,,4r'ent, I ox., Kintner, Plotkin 8c Kahn 'Q'f JUN 08 1981 tt
~ aroUtJtrcer stttrss~
'0 1p Federal Bar Building, 1815 H Street. Y.N'.
4'ashington. D.C. 20006 Tekphone: (202) 85 r.6000 Cable: ARFOX Tdtx: AU 692672 ITT440266 George R. Kucik (202) 857-6084 Oe tt t'11
~g 8
& Light No.
2)
June 2,
1981 The Honorable Ivan W. Smith Chairman Atomic Safety 6 Licensing Board U. S. Nuclear Regulatory Commission Washington, D.C.
20555 I
Re:
In the Matter of Florida Power Company (St.
Luc'ant, Unit Docket No.
5 89~A
Dear Judge. Smith:
Yesterday we filed a brief in opposition to Florida Power
& Light Company's aoplication for subpoenas in this proceeding.
Appendix IV to that brief was intended to consist of two photographs.
By mistake,
- however, the original photographs were not included with any of the filed copies;
- instead, appended to all twenty copies were photocopied impressions of the photographs.
For the record, I have enclosed a new Appendix IV containing the original photographs.
Also, in the cover page to that Appendix we have corrected a typographical error.
The word "from" in the third sentence has been changed to "fou ".
A copy of this letter and of the corrected cover page to Appendix 1V are being mailed to everyone identified on the certificate of service attached to the brief.
I apologize for any inconvenience that this oversight may have caused.
Sincerely,
~+ R.P ~
One of Counsel for Petitioners
- "nclosures
a7 k
I
Appendix lV Page l Ae'-'al view of RRD's resource recovery plant showing six cooling towers (mid-foreground),
two stacks and four electro-static precipitators (left).
.our boilers and two turbogenerators are in the central structures, with the step-up transformers and switchyard to "heir right.
The 240 kv in ertie line runs from the switchyard, west (leftwards) between the cooling towers and stacks, then north to the
- street, then east (rightwards) to FPGL's north-south Turkey Point line (off picture, to right).
Across the street (background) is the non-conforming 58th Street landfill due to be replaced by the resource recovery plant.
Page 2
The resource recovery plant's 240 kv inter-tie line (left) stands ready to interconnect with FPSL's 240 kv Turkey Point line (right).