ML18102A661

From kanterella
Revision as of 01:15, 12 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 96-011-00:on 960620,pressurizer Safety Relief Valves Were Found Outside of TS Tolerance.Caused by Minor Testing Instrument Error.Valves Were Refurbished & Successfully Retested to within TS tolerance.W/960719 Ltr
ML18102A661
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/19/1996
From: GARCHOW D F, HASSLER D V
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-96-011-02, LER-96-11-2, LR-N96206, NUDOCS 9612130194
Download: ML18102A661 (4)


Text

.

!3Y: PSE&G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JUL 191996 LR-N96206

u. s. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

I.ER 272/96-0.11-00 SA1£M GENERATING STATION -UNIT l FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 This Licensee Event Report entitled "Pressurizer Safety Relief Valves Found Outside of Technical Specifications limith is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR50.73(a)

(2) (ii). Attachment SORC Mtg.96-096 JMO/tcp c Distribution LER File 3 .:7 9612130194 960719 PDR ADOCK 05000272 S PDR The power is in )OUr hands. Sincerely, General Manager--Salem Operations ss-21d8 nev. 619'1 HRC FORM .,58 (4-651 :11-15-96

12:21PM l'llCLE..\R SER\! ICES-+ 208 526 2930;; 4r 6 U.S. N !!EAR REGULATORY COMMISSION OVEO BY OMB NO. 3*150-0104 EXPIRES 041341198 LICENSEE EVENT REPORT {LER) ESTll4ATED BlJRoeN PER RESPONSI!:

TO COMPl.Y WITH nilS MANDATORY INFORMATION COUECTIOH Rf'!ClJEST:

50.0 HRS..

l..ESSON8 u:AAN£0 ARE INCORPORATED INTO THE LICENSING PROCESS ANO FED 8ACJ< TO IHOUSTRY.

f'ORW.Allil COMMCH1'8 REGARDING BUROEN ESTIMATE TO THl! INFORMATION ANO ReCOROa MANAGEMENT BRANCH (T-4 F33}, U.S.

CCMMISSION, WAStttNQTON.

DC 206&6-0o01 ANO TO THC! PAPERWORK REDUCTION PROJECT (315G-0104).

oFFict: OF BUDGET, WAS41NGTON..

DC 2060&. FACILITY NAIUO (1) (See reverse for required number of digits/characters for each block) DOCKET NUMst;R (2) f'AOE ISi SALEM GENERATING STATION, UNIT 1 05000272 1 OF3 TITl.£(-4)

Pressurizer Safety Relief Valves Found Outside of Technical Specifications Tolerance.

EVENT DATE (5) 06 20 OPERATING MODE(9) POWER LEVEL (10) I HiUilG 96 LER NUMBER {8) REPORT DATE (7) OTHER FACILITIES INVOLVED (8) YEAR I I ReV1s1cN NUMSEA NUMeeA Salem Unil2 06000311 llllCIMTH OA't Te'IA IFACIUTTNAME DOCiu.1 HUMl:leR 96 011 00 07 19 96 fACIUlY NAME CCCIUff NUMBER 05000 THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 1 Q CFR §: (Check one or more) (11) 20.2201lDJ 20.2203 a)(2)(v) X 50,7S(a)(2)(1) 50.73(a)(2)(viii) 20.2203(a)(1) 20.2203(*)(3)(i)

S0.73(a){2)(JI) 50.73(a)(2)(x) 20.220S(a)(2)(1) 20.2203(11)(3)(11) 50.73(11)(2)(ili) 73.71 20.220S(a)(2)(1l) 20.2203(a)(4) 50, 73(a)(2)(1v)

OTHER w.22u3 a)(2)(ill)

S0.7S(a)(2)(v)

Speelfvln Abstractbalow or In Fonn306A 20.2203(a)(2)(*v) 50.36(cX:L}

50. 73(a}(2)(vil)

LICENSEE CONTACT FOR THIS LER (12) Teu:l'HONE HUMSER (lncilbda .Ate& Coda) Dennis V.Hassler, LER Coordinator 609-339-1989 COMPLETE ONE LINE F()R EACH COMPONENT FAILURE DESCRJBEO IN THIS REPORT (13) SYSTEM COMPONENT MANIJFACTIJRER REPORl'ABl.E TONPROS CAU8'1 COMPONliNT SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED !YES Ix INO SUBMISSION (ff yes, complete EXPECTED SUBMISSION DATE}. CA TE ( 15) ABSTRACT (Umlt to 1400 isp11c**.

i.e ** approximately 15 *ingle-apac:Od typewritten lines) (16) MONTH DAY REPORTABLi TONPRDS YEAR On June 20 1 1996 as found test results were received by PSE&G that identified one Pressurizer Safety Relief Valve test result was outside of the +/-one percent Technical Specifications allowable tolerance.

Subsequent testing identified two additional valves were also outside of the one percent tolerance.

The cause of the setpoint drift is the ability of the valves to consistently

maintain+/-

one percent tolerance during testing .following an operating cycle, 'and minor testing instrument inaccuracies

(+/-0.1 percent).

The valves were refurbished and successfully retested to within the Technical Specifications one percent tolerance.

This event is reportable in accordance with 10 CFR 73(a) (2) (i) (B), any condition

'prohibited by the plant's Technical Specifications.

..

  • BY: PSE&G NLCLEAR 208 526 5! 6 NRC FORM J66A-* U.S. NUCLEAR REGULA TORY COMMISSION . (A-96) FACILITY NAME (1) LICENSEE EVENT REPORT (LER) TEXT CONTINUATION DOCKET NUMBER 12-l LER NUMBER 16) PAGE Cl) Salem Generating Station, Unit 1 96 -011 -00 TEXT (tf more space la required, UH additional copies of NRC Form 366A) (17) PLANT AND SYSTEM IDENTIFICATION Westinghouse

-Pressurized Water Reactor Reactor Coolant System -Pressurizer Safety Relief Valves {AB/RV}*

  • Energy Industry Identification System (EIIS) codes and component function identifier codes appear as (SS/CCC) CONDITIONS PRIOR TO OCCURRENCE At the time of identification, Salem Units 1 and 2 were shutdown and defueled.

DESCRIPTION OF OCCURRENCE on June 20, 1996 as found test results were received by PSE&G that identified one Pressurizer Safety Relief Valve test result was outside of the +/-one percent Technical specifications allowable tolerance.

Subsequent testing two additional valves were also outside of the one percent tolerance.

Unit PSV Serial # Location As-Found Setpoint Deviation 1 RV-466-PSE lPRS Plus J -28 percent 1 RV-2-8010C-PNJ 1PR4 Plus 3.90 percent 2 RV-468-PSE 2PR4 Plus 1. 32 percent CAUSE OF OCCURRENCE The of the setpoint drift is a combination of contributing factors: The ability of the valves to consistently maintain +/-one percent tolerance during testing following an operating cycle. Minor Testing Instrument inaccuracies

(+/-0.1 percent) PRIOR SIMILAR OCCURRENCES In the past two years1 two LERs have addressed safety relief valves found outside of the Technical Specifications tolerance.

LER 272/95-005-01 addressed

  • eight _occurrences of pressurizer relief valves found outside tolerance.

The of this occurrence was minor testing instrument error, valve design limitations, and applied loads from the discharge piping.

1\LLLt..-\K NRC 366.A-.' .S. NUCLEAR REGULATORY COMJ41SSION FACILITY NAME (1) LICENSEE EVENT REPORT (LER) TEXT CONTINUATION DOCKETNUMBERl2)

LERNUMBER(S) 05000272 YEAA I Salem Generating Station, Unit 1 96 -01*1 00 TEXT (If more spac:a is required, use sddltlonal copies cf NRC Form 360A) (17) PRIOR SIMILAR OCCURRENCES (cont'd) PAGE (3) 3 OF 3 LER 272/95-026-01 addressed occurrences where Main Steam Safety Relief Valves were found outside of the TS tolerance.

The cause for this occurrence was ring setting adjustments without post adjustment setpoint testing and use of test equipment that was inaccurate.

SAFETY CONSEQUENCES AND IMPLICATIONS Previous analysis of the thermal hydraulic effects resulting from an increase in the setpoint tolerance of the Pressurizer Safety Valves from +/-one percent to +/-three percent is acceptable.

This analysis bounds two of the three failures identified in this LER. Preliminary analysis indicates a setpoint of plus four percent is acceptable.

If the final analysis fer the plus four percent tolerance results in a different a supplement to this LER will be issued. Based on these analyses, there were no safety consequences or implications involved as a result, of these valves exceeding the allowable tolerance.

the public health and safety was not CORRECTIVE ACTIONS 1. The valves were refurbished and successfully retested to within the Technical Specifications

+/-one percent tolerance.

2. The vendor procedure used to test the Salem Onits 1 and 2 pressurizer safety relief valves was revised in August 1994 to address industry concerns relative to setpoint drift. 3. A formal root cause evaluation is being completed.

The corrective actions identified in the root cause evaluation will be tracked in the Corrective Action Program. The effectiveness of the corrective actions will be established by the trending of future setpoint testing*performance.

NRC FORM 388A (4-95} l