ML18101B075

From kanterella
Revision as of 12:19, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards LER 95-023-00 Re Failure to Plug SG Tubes Due to Missed Eddy Current Indications.Commitments Currently Outstanding Re Issue Also Encl
ML18101B075
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/24/1995
From: Warren C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18101B076 List:
References
NUDOCS 9510300060
Download: ML18101B075 (2)


Text

e

  • Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-272 UNIT NO. 1 LICENSEE EVENT REPORT NO. 95-023-00 OCT 2 4 1995 This Licensee Event Report entitled "Failure to Plug Steam Generator Tubes Due to Missed Eddy Current Indications" is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR50.73(a)

(2) (i) (B). Attachment A contains those commitments which are currently outstanding related to this issue. Attachment A SORC Mtg.95-121 JMO C Distribution LER r J?*i l,e.._ t.__ * (_: l_,. ' -' \.I .._; 9510300060 951024 PDR ADOCK 05000272 S PDR Th:-* r. l\'."-'"T ir ,*,1: T hr'.L<; i l-;-' *'--* ... l, -..l h. l l .. ,* Sincerely, ClafJlc. Warren General Manager -Salem Operations 95-2168 REV. 6/94

  • Attachment A PSE&G Commitments for LER 272/95-023 The following item represents PSE&G commitments made to the Nuclear Regulatory Commission related to LER 272/95-023.

The commitments are as follows: Salem Unit #1 1 A structural integrity assessment is being performed to confirm that affected tubes in their as-found condition meet the requirements of Reg. Guide 1.121. 2. Data analyst guidelines specific to Salem Units 1 and 2 are being developed.

Prior to performing any S/G ECT inspections in either Unit #1 or Unit #2, all analysts will be trained and tested to demonstrate proficiency in the use of the guidelines.

3. A full length bobbin coil ECT inspection expansion of all unplugged tubes in all steam generators from the current 20% sample size will be performed to assure that all bobbin coil probe indications are analyzed during the current outage. The 1993 bobbin coil probe data will be reviewed for any additional pluggable indications identified in the current outage to assess the apparent growth rate of indications.

This expanded inspection scope may identify additional bobbin coil probe indications which should have been analyzed as pluggable in 1993. This task will be completed by March 29, 1996. 4. All bobbin coil inspection data already taken will be reanalyzed.

A PSE&G Level III examiner will provide oversight of this reanalysis effort. This task will be completed by March 29, 1996. 5. Steam generator tubes requiring plugging will be plugged based upon the results of tasks 3 and 4 prior to restart of Unit #1. Salem Unit #2 6. The corrective action described in item 2 above for site specific training and testing will be implemented prior to performing ECT on Salem Unit #2. 7. Salem Unit #2's steam generators will have completed 100% tube inspections prior to Unit #2 restart. If a defective tube was missed in a prior outage, the planned inspection program should detect the defective tube and a supplement to this LER will be issued.