ML061320150

From kanterella
Revision as of 18:59, 27 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
E-mail from R. Lavera of Entergy to Various, Regarding Sample Summary Sheets
ML061320150
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/10/2006
From: LaVera R
Entergy Nuclear Northeast, Entergy Nuclear Operations
To: Colville R, Croulet D, Deeds P, Drake R, Durfee M, English C, Evers B, Hinrichs G, Jones T R, Kulaga J, LaVera R, Leach D, Mayer D, McMullin K, Morin K, Nuta D A, Peters J, Rutkoske M, Sachatello R, Santis H, Skonieczny J, Danni Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320150 (13)


Text

Unknown Sent: Tuesday, January 10, 2006 6:25 AM Summary sheets for January 9th 2006.From: Lavera, Ron Sent: Monday, January 09, 2006 4:50 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs;Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones

Subject:

Sample Summary Sheets Please see the attached sample summary sheets for Jan. 91 2006.Thanks Ron FAR RLaVera@entergy.com

<mailto:RLaVera

@ enterqy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

+4l Page 1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th Man-holes (Storm Drains)ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Too dry to sample_ 1-4-06 Bldg. by Water ND/HTO MH-2 12/16/2005 River Front 651 pCiAi MH-2A 1/4/2006.

y IP-2 EDG3Y ND/HTO MH-3 11/10/2005 North of IP-2 Turbine 1,950 pCi/A 12/8/2005 Building 894 pCi/I 12/16/05 651 pCi/A 12/20/2005 2,330 pcin_ 1/4/2006 3,450 pCiAi MH-4 12/16/2005 Transformer Yard 4,370 pCi/A 1/4/2006 3,070 pCiAi M:FH-4A 12/21/2005 IP-2 Condenser Tube 2,730 pCi/l 1/4/2006 removal pit 3,380 pCi/A M:H-5 11/10/2005' ux Feed Bldg) 2,390 pCi/l 12/8/2005 2,020 pCiA 12/20/2005 6,920 pCiAl 1/4/2006 _ 3,480 pCi/A M:H-6 11/10/2005 Transformer Yard 51,300 pCi/l 12/8/2005 37,100 pCi/l 12/16/2005 12,200 pCiA_ 1/4/2006' 13,100 pCiAl M:H-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCiA MJH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCiA MEI-9 12/16/2005 MOB Hill -80' 2,140 pCiA MEI-10 12/16/2005 MOB Hill -80' 2,940 pCi/i MEI-12 1-4-06 West of IP-2 Turb.Bldg. by river NDJHTO MHI-14 1/4/06 ND/HTO ME-I-17 12/16/2005 Transformer Yard 1,710 pCiA M]IH-18 12/16/2005 Transfonner Yard 854 pCiA MEI-19 12/16/2005 Transformer Yard 1,800 pCiA MEI-A4 10/18/2005 IP-3 Manhole Located east of the.IP-3 Monitor Tank ND/HTO M:H-B8 10/18/2005 IP-3 Manhole located west of the north end 959 pCi/A I~rct Stacy Page 1 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST 39 1,010 pCi/l CI3-24 1/4/2006 By IP-2 Sec. Bldg 822 pCi/l ID Date Location Sample Results M7W-30 11/22/2005 FSB Leakage Area -464, 000 to 600, 000 pCi/l.Note: Well developmen HTO%DT completed MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/l HTO MIW-33 12/15/2005 Transforner Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/Q HTO 01/06/2006 189,000 pCi/l HTO MTW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/l HTO 1/06/2006 159,000 pCi/I HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/l HTO 12/19/2005 76,000 pCi/l HTO 12/29/2005 80,500 pCi/l HTO 1 1/6/2006 1 1 95,400 pCi/l HTO ID Date Location Sample Results MW-38 12/2/2005 End of IP-3 15000 pCi/l HTO -False Discharge Canal Positive due to sample Concrete contamination.

12/5/2005 ND/HTO 12/6/2005 ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12-30-05 ND/HTO ebol Stacy Page 2 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results MW-11l 9/28/2005 Transformer Yard 212,000 pCi/Q HTO 10/5/2005 188,000 pCi/Q HTO 10/14/2005 6820 pCi/l HTO(rain)10/14/2005 6320 pCi/Q HTO (back-up)10/21/2005 284,000 pCi/Q HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCiQ HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCi/Q HTO 11/22/2005 180,000 pCiQ HTO 12/02/2005 125,000 pCiQ HTO 12/08/2005 270,000 pCiQ HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/Q HTO ID Date Location Sample Results RVW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC MW-l05 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/Q DEC MIW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC MW-108 9/29/2005 GT-1 ND/HTO 11/3/05 ND/HTO MV[W-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO Stacy Page 3 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results U3-I 10/6/2005 U3 Discharge Canal 417 pCi/l HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCiA HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO_ 12-30-05 ND/HTO U3-4 10/16/2005 U3 Condensate 406 pCi/I HTO 10/21/2005 Polisher 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/Q HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 399 pCiAIHTO_, 12-30-05 442 pCiA/HTO U3-T1 10/6/2005 U3 South Turbine 703 pCiA HTO_ 10/21/2005 ND/HTO Stacy Page 4 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th 10/28/2005 ND/HTO 11/4/2005 NDJHTO 11/10/2005 563 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 498 pCi/i HTO 12/15/2005 ND/HTO 12-30-05 529 pCi/i HTO U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/i HTO 10/21/2005 1,470 pCi/I HTO 10/21/2005 1,420 pCi/l HTO DEC 10/28/2005 1,280 pCiII HTO 11/4/2005 1,190 pCi/l HTO 11/10/2005 1,640 pCi/i HTO 11/18/2005 1,130 pCi/I HTO 12/2/05 1,329 pCi/l HTO 12/15/05 1,290 pCi/l HTO_ 12-30-05 1,685 pCi/i HTO ID Date Location Sample Results 12/06/2005 Lafarge Property.

ND/HTO Well-I 12/06/2005 North East Well -ND/HTO DEC Farthest from river 12/06/2005 Lafarge Property.

N/TO Well-3 12/06/2005 North West Well -ND DEC closest to river ND/HTO DEC Stacy Page 5 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th MW-111, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 ZI:-S° 200,000.2= 150,000._-100,000 50,000 0 A II__ -__ I A_T_ .#O N_Pr.0 U r!, .-rf,*j *.0 n i I I I I I I I I i i I I* MW-111 pCi/I HTO--MW-33 pCi/l HTO-U- MW-34 pCi/I HTO-1 -MW-35 pCi/l HTO l to oo o t to o o o o O oa 0 0 0 0 0) 0 0) 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 ) ' o 0 0 0 Date 0 C'!uz g5 0 to to to o o o 0 0 0 0 o 0 0 0 0! N! Q C C'!7 c ,-i _q Stacy Page 6 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Date ID Location Sample Results 9/28-29/2005 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW- 11 Transformer Yard 212,000 pCi/l HTO 10/5/2005 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/2005 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/2005 U3-T1 U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-1Il Transformer Yard 188,000 pCi/I HTO 10/14/2005 MW-111 Transformer Yard 6,820 pCi/Il HTO (rain)MW-111 Transformer Yard 6,320 pCi/I HTO (back-up)10/16/2005 U3-4 U3 Condensate Polisher 406 pCi/I HTO 10/18/2005 MH-B8 IP-3 Manhole IP-3 Disch 959 pCi/l HTO Canal MH-A4 East of IP-3 Monitor ND/HTO Tank 10/21/2005 MW-111 Transformer Yard 284,000 pCi/l HTO 267,000 pCi/l HTO DEC 10/21/2005 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/l HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-4 U3 Condensate Polisher 344 pCi/l HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC 10128/2005 MW-111 Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 1 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/2005 MW-111 Transformner Yard 302,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 1113-4/2005 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/2005 MW-1il Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO MH-6 Transformer Yard 51,300 pCi/l HTO 11/18/2005 MW-ll1 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCi/l HTO 11/22/2005 MW-I 11 Transformer Yard 180,000 pCi/I HTO 12/02/2005 MW-111 Transformer Yard 125,000 pCi/I HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 2 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCiQI HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/8/2005 MW-101 U2 Warehouse ND/HTO MW-105 Maintenance Training ND/HTO MW-107 NEM ND/HTO MW-38 End of IP-3 Discharge 985 pCi/Q HTO MW-38 Canal Concrete 701 pCi/l HTODEC 12/08/2005 MW- 11 Transformer Yard 270,000 pCi/l HTO MH-3 North of IP-2 Turb. 894 pCi/i HTO MH-5 Transformer Yard 2,020 pCi/A HTO MH-6 Transformer Yard 37,100 pCi/Q HTO MW-38 End of IP-3 Discharge 985 pCi/l HTO Canal Concrete 701 pCiQ HTO DEC MW-101 EOF ND/HTO MW-101 EOF ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-105 Maint. Train. Facil 96 pCi/Q HTO DEC MW-107 NEM Well ND/HTO MW-107 NEM Well ND/HTO 12/13/2005 MW-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformner Yard 42,300 pCi/l HTO 12/15/2005 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCiQ HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/l HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/l HTO 12/16/2005 MH-19 Transformer Yard 1,800 pCi/l HTO MH-18 Transforrner Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/I HTO MH-8 Transformer Yard 4,510 pCi/l HTO MH-6 Transformer Yard 12,200 pCi/I HTO Stacy Page 3 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th MH-4 Transformer Yard 4,320 pCi/I HTO MH-3 North of IP-2 Turb 651 pCi/l HTO 12/19/2005 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/l HTO MW-35 Transformer Yard 76,000 pCi/I HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/I HTO MH-5 CIn ABFP Bldg._ 6,920 pCi/I HTO MH-7 Transformer Yard 5,340 pCi/l HTO 12/19/2005 Discharge Hudson River <MDA pCi/l HTO Canal 12,/20/2005 MH-3 /Outside of Turbine BldI 2,330 pCi/I HTO MH-5 EAux Feed Bldg. -t 6,920 pCi/I HTO 12/21/2005 MH-4A Condensor Tube Pull Pit 2,730 pCi/l HTO MH-i River Front Dry -No Sample Taken.12/29/2005 MW-111 MOB 212,000 pCi/l HTO MW-33 Transformer Yard 220,000 pCi/I HTO MW-34 Transformer Yard 147,000 pCi/i HTO MW-35 Transformer Yard 80,500 pCi/l HTO 12/30/2005 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/l HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete al$F eove 1/4/2006 MH-2A CB-4 CB-24 MH-I MH-2 MH-3 MH-4 MH-4A MH-5 MH-6 MH-7 MH-8 MH-12 MH-14)Ty IP-2 EDGIb Wy IP-2 RWST3a 1 3y IP-2 Security Bldg, North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg Between Turb. & ABFP IP-2 Cond. Tube Pit EP-2 ABFP Bldg IP-2 TransformetrYard IP-2 Transformer Yard IP-2 Transformer Yard North End IP-2 Turb.North End IP-2 Turb.ND/HTO 1,010 pCi/l HTO 651 pCi/l HTO ND/HTO ND/HTO\3,070 pCi/l HTO 3,380 pCi/I HTO 3,480 pCi/l HTO 13,100 pCi/l HTO 8,140 pCi/I HTO 5,740 pCi/l HTO ND/HTO ND/HTO Stacy Page 4 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th 1/5/2006 MW-31 MOB 3,050 pCi/I HTO 1/6/2006 MW-111 Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/I HTO MW-3_ .Transfo __erYard95,4000pCi/I HTO Stacy Page 5 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Monitoring Wells / Locations Off-Site Date Location Results 10/18/2005 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/2005 Gypsum Outfall ND/HTO -Gamma Algonquin ND/HTO- Gamma 5 th Street Well ND/HTO -Gamma 10/25/2005 Rock Quarry ND/HTO -Gamma 1.1/8/2005 5 th Street Well ND/HTO -Gamma 11/30/2005 Gypsum Outfall ND/HTO 11/30/2005 Algonquin ND/HTO 5 th Street Well ND/HTO Rock Quarry ND/HTO Croton Reservoir ND/HTO Camp Field Reservoir ND/HTO 1'2/6/2005 Gypsum Plant Well #1 ND/HTO Gypsum Plant Well #2 ND/HTO 12/13/2005 Algonquin Outfall ND/HTO Gypsum Outfall ND/HTO= Rock Quarry ND/HTO Stacy Page 6 of 6