MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20128G1661996-10-0303 October 1996 Summarizes 960924 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Preliminary Responses to Staff RAI Concerning Request to Change EALs for TMI-1.List of Participants & Copy of Preliminary Response to RAI Encl 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months 1999-09-29
[Table view] |
Text
'Q
[ [ DISTRIBUTION
[ f Docket Files 55-07159 ,
Docket Files 55-06120 j D JAN 0 41985 TMurley, RI i RMartin, RIV l RCapra l LWiens s MEMORANDU!iFOR: William T. Russell, Deputy Director WRussell -
Division of Human Factors Safety NRR HThompson FROM: Robert A. Capra Technical Assistant -
Division of Systems Integration, NRR
SUBJECT:
SLM1ARY OF JOINT OI/NRR INTERVIEW WITH JOHN J. 8LESSING The purpose of this memorandum is to document the results of the joint OI/NRR interview with Mr. John J. Blessing. The purpose of the interview with Mr. Blessing was to either confirm or refute statements made by Mr. Raymond R. Booher during his November 15, 1984 interview with OI/NRR. The interviews of both individuals dealt with the subjects of Reactor Coolant System (RCS) leak rate surveillance testing irregularities at THI-2 during the period September 30, 1978 through the date of the accident, March 28, 1979 and a I breach of security incident that took place at THI-2 on July 13, 1979. l During that time frame, Mr. Bocher and Mr. 31essing were Control Room '
Operators (CR0s) at TMI-2 assigned to the same shift.
The interview with Mr. Blessing was held in the Office of Investigations Field Office, Region I. The interview was conducted by Mr. Keith
' Christopher, Director, Office of Investigations, Region I and me. Just prior to commencement of the interview, Mr. Christopher was infomed by Mr. Bart Gephart of the law firm Killian and Gephart, that while he had represented Mr. Blessing in previous interviews and investigations by the NRC and the Department of Justice, he no longer represented Mr. Blessing and would not be present at the time of the interview. At the outset of the interview, Mr. Blessing was questioned concerning his desire to have legal counsel present during the interview. Mr. Blessing confirmed that he had dismissed the law finn of Killian and Gephart as his counsel on the previous afternoon and stated that he wished to proceed with the interview without the benefit of legal counsel. A complete sumary of his interview is provided below. s Mr. Blessing was advised that the primary purpose of the interview was to ascertain if he was aware of any information that would indicate the level of involvement of Mr. Raymond R. Booher in the falsification of leak rate surveillance rate test data at TMI-2 prior to the accident on March 28, 1979.
Mr. Blessing was not placed under oath for this interview.
NOTE: This memorandum and enclosures discuss infonnation which is the subject of an ongoing OI investigation. This memorandum and enclosures may not be disseminated outside the NRC without coorlination with NRR and the permission of the EDO or the Director.
- 01. Internal access and distribution should be on a "need to know" oasis. ,
' W _ ...................
................gggsa;gaggggggag,o ...............
................................................................................e,.....................,....e.9.9...........,...................
ce re:u m no,somacu oa o
.s......
OFFICIAL
. w , ,..- - ,. . - -. _ .,_
RECORD COPY *u5** 2"*-'
~.-aw- -
'4 O g 9 4 W &
l William T. Russell ,
JAN 4 1983 l
Hr. Blessing is currently employed as an Engineering Specialist with United , ' I Energy Service in Reading, Pennsylvanta. He stated that was previously employed with Met-Ed from October 1976 until he terminated his employment in ,
May 1981. -He was a Control Room Operator (CRO) at TMI-2 from November 1978 -
urtti May 1981; however, Mr. Blessing did not receive his Reactor Operator's license until April 1980. Consequently, during the period under investi- l gation, Mr. Blessing was assigned dutfes as a CR0 trainee. While he was in a trainee status, he was assigned to Shift 'E
- Shift "E" consisted.of the followfng indfyiduals:
SHIFT E Shift Supervisor: Bernte Smith Shift Forenan: Ken Hoyt CRO: Raymond Sooher CRO:' Harold Hartman CR0 Trainee: John Blessing
- Mr. Blessing was shown a copy of the " Report of Interview" of his April 10
' 1980 intervtew with IE and CIA. Mr. Blessing confirmed that the infonution contained in the report was true and correct to the best of his knowledge (SeeEnclosure1).
Mr. Blessing stated that leat rate surveillance tests were routinely done on -
each shift. On many occasions, tests had to be run several times before results meeting the acceptance criterf a of the Technical Specifications could be obtained. Tests that did not meet the acceptance criterfa were thrown away.
He confirmed that it was his belief that leak rate tests were discarded in order to preclude the NRC from seeing leak rate tests that did not meet the acceptance criterf a. He was asked if this policy originated as a result of the October 18, 1978 incident during which an NRC inspector found several unacceptable results lying in the control room and asked why they had net entered the Action Statement of the Technical Specifications.
Mr. Blessing stated that he did not have (f rsthand knowledge of the incident since he did not start as a CR0 trainee untti November 1978; however, he s believes thrown away.
that was the reason why unacceptable leak rate tests continued to be He stated that it was more difficult to get acceptable leak rate test results as the date of the accident approached. He believed this was due to problems with the computer program not properly accounting for the higher identified leakage to the pressurizer Reactor relief valves. Coolant Drain Tank (RCDT) caused by the leaking He believed there was a problem with the computer program since they were able to get satisfactory leak rate test results with hand calculations. He did not know why the leak rate test records that were retained did not contain these hand calculations. He thought they may have been thrown ~~ out once a satisfactory computer-generated leak rate test was obtained.
3,.
can) .................. .....................
crz:w m no,.omnewouo
--. - . . . . . . . . , .. . . .. . .,._FFICI O A L R ECO R D CO PY
_ _ _ . --~__...,.-_. .- -.===.ar===
wo --
W G W O f William T. Russell JAN 4 1985 He was asked about his interpretation of the Tcchnical Specification associ . '
atedwith.ReactorCoolantSystem(RCS) leakage. Mr. Blessing stated that he 1 believed they had 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the last good leak rate test until another I leak rate test was required. He stated he did not think that the Technical -
Specifications required them to enter the Action Statement whenever they received a bad leak rate test result. Mr. Blessing could not recall ever being directed to enter the Action Statement by his supervisors due to unidentified leakage exceeding 1 gpm.
Mr. Blessing was asked to describe how leak rate tests were perfomed on shift. He stated it was a simple matter of inserting the correct call letters into the computer. He said it was the responsibility of the individual who started the test to ensure the other members of the shift were advised a leak rate test was in progress. Mr. Blessing stated, however, that the comunications on his shift were particularly bad. He stated his shift did not work well together. There was very little downward connunications from their Shift Foreman and Shift Supervisor. He said while he was very good friends with Mr. Hartman, including socializing and car-pooling together, neither of them got along with Mr. Socher. He stated Mr. Booher did not get along with most of the other CR0s. He said Mr. Bocher was the type of individual who would "ask a lot of stupid questions" to CR0 trainees who were trying to get system checkouts from him. Consequently, people avoided Mr. Booher and would go to someone like Mr. Hartman. He stated because of his poor working relationship with Mr. Bocher, he performer most evolutions under Mr. Hartman's direction. .
When asked about hydrogen additions to the MUT during leak rate tests, Mr. Blessing stated that he routinely added hydrogen in order to help get acceptable leak rate test results. He stated that this was a common practice, although he did not personally witness other operators except Mr. Hartman perfoming these additions. He did not personally believe that hydrogen additions worked; however, he was told it would help. He stated that he could not recall ever having a discussion with Mr. Booher regarding the addition of hydrogen to the make-up tank in order to manipulate leak rate test results. He stated thet he had also never personally witnessed Mr. Booher make such an addition; however, he stated based upon the fact it
' was comon knowledge among operators, that he could not imagine that Mr. Bocher did not know these actions were going on.
Mr. Blessing combination of Mr.was thenMr.
Bocher, shown Hartman sumary and Mr.listing Blessing of(See leakEnclosure rate tests 2 . involving)al i
It was pointed out that several of the tests involved unrecorded water additions during times leak rate tests were in p gress. In some cases it appeared that this water may have been " jogged" 1.e., small amounts of water l
! addedslowlyoverthetestperiod). Mr. Blessing stated that he never l intentionally added water to the make-up tank in an effort to manipulate leak rate testsv Therefore, he could not confirm that Mr. Bocher had used this method as an attempt to alter leak rates. He stated that due to the poor
- > .................. ..................... ..................... ..................... ..................... .................... .................. I me c:w s o no,.c .cw ouo OFFICIAL RECORD COPY
1 l
l k
William T. Russell -4 JAN 4 1985'
\
corr::unications on their shift, it was possible that water could be added and &
the individual running the test was not aware of the addition. He could
~
neither recall ever having a discussion with Mr. Sooher mgarding adding l water to alter leak rate test results nor recall having witnessed Mr. Bocher._
make such an addition. He stated that as the date of the accident approached, they needed to add large amounts of water each shift due to the increased leakage from the pressurizer relief valves. He stated it was quite possible that unrecorded water additions could have been made at that time.
i l
l l
l l
l l
l l
l vnTi>................... ..................... ...................... ..................... .......,............. ..................... ..................
JO%Cah................... ..................... ..................... ..................... ..................... ..................... ..................
one) .................. ..................... ..................... ..................... ..................... .................... ...................
=c ac:a m uo,eo. unew oua
..u.m..',
OFFICIAL RECORD COPY *u5 "ol'"*dI m .
% e4+O= -
N
W [ [ _
[ .
William T. Russell JAN 4 1985 .
. s
~
Originalsigned by Robert A. Capra, Technical Assistant Division of Systems Integration
, Office of Nuclear Reactor Regulation
Enclosures:
- 1. Report of Interview of J. Blessing on 4/10/80
- 2. Sumary of Leak Rate Data
- 3. Sworn Statement of J. Blessing dated 12/14/84 cc: K. Christopher O
G -
l I
i DW/TMIH2/ BLESSING ENCL I o -
. E.H. .F..........
- h. . .R E..................... ...................... ..................... ..................... ..................... .................
- "**) . RCA RtA ;M1... .................. . .. ..................... ..................... ..................... ..................... .................
ca's) 1. /. .i. /.8. 5. . ......................
ce r::e m no,eo uncu os.o OFFICIAL RECORD COPY
-- . m . m.e.., mn. mma .u.m. n . ..