|
---|
Category:Letter
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution ML19248C8702019-11-12012 November 2019 Cover Letter Transmitting Draft SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-09-06
[Table view] |
Text
TSI TSTFr TECHNICAL SPECIFICATIONS TASK FORCE A JOLNT 0W72)\[RS o'? OtIRZP A CV17-TY July 5, 2011 TSTF- 11-09 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Request to Revise Part 9900 Technical Guidance, "Operability Determinations
& Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety" On August 3, 2004, the NRC published a draft revision to NRC Inspection Manual Chapter (IMC) 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components." Following issuance of the draft IMC, representatives of licensees and the NRC met to discuss comments.
These comments were incorporated into Regulatory Issue Summary (RIS) 2005-20, "Revision to Guidance Formerly Contained in NRC Generic Letter 91-18, 'Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability"'
which was issued on September 26, 2005. NRC and Industry continued to meet to further improve RIS 2005-20, resulting in Revision 1 being issued on April 16, 2008. Revision 1 revised the guidance to clarify operability determinations involving American Society of Mechanical Engineers (AMSE) Code Class 2 and 3 piping.The industry has identified a significant inaccuracy in the Part 9900 Technical Guidance document.
Specifically, the Part 9900 Technical Guidance definitions for "specified function" and "specified safety function" are reversed between from the usage in the guidance document and from the usage in the Improved Technical Specifications definition of "Operability." The determination of Operability is the central principle in the proper use of Technical Specifications.
The Part 9900 guidance on Operability determinations is used by the NRC and the industry as a description of an acceptable process. The industry has addressed the inconsistencies in the definitions in training.
However, we believe it is important that the document be revised to be internally consistent.
Therefore, we request that the NRC revise the definitions of "specified function" and "specified safety function" in the Part 9900 technical guidance in accordance with the enclosure.
4 t~iL 11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation PWROG S OWNERS' GROUP Owners G° TSTF 11-09 July 5, 2011 Page 2 Should you wish to discuss this further, please contact us.Nonrm nJ. Stringfellow (PWROG/W)iJ. Seelmaon PR e William J. Steelman (PWROG/CE)
Roy A. Browning (BWROG)Wendy E. roft (PWROG/B&W) cc: Frederick Brown, Director, Division of Inspection and Regional Support, NRC Robert Elliott, Technical Specifications Branch, NRC Michelle Honcharik, Special Projects Branch, NRC Enclosure Enclosure Recommended Revision to NRC Inspection Manual Chapter (IMC) 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components" During the development of the Part 9900 guidance in 2005, the industry and the NRC spent considerable time ensuring that the phrases "specified function" and "specified safety function" were used correctly throughout the document.
In the last draft' reviewed by the industry and discussed in meetings held May 10th-12th, 2005, these terms were agreed on and defined as follows: "3.6 Functions This section differentiates the terms "specified function" (SF), "specified safety function" (SSF), and "necessary and required support function." 3.6.1 Specified Function A SF is a function performed by a SSC in the CLB. SFs are the-functions the SSC was designed to accomplish, as described in the UFSAR and other CLB documents.
3.6.2 Specified Safety Function The definition of operability states in part that "an SSC shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s)." Specified safety functions (SSF) are a subset of the set of SFs. In the context of this manual chapter, a SSF is a function performed by a SSC described in TS. Note that not all functions of TS SSCs are considered SSFs. For each licensee, the plant-specific SSF scope derives from information relied on by the licensee and the NRC when the TS were prepared, submitted, reviewed, and approved.
The SSC scope is intended to address design-basis events. For some plants, additional events beyond the scope of design-basis events (such as station blackout and ATWS), may have been included when the plant-specific SSF scope was established.
SSC specified safety functions(s) are usually stated in the Bases of the TS and the plant UFSAR. The primary sources for deciding whether a specified function is a specified safety function are the application and supplements submitted by the licensee and the requests for additional information and safety evaluations prepared by the NRC in the development of the TS.2" However, after the May 2005 meetings, the NRC decided to utilize the definitions in the existing Generic Letter 91-18 guidance and issued the Part 9900 guidance as final without additional industry input. The final version of the Part 9900 guidance states: "Specified Function/Specified Safety Function:
The specified function(s) of the system, subsystem, train, component, or device (hereafter referred to as system) is that specified safety function(s) in the CLB for the facility.
In addition to providing the specified safety function, a system is expected to perform as designed, tested and maintained.
When system capability is degraded to a point where it cannot perform with reasonable expectation or reliability, the system should be judged inoperable, even if at this instantaneous point in time the system could provide the specified safety function."'ADAMS Accession Number ML051520361, June 1, 2005.2 ADAMS Accession Number ML051520373, June 1, 2005.
Enclosure Recommended Revision to NRC Inspection Manual Chapter (IMC) 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components" The Generic Letter 91-18 guidance used the terms "specified function" and "specified safety function" from the definition of Operability in use before the issuance of the Improved Standard Technical Specifications (ISTS) in 1992. In that definition, the terms "specified function" and"specified safety function" were reversed firom the usage in the ISTS definition, which was the definition used when developing the Part 9900 technical guidance.
As a result, the definitions used in the published Part 9900 guidance are inconsistent with the use of the terms throughout the rest of the document.The definitions from the May 2005 meeting are consistent with the usage of the terms throughout the guidance document and also add needed clarify to the terms. The definitions will assist the NRC and licensees in identifying those features of an SSC that are necessary for the Operability of a system by identifying the plant-specific licensing basis to be considered.
The definitions are consistent with the content of Technical Specifications described in 10 CFR 50.36 and the NRC's Final Policy Statement on Technical Specifications Improvements at Nuclear Power Plants.Therefore we recommend the definitions of Specified Function and Specified Safety Function be changed to those shown above and as stated in the June 1, 2005 NRC draft (ML051520373).