E-mail from R. Lavera of Entergy to Various, Regarding Sample Summary SheetsML061320150 |
Person / Time |
---|
Site: |
Indian Point |
---|
Issue date: |
01/10/2006 |
---|
From: |
Ronald Lavera Entergy Nuclear Northeast, Entergy Nuclear Operations |
---|
To: |
Colville R, Croulet D, Deeds P, Drake R, Durfee M, English C, Evers B, Hinrichs G, Jones T, Kulaga J, Ronald Lavera, Leach D, Mayer D, Mcmullin K, Morin K, Nuta D, Peters J, Rutkoske M, Sachatello R, Santis H, Skonieczny J, Danni Smith NRC/FSME |
---|
References |
---|
FOIA/PA-2006-0140 |
Download: ML061320150 (13) |
|
|
---|
Category:E-Mail
MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 – Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 – State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 – Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 – NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] Category:Environmental Monitoring Report
MONTHYEARML24128A0642024-05-0707 May 2024 2023 Annual Radiological Environmental Operating Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML23132A1852023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML22182A0762022-07-0101 July 2022 Resubmittal of the 2021 Annual Radioactive Effluent Release Report ML22123A2062022-05-0303 May 2022 2021 Annual Radiological Environmental Operating Report ML22118A4932022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report ML22109A1062022-04-19019 April 2022 2021 Annual Environmental Protection Plan Report ML21167A1882021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report ML21168A0242021-04-30030 April 2021 Annual Radioactive Effluent Release Report ML19252A2822019-08-28028 August 2019 Jones Day to NMFS, Sturgeon Monitoring Pursuant to Biological Opinion for Indian Point NL-19-039, Annual Radioactive Effluent Release Report2019-04-23023 April 2019 Annual Radioactive Effluent Release Report NL-18-029, 2017 Annual Environmental Protection Plan Report2018-04-26026 April 2018 2017 Annual Environmental Protection Plan Report NL-17-066, Submittal of 2016 Annual Radiological Environmental Operating Report2017-05-15015 May 2017 Submittal of 2016 Annual Radiological Environmental Operating Report NL-17-047, Submittal of 2016 Annual Radioactive Effluent Release Report2017-04-26026 April 2017 Submittal of 2016 Annual Radioactive Effluent Release Report NL-16-058, Transmittal of 2015 Annual Radiological Environmental Operating Report2016-05-12012 May 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report NL-16-043, Annual Radioactive Effluent Release Report for 20152016-04-28028 April 2016 Annual Radioactive Effluent Release Report for 2015 NL-15-061, Submittal of 2014 Annual Radiological Environmental Operating Report2015-05-12012 May 2015 Submittal of 2014 Annual Radiological Environmental Operating Report NL-15-048, 2014 Annual Radioactive Effluent Release Report2015-04-28028 April 2015 2014 Annual Radioactive Effluent Release Report ML15114A0482015-04-0606 April 2015 Reply to Request for Additional Information Regarding the License Renewal Application Environmental Review ML15114A0812015-04-0606 April 2015 2006 Year Class Report for the Hudson River Estuary Monitoring Program ML15114A0822015-04-0606 April 2015 2007 Year Class Report for the Hudson River Estuary Monitoring Program ML15114A0832015-04-0606 April 2015 2008 Year Class Report for the Hudson River Estuary Monitoring Program ML15114A0802015-04-0606 April 2015 2009 Year Class Report for the Hudson River Estuary Monitoring Program ML15114A0842015-04-0606 April 2015 2010 Year Class Report for the Hudson River Estuary Monitoring Program ML15114A0852015-04-0606 April 2015 2011 Year Class Report for the Hudson River Estuary Monitoring Program ML15091A0972015-04-0101 April 2015 Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report - Part 4 ML15091A0932015-04-0101 April 2015 Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report - Part 2 ML15091A0852015-04-0101 April 2015 Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report - Part 1 ML15091A0962015-04-0101 April 2015 Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report - Part 3 NL-14-039, Annual Radioactive Effluent Release Report2014-04-28028 April 2014 Annual Radioactive Effluent Release Report ML14097A3262014-03-31031 March 2014 Coastal Zone Management Act Consistency Certification in Support of Renewal of Operating Licenses NL-13-027, Submittal of 2012 Annual Radiological Environmental Operating Report2013-05-15015 May 2013 Submittal of 2012 Annual Radiological Environmental Operating Report NL-13-026, 2012 Annual Environmental Protection Plan Report2013-04-18018 April 2013 2012 Annual Environmental Protection Plan Report ML13093A2612013-03-29029 March 2013 Draft Monitoring Plan Required by Reasonable and Prudent Measure #1 of the Final Biological Opinion for Continued Operation of Indian Point Nuclear Generating Unit 2 and 3 ML13157A1322012-12-31031 December 2012 Enclosure 1 to NL-13-028 - Radioactive Effluent Release Report: 2012 NL-12-009, Transmittal of 2011 Annual Radiological Environmental Operating Report2012-05-15015 May 2012 Transmittal of 2011 Annual Radiological Environmental Operating Report ML11249A0122011-08-26026 August 2011 Letter from P. Kurkul, NMFS, to D. Wrona, NRC, Draft Biological Opinion for License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 NL-11-068, Indian Point, Units 1, 2 and 3 - 2010 Annual Radioactive Effluent Release Report, Revision 12011-06-10010 June 2011 Indian Point, Units 1, 2 and 3 - 2010 Annual Radioactive Effluent Release Report, Revision 1 NL-11-038, Indian Point, Units 1, 2 and 3 - 2010 Annual Radiological Environmental Operating Report2011-05-16016 May 2011 Indian Point, Units 1, 2 and 3 - 2010 Annual Radiological Environmental Operating Report NL-11-039, 2010 Annual Radioactive Effluent Release Report2011-04-22022 April 2011 2010 Annual Radioactive Effluent Release Report ML11195A1582011-01-31031 January 2011 Final Report, 2010 Field Program & Modeling Analysis of the Cooling Water Discharge from Indian Point Energy Center. Cover Page to Page 51 ML11195A1592011-01-31031 January 2011 Final Report, 2010 Field Program & Modeling Analysis of the Cooling Water Discharge from Indian Point Energy Center. Page 52 to 119 ML11195A1612011-01-31031 January 2011 Final Report, 2010 Field Program & Modeling Analysis of the Cooling Water Discharge from Indian Point Energy Center. Appendices a to D ML11195A1602011-01-31031 January 2011 Final Report, 2010 Field Program & Modeling Analysis of the Cooling Water Discharge from Indian Point Energy Center. Appendix E to End NL-10-053, Annual Radiological Environmental Operating Report for 20092010-05-13013 May 2010 Annual Radiological Environmental Operating Report for 2009 NL-10-045, 2009 Annual Radioactive Effluent Release Report2010-04-29029 April 2010 2009 Annual Radioactive Effluent Release Report NL-10-045, Indian Point Units 1, 2 & 3 - 2009 Annual Radioactive Effluent Release Report2010-04-29029 April 2010 Indian Point Units 1, 2 & 3 - 2009 Annual Radioactive Effluent Release Report NL-10-044, Submittal of 2009 Annual Environmental Protection Plan Report2010-04-27027 April 2010 Submittal of 2009 Annual Environmental Protection Plan Report 2024-05-07
[Table view] |
Text
Unknown Sent: Tuesday, January 10, 2006 6:25 AM Summary sheets for January 9th 2006.
From: Lavera, Ron Sent: Monday, January 09, 2006 4:50 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R.Jones
Subject:
Sample Summary Sheets Please see the attached sample summary sheets for Jan. 91 2006.
Thanks Ron FAR RLaVera@entergy.com <mailto:RLaVera @enterqy.com>
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
+4l Page 1
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th Man-holes (Storm Drains)
ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Too dry to sample
_ 1-4-06 Bldg. by Water ND/HTO MH-2 12/16/2005 River Front 651 pCiAi MH-2A 1/4/2006. y IP-2 EDG3Y ND/HTO I~rct MH-3 11/10/2005 North of IP-2 Turbine 1,950 pCi/A 12/8/2005 Building 894 pCi/I 12/16/05 651 pCi/A 12/20/2005 2,330 pcin
_ 1/4/2006 3,450 pCiAi MH-4 12/16/2005 Transformer Yard 4,370 pCi/A 1/4/2006 3,070 pCiAi M:FH-4A 12/21/2005 IP-2 Condenser Tube 2,730 pCi/l 1/4/2006 removal pit 3,380 pCi/A M:H-5 11/10/2005' ux Feed Bldg) 2,390 pCi/l 12/8/2005 2,020 pCiA 12/20/2005 6,920 pCiAl 1/4/2006 _ 3,480 pCi/A M:H-6 11/10/2005 Transformer Yard 51,300 pCi/l 12/8/2005 37,100 pCi/l 12/16/2005 12,200 pCiA
_ 1/4/2006' 13,100 pCiAl M:H-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCiA MJH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCiA MEI-9 12/16/2005 MOB Hill - 80' 2,140 pCiA MEI-10 12/16/2005 MOB Hill - 80' 2,940 pCi/i MEI-12 1-4-06 West of IP-2 Turb.
Bldg. by river NDJHTO MHI-14 1/4/06 ND/HTO ME-I-17 12/16/2005 Transformer Yard 1,710 pCiA M]IH-18 12/16/2005 Transfonner Yard 854 pCiA MEI-19 12/16/2005 Transformer Yard 1,800 pCiA MEI-A4 10/18/2005 IP-3 Manhole Located east of the
. IP-3 Monitor Tank ND/HTO M:H-B8 10/18/2005 IP-3 Manhole located west of the north end 959 pCi/A Stacy Page 1 of 6
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST 39 1,010 pCi/l CI3-24 1/4/2006 By IP-2 Sec. Bldg 822 pCi/l ID Date Location Sample Results M7W-30 11/22/2005 FSB Leakage Area - 464, 000 to 600, 000 pCi/l
.Note: Well developmen
%DT completed HTO ebol MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/l HTO MIW-33 12/15/2005 Transforner Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/Q HTO 01/06/2006 189,000 pCi/l HTO MTW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/l HTO 1/06/2006 159,000 pCi/I HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/l HTO 12/19/2005 76,000 pCi/l HTO 12/29/2005 80,500 pCi/l HTO 1 1/6/2006 1 1 95,400 pCi/l HTO ID Date Location Sample Results MW-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.
12/5/2005 ND/HTO 12/6/2005 ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12-30-05 ND/HTO Stacy Page 2 of 6
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results MW-11l 9/28/2005 Transformer Yard 212,000 pCi/Q HTO 10/5/2005 188,000 pCi/Q HTO 10/14/2005 6820 pCi/l HTO(rain) 10/14/2005 6320 pCi/Q HTO (back-up) 10/21/2005 284,000 pCi/Q HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCiQ HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCi/Q HTO 11/22/2005 180,000 pCiQ HTO 12/02/2005 125,000 pCiQ HTO 12/08/2005 270,000 pCiQ HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/Q HTO ID Date Location Sample Results RVW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC MW-l05 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/Q DEC MIW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC MW-108 9/29/2005 GT-1 ND/HTO 11/3/05 ND/HTO MV[W-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO Stacy Page 3 of 6
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results U3-I 10/6/2005 U3 Discharge Canal 417 pCi/lHTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCiA HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO
_ 12-30-05 ND/HTO U3-4 10/16/2005 U3 Condensate 406 pCi/I HTO 10/21/2005 Polisher 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/QHTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 399 pCiAIHTO
_, 12-30-05 442 pCiA/HTO U3-T1 10/6/2005 U3 South Turbine 703 pCiA HTO
_ 10/21/2005 ND/HTO Stacy Page 4 of 6
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th 10/28/2005 ND/HTO 11/4/2005 NDJHTO 11/10/2005 563 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 498 pCi/i HTO 12/15/2005 ND/HTO 12-30-05 529 pCi/i HTO U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/i HTO 10/21/2005 1,470 pCi/I HTO 10/21/2005 1,420 pCi/lHTO DEC 10/28/2005 1,280 pCiII HTO 11/4/2005 1,190 pCi/l HTO 11/10/2005 1,640 pCi/i HTO 11/18/2005 1,130 pCi/I HTO 12/2/05 1,329 pCi/lHTO 12/15/05 1,290 pCi/l HTO
_ 12-30-05 1,685 pCi/i HTO ID Date Location Sample Results 12/06/2005 Lafarge Property. ND/HTO Well-I 12/06/2005 North East Well - ND/HTO DEC Farthest from river 12/06/2005 Lafarge Property. N/TO Well-3 12/06/2005 North West Well - ND DEC closest to river ND/HTO DEC Stacy Page 5 of 6
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th MW-111, MW-33, MW-34 & MW-35 Tritium 350,000 A
300,000 250,000 ZI
- -S
° 200,000 I
.2 li
-- MW-33 pCi/l HTO I
-U- MW-34 pCi/I HTO
= 150,000 __ - __ I A
_T_ .#O N_ MW-35 pCi/l HTO Pr 100,000
.0U r!, . -rf,*
j
0 i I I I I I I I I i i I I l
o tooo t to o o o o O 0 o 0to 0to 0o 0o oa 0 0 0 0 0) 0 0) 0 0 to o o 0 0 0 0 0 0 0 0 0 C'! o 0 0 0 0 uz g5
! N! Q C C'!
0 7 c ,-
0 0) ' o 0 0 0 i _q Date Stacy Page 6 of 6
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Date ID Location Sample Results 9/28-29/2005 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW- 11 Transformer Yard 212,000 pCi/l HTO 10/5/2005 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/2005 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/2005 U3-T1 U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-1Il Transformer Yard 188,000 pCi/I HTO 10/14/2005 MW-111 Transformer Yard 6,820 pCi/Il HTO (rain)
MW-111 Transformer Yard 6,320 pCi/I HTO (back-up) 10/16/2005 U3-4 U3 Condensate Polisher 406 pCi/I HTO 10/18/2005 MH-B8 IP-3 Manhole IP-3 Disch 959 pCi/l HTO Canal MH-A4 East of IP-3 Monitor ND/HTO Tank 10/21/2005 MW-111 Transformer Yard 284,000 pCi/l HTO 267,000 pCi/l HTO DEC 10/21/2005 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/l HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-4 U3 Condensate Polisher 344 pCi/l HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC 10128/2005 MW-111 Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 1 of 6
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/2005 MW-111 Transformner Yard 302,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 1113-4/2005 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/2005 MW-1il Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO MH-6 Transformer Yard 51,300 pCi/l HTO 11/18/2005 MW-ll1 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCi/l HTO 11/22/2005 MW-I 11 Transformer Yard 180,000 pCi/I HTO 12/02/2005 MW-111 Transformer Yard 125,000 pCi/I HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 2 of 6
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCiQI HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/8/2005 MW-101 U2 Warehouse ND/HTO MW-105 Maintenance Training ND/HTO MW-107 NEM ND/HTO MW-38 End of IP-3 Discharge 985 pCi/Q HTO MW-38 Canal Concrete 701 pCi/l HTODEC 12/08/2005 MW- 11 Transformer Yard 270,000 pCi/l HTO MH-3 North of IP-2 Turb. 894 pCi/i HTO MH-5 Transformer Yard 2,020 pCi/AHTO MH-6 Transformer Yard 37,100 pCi/Q HTO MW-38 End of IP-3 Discharge 985 pCi/l HTO Canal Concrete 701 pCiQ HTO DEC MW-101 EOF ND/HTO MW-101 EOF ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-105 Maint. Train. Facil 96 pCi/Q HTO DEC MW-107 NEM Well ND/HTO MW-107 NEM Well ND/HTO 12/13/2005 MW-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformner Yard 42,300 pCi/l HTO 12/15/2005 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCiQ HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/l HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/l HTO 12/16/2005 MH-19 Transformer Yard 1,800 pCi/l HTO MH-18 Transforrner Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/I HTO MH-8 Transformer Yard 4,510 pCi/l HTO MH-6 Transformer Yard 12,200 pCi/I HTO Stacy Page 3 of 6
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th MH-4 Transformer Yard 4,320 pCi/I HTO MH-3 North of IP-2 Turb 651 pCi/l HTO 12/19/2005 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/l HTO MW-35 Transformer Yard 76,000 pCi/I HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/I HTO MH-5 CIn ABFP Bldg._ 6,920 pCi/I HTO 12/19/2005 MH-7 Discharge Transformer Yard Hudson River 5,340 pCi/l HTO
<MDA pCi/l HTO al$F Canal 12,/20/2005 MH-3 /Outside of Turbine BldI 2,330 pCi/I HTO 12/21/2005 MH-5 MH-4A EAux Feed Bldg.
Condensor Tube Pull Pit
-t 6,920 pCi/I HTO 2,730 pCi/l HTO eove MH-i River Front Dry - No Sample Taken.
12/29/2005 MW-111 MOB 212,000 pCi/l HTO MW-33 Transformer Yard 220,000 pCi/I HTO MW-34 Transformer Yard 147,000 pCi/i HTO MW-35 Transformer Yard 80,500 pCi/l HTO 12/30/2005 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/l HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 1/4/2006 MH-2A )Ty IP-2 EDGIb ND/HTO CB-4 Wy IP-2 RWST3a 1,010 pCi/l HTO CB-24 1 3y IP-2 Security Bldg, 651 pCi/l HTO MH-I North of IP-2 Turb. Bldg. ND/HTO MH-2 North of IP-2 Turb. Bldg.
MH-3 North of IP-2 Turb. Bldg ND/HTO\
MH-4 Between Turb. & ABFP 3,070 pCi/l HTO MH-4A IP-2 Cond. Tube Pit 3,380 pCi/I HTO MH-5 EP-2 ABFP Bldg 3,480 pCi/l HTO MH-6 IP-2 TransformetrYard 13,100 pCi/l HTO MH-7 IP-2 Transformer Yard 8,140 pCi/I HTO MH-8 IP-2 Transformer Yard 5,740 pCi/l HTO MH-12 North End IP-2 Turb. ND/HTO MH-14 North End IP-2 Turb. ND/HTO Stacy Page 4 of 6
On-Site Monitoring Wells Sorted by Date Executive Summary January 9th 1/5/2006 MW-31 MOB 3,050 pCi/I HTO 1/6/2006 MW-111 Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/I HTO MW-3_ .Transfo __erYard95,4000pCi/I HTO Stacy Page 5 of 6
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Monitoring Wells / Locations Off-Site Date Location Results 10/18/2005 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/2005 Gypsum Outfall ND/HTO - Gamma Algonquin ND/HTO- Gamma 5th Street Well ND/HTO - Gamma 10/25/2005 Rock Quarry ND/HTO - Gamma 1.1/8/2005 5th Street Well ND/HTO - Gamma 11/30/2005 Gypsum Outfall ND/HTO 11/30/2005 Algonquin ND/HTO 5 th Street Well ND/HTO Rock Quarry ND/HTO Croton Reservoir ND/HTO Camp Field Reservoir ND/HTO 1'2/6/2005 Gypsum Plant Well #1 ND/HTO Gypsum Plant Well #2 ND/HTO 12/13/2005 Algonquin Outfall ND/HTO Gypsum Outfall ND/HTO
= Rock Quarry ND/HTO Stacy Page 6 of 6