ML18106A235

From kanterella
Revision as of 23:21, 11 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Supplemental LER 95-023-01 Re Failure to Plug SG Tubes Due to Missed Eddy Current Indications.Suppl Being Submitted to Discuss Cause & Safety Significance of Event
ML18106A235
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/30/1997
From: BAKKEN A C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A236 List:
References
LR-N970756, NUDOCS 9801130415
Download: ML18106A235 (2)


Text

  • "t' * 'v Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DEC 3 0 1997 LR-N970756 LER 272/95-023-01 SALEM GENERATING STATION -UNIT 1 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Gentlemen:

This Supplemental Licensee Event Report entitled "Failure to Plug Steam Generator Tubes due to Missed Eddy Current Indications" is being submitted pursuant to the requirements of the Code of Federal Regulations

        • 1OCFR50.73 (a)(2)(i)(B)****.

The supplement is being submitted to discuss the cause and safety significance of the event. When the original LER was submitted, Public Service Electric and Gas (PSE&G) anticipated that a supplement would be issued by March 29, 1996. However, during the first quarter of 1996, due to the condition of the steam generators, all Unit 1 work was suspended while PSE&G determined the proper strategy.

Focus was shifted to Unit 2 which became the lead outage unit (i.e. first to return to service).

On May 16, 1996, PSE&G announced its intent to replace the Salem Unit No. 1 steam generators prior to the restart of the unit. The replacement was essentially complete by mid-1997.

By letter (LR-N96219) dated August 12, 1996 PSE&G notified the NRC that steam generator tube analysis, and testing on the old steam generators was being suspended.

In light of the commitment to replace the generators, further financial expenditures and additional man-rem burden on site personnel resulting from these activities was no longer warranted.

Because of the change in focus to Unit 2 as the lead outage unit, and the enormous work load associated with the expeditious replacement of the steam generators on Unit 9801130415 971230

  • PDR ADOCK 05000272 S PDR __ 1111111111111111111111111111111111111111
  • & & 2 7 8 c
  • The pl)\\*er is in your hands. 95-2168 REV. 6/94

. " ' Document Control Desk LR-N970756 2 DEC 3 0 1997 1, and since PSE&G had notified the NRC of the suspension of activities associated with the old Unit 1 steam generators, submittal of the LER was delayed until this date. Attachment PJD/tcp C Distribution LER File 3.7 Sincerely, A. C. Bakken Ill General Manager Salem Operations