Category:Letter
MONTHYEARIR 05000424/20243012024-11-19019 November 2024 Operator Licensing Examination Approval 05000424/2024301 and 05000425/2024301 ML24313A0632024-11-14014 November 2024 Integrated Inspection Report and Assessment Follow-Up Letter 05200025/2024003 and 05200026/2024003 ML24305A1662024-11-0606 November 2024 Vogle Electric Generating Plant, Unit 3 - Summary of Conference Call Regarding the Fall 2024 Steam Generator Tube Inspections NL-24-0217, License Amendment Request: Source Range Neutron Flux Doubling Function Applicability2024-11-0101 November 2024 License Amendment Request: Source Range Neutron Flux Doubling Function Applicability NL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23188A1512023-08-0909 August 2023 Round 2 RAIs for LAR 22-002 TS 3.8.3 Inverters-Operating, Completion Time Extension ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23065A0612023-03-0303 March 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 14 - Vogtle - AST, TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML23006A0882023-01-0606 January 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - Accident Source Term (Ast), TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML22348A0332022-12-13013 December 2022 NRR E-mail Capture - for Your Action - RAI - Vogtle, Unit 2 - Steam Generator Tube Inspection Report (L-2022-LRO-0120) ML22192A1042022-08-0101 August 2022 Acceptance of Requested Licensing Action Amendment Request Application to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel with Request for Additional Information ML22157A0902022-06-0606 June 2022 NRR E-mail Capture - RAIs - Vogtle, Unit 1 - Refueling Outage (RFO) 1R23 Steam Generator (SG) Tube Inspection Report ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22026A3942022-01-26026 January 2022 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21350A1032021-12-16016 December 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21321A3762021-11-15015 November 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21033B1072021-02-0202 February 2021 NRR E-mail Capture - RAI - Vogtle Unit 1 - SG Report (L-2020-LRO-0059) ML20338A1512020-12-0303 December 2020 NRR E-mail Capture - RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20325A0432020-11-20020 November 2020 NRR E-mail Capture - for Your Review - Draft RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20297A3052020-10-22022 October 2020 NRR E-mail Capture - RAIs for Vogtle Relief Request - EPRI Report (L-2020-LLR-0109) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML19263A6432019-09-19019 September 2019 NRR E-mail Capture - RAI - Vogtle End State License Amendment Request (LAR) to Revise the Technical Specifications (Tss) for Vogtle, Units 1 and 2 (L-2019-LLA-0148) ML19156A1872019-06-0505 June 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Vogtle Unit 2 Core Operating Limits Report, Cycle 21 ML19105B1632019-04-15015 April 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Voglte TSTF-412 Adoption LAR (L-2018-LLA-0731) ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18236A4452018-08-30030 August 2018 Review of Response to RAI License Amendment Request for Approval to Utilize the Tornado Missile Risk Evaluator to Analyze Tornado Missile Protection Non-Conformances ML18227A0222018-08-15015 August 2018 Notification of Inspection and Request for Information ML18225A3362018-08-13013 August 2018 NRR E-mail Capture - Request for Additional Information Regarding Relief Request VEGP-ISI-RR-03 ML18197A0602018-07-13013 July 2018 Us NRC Final RAI No. 1 for Vogtle 3 and 4 LAR-18-015, Fire Protection System Non-Safety Cable Spray Removal ML18197A1882018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18197A1052018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 1 on Vogtle 3 and 4 LAR-17-043, Containment Pressure Analysis ML18192C0782018-07-11011 July 2018 RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4 ML18192B7692018-07-11011 July 2018 Us NRC Draft Request for Additional Information (Draft RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18136A4972018-06-0101 June 2018 Request for Additional Information, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18109A1152018-05-0101 May 2018 Request for Additional Information ML18079A9572018-03-28028 March 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit 2024-07-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 1, 2013
Mr. Tom E. Tynan Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Tynan:
On March 11-15, 2013, the NRC will perfo rm a baseline Occupational and Public Radiation Safety inspection at the Vogtle Electric Generating Plant, (NRC Inspection Procedure 71124.01, Radiological Hazard Assessment and Exposure Controls, 71124.08, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation and 71151 Performance Indicator Verification (Occupational and Public Radiation Safety Cornerstones). In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be George Gunn at (706) 826-3596 of your organization that the material be available for review by March 1, 2013. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Ruben Hamilton at (404) 997-4672 (ruben.hamilton@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0044, 3150-0014, 3150-0011, and 3150-0008. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document display s a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document T. Tynan 2 Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-424, 50-425 License No. NPF-68, NPF-81
Enclosure:
Pre-Inspection Document Request
cc: (See page 3)
ML13037A168 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII: DRS/PSB1 RII: DRS/PSB1 SIGNATURE /RA/ /RA/ NAME R. HAMILTON B. BONSER DATE 2/1/2013 2/1/2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO T. Tynan 3 cc: C. Russ Dedrickson Fleet Support Supervisor
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution W. L. Bargeron
Plant Manager Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. G. Bost
Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
N. J. Stringfellow Licensing Manager
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Paula Marino Vice President Engineering
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. A. Lynch Vice President Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
M. J. Ajluni Nuclear Licensing Director
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. D. Honeycutt Regulatory Response Supervisor
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution Mark Rauckhorst Site Vice President Vogtle Units 3 and 4 Southern Nuclear Operating Company Electronic Mail Distribution cc (continued): See page 4
T. Tynan 4 cc (continued): S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA 30830
Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental
Control Electronic Mail Distribution
Division of Radiological Health TN Dept. of Environment & Conservation
401 Church Street Nashville, TN 37243-1532
Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control 2600 Bull Street
Columbia, SC 29201 Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Chuck Mueller
Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson
Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution
Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution
Office of the Attorney General 40 Capitol Square, SW Atlanta, GA 30334
Office of the County Commissioner Burke County Commission Electronic Mail Distribution Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600
Amy Whaley Resident Manager Electronic Mail Distribution
Enclosure Pre-Inspection Document Request Licensee: Vogtle Electric Generating Plant
Inspection Dates: March 11-15, 2013
Documents Due to Region by: March 1, 2013 Inspection Procedures: 71124.01 Radiological Hazard Assessment and Exposure Controls
71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
Lead Inspector: Ruben Hamilton Senior Health Physicist US NRC Region II (404) 997-4672
ruben.hamilton@nrc.gov
Note: Unless specified otherwise, the current version of these documents is expected. Electronic media is preferred if readily available. (The preferred file format is MSWord, or searchable ".pdf" files on CDROM). Note that the inspectors cannot accept data provided on USB or "flash" drives due to NRC IT security policies. To the extent possible, please organize the information in the order shown below. Experience has shown that a poorly organized CD leads to a less efficient inspection and places additional burden on licensee staff. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector. During the inspection, the inspectors may request additional documents. If the licensee wishes to use an electronic document service such as CERTRAC or a SharePoint portal the inspectors will try to accommodate for the documentation requested on site. The initial documents should not require an internet connection to be reviewed.
We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review. If any of the requested information is too burdensome to provide electronically or as hard copies, simply indicate that the requested material is available for onsite review by the inspectors.
If you have any questions, please call Ruben Ha milton at (404) 997-4672. Thank you in advance for your efforts in putting together this material.
Assistance Requested During On-Site Inspection
- 1. Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings.
2 2. Health physics assistance in plant walk-downs assessing radiological hazards and exposure controls, e.g. verifying the posting and locking of entrances to locked-high radiation areas and very high radiation areas, spent fuel pool controls, and radioactive material storage areas. Health physics and system engineer assistance in plant walk-downs and discussion of large personnel monitoring and/or installed radiation monitors and systems.
General Information Needed
- 1. Plant Management, Radiation Protection, and Chemistry organizational charts with contact numbers. 2. Electronic copy of UFSAR chapters 11 and 12 (radwaste and radiation protection).
- 3. Corrective action program procedure.
- 4. Outage schedule of major activities (Gantt chart if available). 5. Audits and self-assessments performed since the last inspection that encompasses the areas of (1) radiation protection, (2) access controls, and (3) ISFSI. 6. List of radiation protection procedures, including title and number.
71124.01 - Radiological Hazard Assessment and Exposure Controls
- 1. List of active radiation work permits, including those specific to outage activities, with their administrative limits, electronic dosimeter dose rate limit, and dose limit. 2. Procedures related to HP controls (e.g., Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.). 3. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm follow-up, etc.). 4. List of Nationally Tracked Sources and any change-of-ownership transactions.
- 5. Inventory list of all sealed sources stored onsite.
- 6. List of all non-fuel items stored in spent fuel pool. 7. HP plan for monitoring and controlling hazards associated with potential fuel leakers during the upcoming outage. 8. Most recent self-assessment or audit covering hazard assessment and exposure controls. 9. List of NCRs related to HP controls (e.g., radworker error, HP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) issued since March 2012. This should be a list of corrective action documents containing an AR number and brief description, not full NCRs. 71124.08: Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
- 1. Site and corporate procedures associated with radioactive waste processing and handling, storage, and transportation of radioactive material (RAM), including:
- a. Storage and handling of RAM including non-RCA and satellite RCA locations.
- b. Waste stream mixing, sampling, concentration averaging, and use of scaling factors. c. Monitoring impact of long-term storage (e.g. buildup of gases produced by waste decomposition, chemical reactions, container deformation, loss of container integrity, re-release of free-flowing water).
3 d. Transferring of resin and/or sludge into shipping/disposal containers; dewatering and waste stabilization. e. Preparing packages and documentation for shipping radioactive materials. 2. List of RAM storage areas, including satellite RCAs. 3. Process Control Program.
- 4. List of changes to the radioactive waste processing systems since January 2011, and copies of the associated 50.59 screening documentation.
- 5. Log of radioactive material shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since March 2012, (The inspectors will select 3-5 packages to review in detail). 6. List of NCRs generated since March 2012, related to radioactive solid waste processing and packaging, handling, storage, and shipping of radioactive materials.
Inspector Contact Information Mr. Ruben Hamilton (404) 997-4672
ruben.hamilton@nrc.gov Mailing Address US Nuclear Regulatory Commission, Region II Attention: Mr. Ruben Hamilton
245 Peachtree Center Ave., N.E
Suite 1200
Atlanta, GA 30303