ML17264B025

From kanterella
Revision as of 13:43, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Drawings B-308-633 & 634 & Rev 4,pages 1,28 & 29 of Procedure CPI-LVL-934, Calibration of SI Accumulator B Level Loop 934, as Requested.W/Two Oversize Drawings
ML17264B025
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/17/1997
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264B026 List:
References
NUDOCS 9709240257
Download: ML17264B025 (10)


Text

CATEGORY 1 REGULATORWINFORMATION DISTRIBUTION STEM (RIDE)T 05000244 E NOTES:License Exp date in accordance with lOCFR2,2.109(9/19/72).

ACCESSIONS NBR:9709240257 DOC.DATE: 97/09/17 NOTARIZED:

NO DOCKET FACIAL:50=244,Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSINGFG~ST

SUBJECT:

Forwards Drawings B-308-633 6 634 6 rev 4,pages 1,28 6 29 of procedure CPI-LVL-934,"Calibreation of SI Accumulator B Level Loop 934," as requested.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution RECIPIENT ID CODE/NAME PDl-1 LA VISSINGFG.

COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD COPIES LTTR ENCL 1 1 INTERNAL: 1 1 NRR DE 1 1 NRR/DSSA/SPLB 1 1 NUDOCS-ABSTRACT 1 1 NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 1 1 1 1 1 1 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D N NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'O HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 l

AND ROCHESTER GAS AND ELECTRIC CORPORATION

~89 EAST AVHVLJE, ROCHESTER N.Y Id&f9-tlOOI AREA CODE 716 5'-27OO ROBERT C.MECREDY Vice President Nvdear Operations September 17, 1997 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

Supporting Information for Correction of Accumulator Borated Water Volume (SR 3.5.1.2)Rochester Gas&Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244

Reference:

Letter from R.C.Mecredy, RG&E, to G.S.Vissing, NRC,

Subject:

Application for Amendment to Facility Operating License, Correction of Accumulator Borated 8'ater Volume (SR 3.5.1.2), dated August 19, 1997.

Dear Mr.Vissing,

Per your request, enclosed are four documents related to the accumulator water volume.A brief description of each document is provided below: 1.Gilbert Associates Inc., Drawing B-308-633,-This drawing shows the physical layout of Accumulator A and its two level transmitters (LT-938 and LT-939).2.Gilbert Associates Inc., Drawing B-308-634,-This drawing shows the physical layout of Accumulator A and its two level transmitters (LT-934 and LT-935).Ginna Station Procedure CPI-LVL-934, Calibration of SI Accumulator B Level Loop 934, Revision 4, pages 1, 28, and 29 only-This procedure shows: (1)how accumulator LT-934 transmits to the main control board, and (2)a detailed drawing of the vertical piping from the accumulator which the level transmitter is connected to.The level transmitter is actually only measuring the level over a 14n span in this vertical pipe which corresponds to a 0-100%level span (e.g., 7" equals 50%level as required by technical specifications).

This procedure is typical for all four level transmitters.

9709240257 970917 PDR ADOCK 05000244 P PDR lllllllllllllllilJlllllllilllllll!IIII!I

/pzC I A simplified drawing of the main control board accumulator level transmitter.

Please let us know if we can be of any further assistance.

Very truly yours, Robert C.Mecredy MDF)943 Attachments xc: U.S.Nuclear Regulatory Commission Mr.Guy Vissing (Mail Stop 14B2)PWR Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NO.PROCEDURE NO.CPI-LVL-934 CALIBRATION OF SI ACCUMULATOR B LEVEL LOOP 34 RESP SIBLE MANAGER GCT 28 1996 EFFECTIVE DATE TEMPORARY PCN NO.(s)***************************************************************4'*

  • THIS PRGCEDURE INVOLVES SAFETY-RELATED COMPONENTS
    • THIS PROCEDURE INVOLVES TECHNICAL SPECIFICATIONS
    • THIS IS A QA PROCEDURE******************************************************************

WO NO.REVIEWED BY DATE CATEGORY 1'CPI-LVL-934 Page 1 of 29 Rev.04 CONTAINMENT MIDDLE LEVEL SI ACCUMULATOR B l I RACK SA-RELAY ROOM LQ-934 POWER SUPPLY LC-934A/B ALARM LC-934B-X RELAY (LO)RELAY RACK MI-fRONT LT-934 TP TB SAC 4 (-)5 (+)TP/934 0 0+O R LC-934A-X RELAY 857A I 8578 MAIN CONTROL BOARD 855G LI-934 ANNUNCIATOR C ACCUMULATOR 18 (LOOP A)PRESS 57 F.75 0 I 007o CPI-LVL-934 Figure 1, SI Accumulator B Le~el Loop 934 Page 28 of 29 Rev.04 VENT PLUG FROM ACCUMULATOR

-'t 4 LEVEL TRANSMITTER L~>~$'Q l P (vu 4~~r~a.~5 GAL WATER COHTAIHER PUMP-7 305 INTERMEDIATE LEVEL BASEMEHT LEVEL FROM ACCUMULATOR TYGOH TUBING TEST CONHECTIOH VALVE 3/8 SWAGLOK TEE Figure 2, Test Equipment Hook-Up For Level Transmitter CPX-LVL-934 Page 29 of 29 Rev.0 i6 100 80 A C C T K 60 Typical Accumulator Main Control Board Level Indication lA-2 L E V E L 40-20 0 1I ('l E I