 Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.1 RA-18-0213, Response to the Second Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado-Generated Missiles2018-11-0101 November 2018 Response to the Second Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado-Generated Missiles ML18191A5642018-07-10010 July 2018 Attachment 3 - Response to NRC Request for Additional Information MNS-18-036, Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles2018-07-0303 July 2018 Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles ML20052D9362018-07-0303 July 2018 Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density MNS-17-048, Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-12-12012 December 2017 Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17349A1572017-12-12012 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications to Address the 'A' Train Nuclear Service Water System Non-Conforming Condition RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)2017-08-0909 August 2017 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.2017-07-20020 July 2017 Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. MNS-17-030, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-06-28028 June 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal RA-17-0030, Response to Request for Additional Information Regarding Application to Reverse Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2017-06-0808 June 2017 Response to Request for Additional Information Regarding Application to Reverse Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers MNS-17-023, Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-05-25025 May 2017 Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..2016-10-20020 October 2016 Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. ML16294A2542016-10-13013 October 2016 Response to Request for Additional Information Regarding Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation2016-10-0303 October 2016 Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation ML16244A0602016-08-18018 August 2016 Response to Request for Addition Information to RR 16-MN-003 MNS-16-070, Response to Request for Additional Information to Relief Request 16-MN-0032016-08-18018 August 2016 Response to Request for Additional Information to Relief Request 16-MN-003 MNS-16-060, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-18018 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16230A0062016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Technical Specification 3.6.13, Ice Condenser Doors RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-07-14014 July 2016 Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations MNS-16-056, License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information2016-06-30030 June 2016 License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information MNS-16-023, Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request for Control Room Chilled Water System Technical Specifications2016-03-16016 March 2016 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request for Control Room Chilled Water System Technical Specifications ML16056A2422016-02-18018 February 2016 Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Change the Emergency Plan to Upgrade Emergency Action Levels Based on NEI 99-01, Revision 6 MNS-16-005, Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension2016-02-10010 February 2016 Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension MNS-16-008, Expedited Seismic Evaluation Process (ESEP) Closeout, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-0404 February 2016 Expedited Seismic Evaluation Process (ESEP) Closeout, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. MNS-16-009, Response to NRC Letter Dated December 9, 2015, Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c)2016-02-0404 February 2016 Response to NRC Letter Dated December 9, 2015, Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c) RA-16-0006, Response to NRC Request for Additional Information (RAI) Regarding Application to Use Alternate Fission Gas Gap Release Fractions2016-02-0101 February 2016 Response to NRC Request for Additional Information (RAI) Regarding Application to Use Alternate Fission Gas Gap Release Fractions MNS-16-003, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation2016-01-0707 January 2016 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation ML15343A0122015-12-0707 December 2015 Response to NRC Letter Dated 10/26/2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension. MNS-15-093, Response to Request for Additional Information Regarding License Amendment Request Regarding Residual Heat Removal System2015-11-13013 November 2015 Response to Request for Additional Information Regarding License Amendment Request Regarding Residual Heat Removal System MNS-15-078, Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension2015-10-0808 October 2015 Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension MNS-15-077, Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2015-10-0808 October 2015 Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. 2023-07-07
[Table view] |
Text
(-..DUKE Serial No: MNS-16-070 August 18, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control DE!sk Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke Energy) McGuire Nuclear Station, Unit 1 Docket No. 50-369 Relief Request 16-MN-003 Response to Request for Additional Information Steven D. Capps Vice President McGuire Nuclear Station Duke Energy MGOl VP I 12700 Hagers Ferry Road Huntersville, NC 28078 O: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 50.55a By letter dated August 10, 2016, Duke Energy submitted the subject Relief Request to the U.S. Nuclear Regulatory Commission (NRG) for approval of an alternative to defect removal prior to performing temporary repair activities on three-inch-diameter Nuclear Service Water System piping associated with the 1 B Diesel Generator Cooling Water Heat.Exchanger.
By electronic mail dated August 15, 2016, the NRC requested additional information.
The enclosed document provides the requested information.
Attachment 1 of Enclosure 1 contains copyright material.
Duke Energy requests that this attachment be withheld from public disclosure.
If you have any questions or require additional information, please contact P.T. Vu of Regulatory Affairs at (980) 875-4302.
Sincerely, Enclosure U.S. Nuclear Regulatory Commission August18,2016 Page 2 xc: C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G. E. Miller, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 V. Sreenivas, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station ENCLOSURE 1 RR 16-MN-003 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION Enclosure 1 By letter dated August 10, 2016 2016 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML16224A806), Duke Energy (the licensee) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, IWA-4420, at McGuire Nuclear Station Unit 1. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(2), the licensee requested to use the alternative in Relief Request 16-MN-003 on the basis that compliance with the specified ASME requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Relief Request 16-MN-003 provides an alternative for the temporary repair of three-inch diameter nuclear service water system piping associated with the1 B Diesel Generator Cooling Water Heat Exchanger.
To complete its review, the Nuclear Regulatory Commission (NRC) staff requests the following additional information.
REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 16-MN-003 ALTERNATIVE REPAIR FOR NUCLEAR SERVICE WATER SYSTEM PIPING: Question 1: Paragraph 4.1 of the relief request mentioned a corrosion rate of 0.001 inches per day in the vicinity of valve 1 RN-884. Discuss the corrosion rate that was used in the design of the sleeve. Discuss the sleeve thickness.
Demonstrate that the sleeve, considering the designed corrosion rate, will provide structural integrity and leak tightness to the affected piping until the next refueling outage. Response:
The sleeve nominal thickness is 0.226 inches. The corrosion rate in the vicinity of 1 RN-884 was originally identified at 0.001 inches per day based on initial UT data sets. Subsequent inspections are being performed twice weekly and have thoroughly inspected the pipe component repeatedly over a time span comparable to the first time span (when the apparent accelerated corrosion rate was observed).
These subsequent inspections show the corrosion rate has leveled out such that there is currently no discernable corrosion rate within the limits of detection.
Through continued inspections, the actual condition of the pipe is believed to have been more accurately established and the corrosion rate to not be as severe as indicated by initial UT inspection data. Based on the worst case of these current readings, the calculated pitting rate of corrosion is 0.007 inches per year and the general rate of corrosion is 0.005 inches per year. This rate is commensurate with other raw water galvanic corrosion rates in the Service Water Corrosion database.
Based on this more accurate rate of corrosion and applying a multiplier of 4 shows the sleeve will be adequate until the next refueling outage. A sealant is to be injected into the sleeve after leak testing. The sealant is expected to prevent contact between any fluid in the process pipe and the sleeve. This will at least slow, if not completely prevent, any corrosion of the sleeve during its expected service life. Frequent visual and UT inspections will also ensure any unexpected corrosion is discovered and monitored appropriately.
Although the rate of corrosion is not as severe as originally identified, Duke Energy believes the wall thickness margin is at risk and that it is prudent to perform these temporary repairs at the earliest opportunity.
Page 1of5 Enclosure 1 Question 2: Paragraph 4.2 of the relief request discusses the extent of condition inspection of the nuclear service water piping. It appears that the licensee only examined the vicinity of valve 1 RN-883 in addition to valve 1 RN-884. Discuss whether all locations of the nuclear service water piping that are potentially susceptible to corrosion have been examined.
Response:
The number of extent of condition inspections performed was bounded by the requirements of Code Case N-513-3 with a total of 9 locations inspected specifically for this event. Valve 1 RN-883 was identified during the first extent of condition locations which prompted a second set of extent of condition inspections as required by Code Case N-513-3. These extent of condition locations focused on but were not limited to the Emergency Diesel Generator Cooling Water for both units. Inspection of locations that might experience galvanic corrosion is a license renewal commitment and has been underway at MNS. Not all locations have been identified or inspected to date. However, the Service Water Program database currently has over 491 corrosion inspection locations on the various raw water systems at MNS, with approximately 136 of those locations being related specifically to galvanic corrosion.
Although galvanic corrosion has been observed at some of these locations, all inspected locations are within code allowable stress values. This sample size is believed to be a reasonable representation of the Nuclear Service Water system's current behavior relative to galvanic corrosion.
Question 3: Paragraph 5.1 of the relief request states that in lieu of the requirement of IWA-4400 to remove the defective portion of the component prior to performing repair/replacement activities by welding, Code Case N-786-2 will be utilized as an alternative, utilizing the "Type B" sleeve design. The NRC has not approved Code Case N-786-2 which does not appear in the NRC regulation. (a) The licensee needs to include the code case in its entirety as an attachment to the relief request. Alternatively, the licensee could attach the code case in its entirety in the response to this question. (b) The NRC staff notes that the relief request proposes exceptions and modifications to Section 3, but not other sections of the code case. For example, the NRC staff notes that the relief request did not take exception to paragraph 1 (f) of the code case which prohibits the use of the code case on valves even though the proposed sleeve repair will involve welding on the valve body. For each paragraph of the code case, provide disposition in a table format to show that (1) the proposed alternative will follow the requirements of the paragraph in the code case, (2) the proposed alternative will take exceptions and propose modification to the paragraph in the code case, or (3) the paragraph of the code case is not applicable to the proposed alternative.
Response: (a) As requested, Code Case N-786-2 is provided in Attachment 1 to this letter. Page 2 of 5 Enclosure 1 (b) A grid is provided below for each paragraph of the code case, providing disposition in a table format. Code Case N-The proposed The proposed The paragraph 786-2 alternative will alternative will of the code Section follow the take exceptions case is not requirements of and propose applicable to the paragraph modification to the proposed in the code the paragraph alternative.
case in the code case 1 (a)-( e) x 1 (f) x See Note 1 2(a) -2(c) x 3.1 (a) x 3.1(b)(1) x 3.1 (b)(2) x 3.2(a)-(b) x 3.2(c) x See Note 2 3.2(d)-(g) x 3.2(h) x 3.2(i)-(k) x 3.2(1) x 3.2(m) x 3.2(n)-(o) x* 3.2(p) x 3.3 x 3.4(a)-(b) x 3.4(c)-(d) x 3.4(e) x See Note 3 3.4(f) x 4(a)-( c) x 5(a)-(h) x 6(a) x 6(b) x 6(c) x 6(d)-(e) x See Note 4 7 x 8(a)-(f) x See Note 5 Note 1: Duke's interpretation of Section 1 (f) is that sleeves are not to be applied specifically around the components (e.g. valves) listed that might be experiencing wall thinning.
The thinning is not occurring on the valve and is occurring in the pipe. The sleeve will repair the pipe and only extends onto the valve body to the extent possible to create a fully qualified structural weld. The new sleeve is a full structural Page 3 of 5 Enclosure 1 replacement of the thinned pipe, not as a repair to the valve. The piping of concern is a short cantilevered configuration, and as such, has very low stress levels for all design loadings (i.e., gravity, thermal expansion, and seismic).
There are no vibrational issues associated with this piping, and the relatively low design pressure (135 psig) results in very low pressure stresses.
Analysis has demonstrated the pipe stresses to be low in this area and the sleeve to be structurally adequate as designed and shown in Attachment 2 of this submittal.
Note 2: As discussed in 5.1.18.1 of the original submittal, there is insufficient space between the header pipe and the valve(s) to meet the minimum code case length requirement of 4 inches. The length provided by the proposed alternative, as shown in Attachment 2 of this submittal, is acceptable since the sleeve and piping analyses have been reviewed with stresses being significantly below required maximum allowable values. Note 3: As noted in sections 5.1.18.2, 5.1.18.3, 5.1.18.4 of the initial submittal, the proposed alternative utilizes fillet welds in lieu of partial penetration welds at both ends of the sleeve. The rationale for this exception is noted in those sections of the initial submittal.
Note 4: Longitudinal welds will be visually and ultrasonically examined.
Fillet welds will be visually inspected and examined with the liquid penetrant method. Note 5: In lieu of the preservice examination and inservice examinations specified in Section 8, McGuire proposes to perform the non-destructive examinations (visual, surface, and ultrasonic examinations) with frequencies as specified in this relief request. The sleeve will have a baseline UT inspection for thickness monitoring.
No additional inservice examinations are proposed, since the temporary repairs shall be removed during the next refueling outage. Question 4: Paragraph 5.1.12 of the relief request states that a coupling will be shop welded to one side of the sleeve to allow for purging of any weld gasses and leak testing in accordance with IWA-4540.
Attachment 3 of the relief request does not show the coupling.
Provide a drawing or sketch of the coupling with respect to the sleeve. Response:
See Attachment 2 of this letter for a sketch of the coupling with respect to the sleeve. This sketch should be used in lieu of Attachment 3 of the initial submittal.
Note that one coupling is to be installed to each half of the sleeve to ensure adequate venting and sealant installation.
Page 4 of 5 Enclosure 1 Question 5: Paragraph 5.1.13 of the relief request states that sealant will be injected between the sleeve and the pipe. Discuss whether the sealant could fall into the pipe if a hole or crack occurs from corrosion.
If the sealant does fall into the pipe, would the debris affect the operation of the nuclear service water system? Response:
The sleeve shall fit close to the pipe being repaired resulting in an extremely thin annular space. The amount of sealant injected into the sleeve will be a very small volume. The current leak is a small pinhole experiencing leakage best characterized as "weepage".
The sealant shall be compatible with the raw water environment such that localized exposure due to an increase in the pit size would not challenge its integrity.
The leak location would have to increase in size substantially to allow to challenge the sealant integrity.
If the sealant were to deteriorate, the volume will be small such that it will not challenge system performance.
Question 6. Paragraph 5.1.15 of the relief request states that the sleeve will be visually monitored at least monthly and will be ultrasonically inspected at monthly intervals until the next refueling outage. (a) Discuss whether the visually monitoring and ultrasonic testing will be performed in a staggered fashion so that the sleeve can be monitored either visually or ultrasonically at least every two weeks. (b) Considering the aggressive corrosion rate of 0.001 inches per day, even with the proposed sleeve repair, discuss whether the daily walkdown at the plant should include the monitoring of the sleeve. (c) Discuss the elevation of the repaired piping with respect to the elevation of the plant personnel who performs visual monitoring.
Response:
The following details changes to paragraph 5.1.15 of the initial submittal in terms of monitoring of the sleeve: (a) Visual monitoring will be conducted daily during Operator rounds and ultrasonic testing will be performed at least once every two weeks. (b) Considering the possible aggressive corrosion rate of 0.001 inches per day, visual monitoring will be conducted daily during Operator rounds. (c) The floor elevation in this area is at plant elevation 716'-0". The centerline of the 8" diameter piping is at elevation 724'-0" for 1 RN-824 and 726'-3" for 1 RN-883 as shown on Attachment 2 of the initial submittal.
A platform has been erected at this location to allow access for individuals performing both visual and UT inspections.