IR 05000331/2011403

From kanterella
Revision as of 20:30, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000331-11-403(DRS), on 03/07/2011 - 03/11/2011; Duane Arnold Energy Center; Routine Security Baseline Inspection - Cover Letter
ML11109A145
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/15/2011
From: Richard Skokowski
Plant Support Branch II
To: Costanzo C
NextEra Energy Duane Arnold
References
IR-11-403
Download: ML11109A145 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 15, 2011

Mr. Christopher Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785 SUBJECT: DUANE ARNOLD ENERGY CENTER - NRC SECURITY BASELINE INSPECTION REPORT 05000331/2011403(DRS)

Dear Mr. Costanzo:

On March 11, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Duane Arnold Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 11, 2011, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49

Nonpublic Enclosure: Inspection Report 05000331/2011403(DRS) w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV M. Rasmusson, State Liaison Officer, State of Iowa A. Silakoski, Nuclear Fleet Security B. Kindred, Security Manager cc w/o encl: Distribution via ListServ