MNS-18-018, McGuire, Units 1 & 2, Submittal of Emergency Plan Implementing Procedure Changes

From kanterella
Jump to navigation Jump to search
McGuire, Units 1 & 2, Submittal of Emergency Plan Implementing Procedure Changes
ML18075A315
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 02/22/2018
From: Ray T D
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MNS-18-018
Download: ML18075A315 (2)


Text

ef,DUKE ~;ENERGY February 22, 2018 Serial No. MNS-18-018 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C. 20555-0001

Subject:

Duke Energy Carolinas, LLC McGuire Nuclear Station Units 1 & 2 Docket Nos. 50-369, 50-370 Emergency Plan Implementing Procedure Changes Thomas D. Ray, P.E. Site Vice President McGuire Nuclear Station Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Tom.Ray@duke-energy.com 10 CFR 50.54(q) Enclosed for Nuclear Regulatory Commission (NRC) Staff use and review is the Emergency Plan Implementing Procedures Index and the following procedures:

AD-EP-MNS-0105 AD-EP-MNS-0106 AD-EP-MNS-0203 EP Grp. Manual Sect. 1.1 Rev. 000 Rev. 000 Rev. 000 Rev. 027 These procedures are being submitted in accordance with the requirements of 10 CFR 50.54(q).

The changes do not result in a reduction in the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

The McGuire Emergency Plan continues to meet the regulatory requirements of 10 CFR 50.47(b) and 10 CFR 50 Appendix E. Questions regarding this submittal should be directed to Jeff Thomas, McGuire Regulatory Affairs at (980) 875-4499.

9r-r~ -br Thomas D. Ray, P.E. Site Vice President McGuire Nuclear Station Attachments W'Nw.duke-energy .com U. S. Nuclear Regulatory Commission February 22, 2018 Page 2 (Two Copies) cc: Catherine Haney, Regional Administrator Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 (One Copy) Director Office of Nuclear Material Safety and Safeguards Mail Stop 14 A12 Washington, D. C. 20555-0001 (w/o attachments)

Michael Mahoney, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 Andy Hutto NRC Senior Resident Inspector McGuire Nuclear Station