MONTHYEARML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16196A0652016-07-0909 July 2016 Part 21 Report - Nonconformance on Struthers-Dunn Relay for Psge Nuclear LLC ML16162A6792016-06-0808 June 2016 Part 21 Report - Nonconformance on Struthers-Dunn Relay for PSEG Nuclear LLC ML16139A8312016-05-13013 May 2016 Part 21 Notification - Potential Defect Applicable to Hytork XL1126 Pneumatic Actuators ML16126A1112016-04-29029 April 2016 National Technical Systems (Nts) Request for Extension, for Potential Part 21 on Safety Clip, Siemens Part Number 401-158 ML16098A4452016-03-22022 March 2016 Part 21 Notification - Sense and Transfer Module Resistive Short ML16112A2102016-03-14014 March 2016 National Technical Systems - Potential Part 21 on Siemens 401-158 Safety Clip, Per Wolf Creek, Salem, and Arkansas Nuclear One ML15146A0222015-05-0707 May 2015 Qualtech Np - Potential 1O CFR Part 21 Notification on Struthers Dunn Relays ML15134A0182015-05-0707 May 2015 Part 21 Report Regarding Struthers Dunn Relays with Contact Resistance Greater than One Ohm ML15089A4352015-03-27027 March 2015 Part-21 Notification - Sense and Transfer Module Resistive Short ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14197A2812014-07-15015 July 2014 Part 21 Report - Potential Failure of Reactor Coolant Pump Turning Vane Bolts ML14197A2742014-07-14014 July 2014 Notification of the Potential Existence of Defects Pursuant to 10CFR Part 21 ML14113A3702014-04-18018 April 2014 Part 21 - Thomas and Betts Printed Circuit Boards ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML14085A0132014-03-19019 March 2014 Part 21 Report Re Defects & Non-Compliance of Thomas and Betts Printed Circuit Boards in Which the Power Supplies Incorrect Strap Installed on the Trasformers of Cyberex P/N ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12363A0472012-12-10010 December 2012 Part 21 Report Re Failure to Comply with Certain PSEG Specifications as Required by PSEG Purchase Order ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12003A2242011-12-22022 December 2011 Baldor Electric Co. Notification of Nuclear Nonconformance Event No. 47425 ML11318A0232011-11-10010 November 2011 Notification of Part 21 Report Re Motor Power Leads Undersized ML11228A0862011-08-0101 August 2011 Submittal of 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0102, Rev. 0, Air Start Motors with Friction-Clutch Inertia Drives ML11136A2172011-05-12012 May 2011 U-Rings Fabricated with Incorrect Material ML1027701052010-09-29029 September 2010 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40 ML1027704172010-09-29029 September 2010 Dresser Masoneilan, 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40 ML1011002252010-04-14014 April 2010 United Controls International, Faulty Modulation Index Control Circuit Board Used in a Power Supply ML0930304542009-10-23023 October 2009 Hilti, Inc., Potential Delivery of Nonconforming Washers, and Affected Utilities or Plants Are Pilgrim, Brunswick, Arizona Public Service, and Waterford 3 ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0733103812007-11-21021 November 2007 Notification of Potential Part 21 Report Welding of Safety Related Components ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0706402532007-02-27027 February 2007 Notification of Potential Part 21 Re Chiller Copper Sleeve Cracks Leading to Slow Refrigerant Discharge ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0626204942006-09-15015 September 2006 Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed LR-N04-0475, 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 22004-11-0101 November 2004 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 2 LR-N04-0376, 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station2004-08-20020 August 2004 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station LR-N04-0377, 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms2004-08-20020 August 2004 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms 2017-03-20
[Table view] |
Text
A CANBERRA December 10, 2012 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Notice of Failure to Comply Reported Under 10 CFR Part 21.21 PSEG Purchase Order 4500639089 To Whom It May Concern: In accordance with 10 CFR 21, this letter is to notify the Nuclear Regulatory Commission of a failure by Canberra Industries, Inc. to comply with certain PSEG specifications as required by a PSEG purchase order.On October i5, 20.12, during review of routine testing of its Model GP lOOC Gamma Probe, Canberra identified a failure to comply With certain PSEG specifications as more fully described in the attached Interim Report. Subsequent testing of the probe determined that certain PSEG specifications as specified in the referenced PSEG Nuclear Purchase Order were not met.Canberra has determined.that one power plant, the PSEG Salem Generating Station, is using this product in a safety-i'elated ap*lfication.
On December 7, 2012, Canberra notified PSEG of the results of this test.A copy of thisnotification is attached.Questions or concerns may be forwarded to the address below.Since Jo GTa urro, VicePreside t and General Counsel Canberra Industries, Inc.800 Research Parkway Meriden, CT 064.50 itamburro@canberraor.m 203-639-2187 Attachments:
Copy Notification letter to PSEG Copy of Interimi Notice CANBERRA 800 Research Parkway -Meriden, Connecticut 06450 -Tel. 203-238-2351
-Fax 203-235-1347 Interim 10 CFR Part 21.21 report December 7, 2012 1. Name and address of the individual or individuals informing the Commission.
John G. Tamburro Vice President and General Counsel Canberra Industries, Inc.800 Research Parkway Meriden, CT 06450 2037639-2187
- 2. Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.Facility:
Salem Unit 2 Basic Component:
Area Radiation Monitors 2R2, 2R7, 2R1OA and 2R1OB 3. Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.Canberra Industries, Inc.800 Research Parkway Meriden, CT 06450 4. Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.During review of data from updated qualification testing of the GP100 series detectors to IEC 60532:2010 it was determined the GPIO0 series of probes did not meet the specifications for angular and energy response stated in S-2-RM-CDS-0482 Rev. 1. Specifically:
Section 4.10 states the radiation level reading will not vary more than +/- 10% from the average value when the detector is exposed to a point source from any direction.
This criteria exceeds the design parameters of the probe on the axial plane. The probes directional response is limited to +/- 45 Degrees on axial plane from the mid point and +/- 90 degrees on the radial plane. The maximum bias outside of directional window is -20% radially and -80%axially.Section 4.12 states the detector response must be proportional to the actual gamma radiation level within 20% for energies between 100 KeV and 2.5 MeV. The detector shall have +/-50%accuracy for gamma radiation between 50 KeV and 100 KeV. This criteria exceeds the design parameters of the probe. The GP100 probes high range detector's accuracy is +/- 70% at 65 KeV normalized to Cs-137.
- 5. The date on which the information of such defect -or failure to compiy' was obtained.October 15, 2012 6. In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.Area Radiation Monitors 2R2, 2R7, 2R1OA and 2R1OB 7. The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.None 8. Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
The licensee should review the installation of the GP100 probes as specified in the technical manual as to the orientation for proper response.The licensee should review the calibration procedure for the probe to ensure the calibration energies are appropriate given the energy response characteristics described in the technical manual.9. In the case of an early site permit, the entities to whom an early site permit was transferred.
Not applicable A CANBERRA December 10, 2012 PSEG Nuclear, LLC Manager -Regulatory Assurance Mail Stop S05 PO Box 236 Hancocks Bridge, NJ 08038
Subject:
Notice of Failure to Comply as reported under 10 CFR Part 21.21 Re: PSEG Nuclear, LLC Contract / Purchase Order 4500639089 To Whom It May Concern: In accordance with 10 CFR 21, this letter is to notify PSEG Nuclear, LLC, of a failure to comply with certain PSEG specifications required by the referenced purchase order.On October 15, 2012, during review of routine testing of its Model GP IOOC Gamma Probe, Canberra Industries, Inc. (Canberra) identified a failure to comply with certain PSEG specifications as more fully described in the attached Interim Report. Subsequent testing of the probe determined that certain PSEG Nuclear specifications (as specified in the PSEG Nuclear Purchase Order referenced above), were not met. Please review the attached Interim Report to determine the impact on PSEG Nuclear operations.
Canberra has also notified the US NRC of this failure to comply.Canberra stands ready to support PSEG with any required actions. Questions or concerns may be forwarded to the address below.Sincerely~r ice resi t and General Counsel anberra In ustries, Inc.800 Research Parkway Meriden, CT 06450 jtamburro(ccanberra.com 203-639-2187 Attachments:
Copy of Interim Report CANBERRA 800 Research Parkway -Meriden, Connecticut 06450 -Tel. 203-238-2351
-Fax 203-235-1347