ML17209B176

From kanterella
Revision as of 16:58, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards New App Iv,Containing Original Photographs,To 810601 Brief in Opposition to Util Application for Subpoenas.W/O Encl Photographs
ML17209B176
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/02/1981
From: KUCIK G R
ARENT, FOX, KINTNER, PLOTKIN & KAHN
To: SMITH I W
Atomic Safety and Licensing Board Panel
References
ISSUANCES-A, NUDOCS 8106090329
Download: ML17209B176 (4)


Text

,,4r'ent, Iox.,Kintner,Plotkin8cKahn'Q'f-".-JUN081981tt~aroUtJtrcer stttrss~'01pFederalBarBuilding, 1815HStreet.Y.N'.4'ashington.

D.C.20006Tekphone:

(202)85r.6000Cable:ARFOXTdtx:AU692672ITT440266GeorgeR.Kucik(202)857-6084Oettt'11~g8&LightNo.2)June2,1981TheHonorable IvanW.SmithChairmanAtomicSafety6Licensing BoardU.S.NuclearRegulatory Commission Washington, D.C.20555IRe:IntheMatterofFloridaPowerCompany(St.Luc'ant,UnitDocketNo.5-89~A

DearJudge.Smith:

Yesterday wefiledabriefinopposition toFloridaPower&LightCompany's aoplication forsubpoenas inthisproceeding.

AppendixIVtothatbriefwasintendedtoconsistoftwophotographs.

Bymistake,however,theoriginalphotographs werenotincludedwithanyofthefiledcopies;instead,appendedtoalltwentycopieswerephotocopied impressions ofthephotographs.

Fortherecord,IhaveenclosedanewAppendixIVcontaining theoriginalphotographs.

Also,inthecoverpagetothatAppendixwehavecorrected atypographical error.Theword"from"inthethirdsentencehasbeenchangedto"fou".Acopyofthisletterandofthecorrected coverpagetoAppendix1Varebeingmailedtoeveryoneidentified onthecertificate ofserviceattachedtothebrief.Iapologize foranyinconvenience thatthisoversight mayhavecaused.Sincerely,

~+R.P~OneofCounselforPetitioners

"nclosures a7kI AppendixlVPagelAe'-'alviewofRRD'sresourcerecoveryplantshowingsixcoolingtowers(mid-foreground),

twostacksandfourelectro-staticprecipitators (left)..ourboilersandtwoturbogenerators areinthecentralstructures, withthestep-uptransformers andswitchyard to"heirright.The240kvinertielinerunsfromtheswitchyard, west(leftwards) betweenthecoolingtowersandstacks,thennorthtothestreet,theneast(rightwards) toFPGL'snorth-south TurkeyPointline(offpicture,toright).Acrossthestreet(background) isthenon-conforming 58thStreetlandfillduetobereplacedbytheresourcerecoveryplant.Page2-Theresourcerecoveryplant's240kvinter-tieline(left)standsreadytointerconnect withFPSL's240kvTurkeyPointline(right).

'0I~