MNS-17-016, Nuclear Regulatory Commission (NRC) Annual Commitment Change Report

From kanterella
Jump to navigation Jump to search
Nuclear Regulatory Commission (NRC) Annual Commitment Change Report
ML17143A227
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 05/18/2017
From: Capps S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MNS-17-016
Download: ML17143A227 (3)


Text

el;,,,. DUKE Steven D. Capps

~'ENERG~*

, Vice President McGrn.re Noolear Stamm Duke Energy MG01VP 112700 I-lagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 704.875.4009 Steven.Capps@duke-energy.com Serial No: MNS-17-016 May 18, 2017 U.S. Nuclear Regulatory Commission Washington, DC 20555-001 ATTENTION: Document Control Desk

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station, Units 1 and 2 Docket No. 50-369, 50-370 Renewed License No. NPF-9 and NPF-17 Nuclear Regulatory Commission (NRC) Annual Commitment Change Report Attached is the summary of commitment changes processed for McGuire Nuclear Station during

  • the 2016 calendar year. These changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments," and have no adverse effect on compliance with NRC rules or regulations.

Questions regarding this submittal should be directed to Brian Richards at (980) 875-5171.

Sincerely,

}J~~

Steven D. Capps Attachment

U.S. Nuclear Regulatory Commission May 18, 2017 Page 2 cc w/ Attachments:

C. Haney Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Electronic Copies:

  • A. Hutto (MNS senior resident inspector) andy.hUtto@nrc.gov M. Mahoney (NRC project manager) michael.mahoney@nrc.gov

Attachment 1 Page 1 of 1 McGuire Nuclear Station Commitment Change Summary Report Docket Nos. 50-369 and 50-370 NUMBER SOURCE ORIGINAL COMMITMENT MODIFIED COMMITMENT DOCUMENT 2016-M-001 MNS "The 4kv and the 7kv buses "The 4kv and the 7kv buses 2017-M-001 Commitment have a PM frequency of 6R have a PM frequency of 8R Changes 2002- with grace. Lower voltage with grace. Lower voltage M-004 and buses have a PM frequency buses have a PM frequency 2003-M-OO 1, of 6 years. However, a one of 6 years with grace.

letter dated time exception to the lower However, a one-time 4/15/2004 voltage bus PM frequency is exception to the lower voltage allowed if needed to align bus PM frequency is allowed the lower voltage buses in if needed to align the lower an overall bus matrix voltage buses in an overall schedule." bus matrix schedule."