ML070600425
ML070600425 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 10/29/2006 |
From: | General Electric Co |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML070600425 (2) | |
Similar Documents at Oyster Creek | |
---|---|
Category:Report
MONTHYEARML24269A0472024-10-0404 October 2024
[Table view]Enclosure 2, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Pending Request for Additional Information ML24214A0612024-08-0101 August 2024 Enclosure 15: ENG-OCS-014 Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24214A0692024-08-0101 August 2024 Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 ML24214A0702024-08-0101 August 2024 Enclosure 19: Technical Basis Document, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS Revision 0, February 14, 2024 ML24214A0782024-08-0101 August 2024 Enclosure 22: Tsd 24-055, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways, Revision 0 ML24214A0792024-07-0808 July 2024 Enclosure 23: Tsd 24-063, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways, Revision 0 ML24214A0482024-03-31031 March 2024 Enclosure 6: Oyster Creek Nuclear Generating Station Below Grade Structures Radiological Characterization Report Revision 1, March 2024 ML24214A0492024-03-0606 March 2024 Enclosure 7: ENG-OCS-002 Revision 1, RESRAD-Build Input Parameter Sensitivity Analysis - Ocs, March 6, 2024 ML24214A0642024-03-0606 March 2024 Enclosure 16: ENG-OCS-015 Revision: 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values Oyster Creek Station, March 6, 2024 ML24214A0602024-03-0606 March 2024 Enclosure 14: ENG-OCS-013 Revision: 1, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways Oyster Creek Station, March 6, 2024 ML24214A0652024-02-20020 February 2024 Enclosure 17: ENG-OCS-016 Revision: 0, Calculation of Buried Pipe Dcgl Values Oyster Creek Station, February 20, 2024 ML24214A0722024-02-14014 February 2024 Enclosure 20, Oyster Creek 100 Year Land Use Outlook - Categorization and Justification, Ghd, February 9, 2024 ML24214A0582023-11-0101 November 2023 Enclosure 13: ENG-OCS-012 Revision: 0, Basement Fill Model Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways Oyster Creek, November 1, 2023 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML24214A0542023-07-26026 July 2023 Enclosure 11: ENG-OCS-008 Revision: 0, Derived Concentration Guideline Levels Values for Soil – Industrial Use Scenario Oyster Creek, July 26, 2023 ML24214A0532023-07-25025 July 2023 Enclosure 10: ENG-OCS-007 Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 ML24214A0442023-04-24024 April 2023 Enclosure 5: Oyster Creek Generating Station Radiological Characterization Report Revision 1, April 24, 2023 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML24214A0752022-09-0808 September 2022 Enclosure 21: Oyster Creek Hydrogeologic Investigation Report, September 8, 2022 ML24214A0572022-08-0404 August 2022 Enclosure 12, ENG-OCS-009 Revision: 0, Area Factors for Soil – Industrial Use Scenario, August 4, 2022 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML24214A0522022-04-14014 April 2022 Enclosure 9: ENG-OCS-006 Revision: 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures, April 14, 2022 ML24214A0512022-04-12012 April 2022 Enclosure 8: ENG-OCS-004 Revision 0, Resrad Building Surface Dcgl Values Oyster Creek, April 12, 2022 ML24214A0432022-01-17017 January 2022 Enclosure 4: Radionuclide Selection for Dcgl Development Oyster Creek Station Site Characterization Project, Revision 1, January 17, 2022 ML24214A0392021-11-30030 November 2021 Enclosure 3: Oyster Creek Station, Historical Site Assessment (Hsa) Revision 2, November 2021 ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- 2024-08-01 Category:Miscellaneous MONTHYEARML23025A0112023-01-24024 January 2023
[Table view]LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML13098A2092013-04-0505 April 2013 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. ML12166A5042012-07-0505 July 2012 Operating Station Review of Committment Submittal for License Renewal Regarding Thermal Aging Irradiation Embrittlement of Cast Austenitic Stainless Steel ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants RA-11-031, Oyster Creek - Submittal of Commitment Change Summary Report - 20102011-08-12012 August 2011 Oyster Creek - Submittal of Commitment Change Summary Report - 2010 NEI 99-04, Oyster Creek - Submittal of Commitment Change Summary Report - 20102011-08-12012 August 2011 Oyster Creek - Submittal of Commitment Change Summary Report - 2010 RA-11-005, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2009 Though December 31, 20102011-06-24024 June 2011 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2009 Though December 31, 2010 RA-10-023, Submittal of Commitment Change Summary Report - 20092010-08-0606 August 2010 Submittal of Commitment Change Summary Report - 2009 NEI 99-04, Oyster Creek, Submittal of Commitment Change Summary Report - 20092010-08-0606 August 2010 Oyster Creek, Submittal of Commitment Change Summary Report - 2009 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1007402512009-08-0707 August 2009 AR 00916938 Report ML0934208122009-06-29029 June 2009 Root Cause Evaluation Report: Tritium Identified in Emergency Service Water (ESW) Vault ML1020203712009-06-25025 June 2009 Assignment Report #00907846 ML1007402602009-06-24024 June 2009 Issue - Statement of Confirmation ML1007402612009-06-24024 June 2009 AR 00934636 Report ML1020203682009-06-23023 June 2009 Assignment Report #009128267 ML1007402592009-06-21021 June 2009 Stable Standard-Fixed Target Hot Lab ML1007402192009-06-14014 June 2009 AR 00931098 Report ML1007402562009-06-0505 June 2009 AR 00928211 Report ML1020203672009-06-0404 June 2009 Assignment Report #00928211 ML1020203662009-06-0303 June 2009 Assignment Report #00927310 ML1007402572009-06-0101 June 2009 AR 00926251 Report ML1020203652009-05-26026 May 2009 Assignment Report #00907846 ML1007402162009-05-22022 May 2009 AR 00922841 Report ML1007402552009-05-22022 May 2009 AR 00922841 Report ML1020203302009-05-14014 May 2009 Assignment Report #00919392 2023-01-24 |
Text
VISUAL EMINATION REPORT Visuul Inspection
- tern Technique:
fl{ Resolution Verified bv: fl~a @ .@&@&&&-l.~
Equipment Used Mirror m, Magnifier a, Remote.E/W Video a, Remote Color Video a, Other @ if so explain in -- "Comments" section.
C&W -8d-d- webf' Lighting Used: Ambient a, Flashlight
- a. Other if so explain in "Comments" section.
Tools Used: Six Inch Scale m, 6inoculors
- 0. Welding Gaugen. Thread Gauge 0, Other if so explain in "Comments" section.
%notum E Review Name
& Level: tility Review: Date: /d -Z?-o6 Date: 311/ANI Review Date:
. ... VISUAL EXAMINATION REPORT Site: pLy7~R C E G E K lunit I I Report Number 2 /R. Sheet 1 of 1 Outage: ZIR I Procedurer;r.vrw Version / Rev 3 DRR Q/A I Comp /Weld No. Configuration: Acceptance Criterib:
&E- V?--/o//?
Surfoce Condition:
45 fawn Technique:
VT- 1 Resolution Verified by TEST LRLD Equipment Used Mirror m, Magnifier Iz], Remote B/W Video a, Remote Color Video a, Other 0 if so explain in "Comments" section. Lighting Used: Ambient 0, Flashlight a Other Tools Used Six Inch Scale 0, Binoculars 0, Welding Gougen, Thread Gauge 0, Other if so explain in "Comments" section. System: 187 DwG IMP Ib$3*lls*oI 3E - 197- 79.00 1 1.8 SUMP 5ccmP I Material:
55 1 Item: DRYWELL 5u~p Wsuol lnspaction