Text
(
PDIL
/pa Kfcg'o, UNITED STATES E"
~%
NUCLEAR REGULATORY COMMISSION h
C WASHINGTON, D. C. 20555
\\
]
May 16, 1986 James L. Kelley, Chairman Jerry R. Kline Presiding Board Presiding Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Glenn O. Bright Presiding Board U.S. Nuclear Regulatory Commission Washington, DC 20555 In the Matter of INQUIRY INTO THREE MILE ISLAND UNIT 2 LEAK RATE DATA FALSIFICATION
/
Docket No. LRP
Dear Judges:
Enclosed is a memorandum dated April 1, 1986 for the Commission entitled, "Results of NRR's Investigation and Evaluation of Ten Licensed Operators Involved in TMI-2 Preaccident Leak Rate Testing Irregularities."
The memo-randum, along with its 17 enclosures, documents the Staff results of the joint OI/NRR investigation into the involvement of ten individuals in TMI-2 preaccident leak rate testing irregularities.
At the Board's request, informa-tion in the memorandum and its enclosures relating to the current performance of individuals and the Staff's recommendations regarding enforcement action, if any, against individuals Iths been deleted from the enclosed copies because such information is outside the scope of this hearing.
In addition, informa-tion relating to one individual's possible involvement in a breach of security incident at TMI-2 in 1979, which is entirely unrelated to leak rate testing but which was investigated at the same time, also was deleted at the Board's re-quest.
(In some inctances, portions of pages relating to the above-identified subjects were deleted, while in other instances, entire enclosures relating solely to one or more of these subjects were deleted.)
Although the deletions of irrelevant information, described above, were made at the Board's request for the use of the Staff's report in the leak rate hear-ing, such deletions are not otherwise required prior to the public release of the report.
Certain portiens of the report, however, should be protected from public disclosure pursuant to the Privacy Act,10 C.F.R. Part 9, and 10 C.F.R. 5 2.790(a).
Therefore, the Staff is making available to the public the entire report except for those deletions required by the Privacy Act and the Commission's regulations.
A copy of the report with only the " Privacy Act" deletions will be placed in the Commission's Public Document roora where it 8605270085 860516 PDR ADOCK 05000320 P
PDR A
will be available to the public (including "thT[ parties) for inspection and copying.
Also enclosed is the Staff's technical analysis of the individual leak rate tests, entitled "NRR Evaluation of TMI-2 Reactor Coolant System Leak Rate Tests Performed 09/30/78 to 03/28/79,"
tion worksheets.
along with the supporting test evalua-Finally, also enclosed is a September 20, 1985 memorandum from William T.
Russell to Harold R. Denton entitled "Stier Report on TMI-2 Leak Rate Test-ing. "
This docutient compares and contrasts the results of Staff's technical evaluation of individual leak rate tests with those of Mr. Stier.
The release of the enclosed documents has been authorized by the Director of the Office of Investigations and the Executive Director for Operations.
The OI Report of Investigation will be provided under separate cover.
Sincerely,
(
R
/
ack R. Goldberg y
eputy Assistant Chief IIcaring Counsel
Enclosures:
As stated cc w/ encl: Parties to the Leak Rate Hearing Edwin 11. Stier, Esq.
l
f POIL o
' UNITED STATES E"
NUCLEAR REGULATORY COMMISSION
~
o
(
WASHINGTON, D. C. 20555 o
E 4
,o 9
May 16, 1986 s
James L. Kelley, Chairman Jerry R. Kline Presiding Board Presiding Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Glenn O. Bright Presiding Board U.S. Nuclear Regulatory Commission Washington, DC 20555 In the Matter of INQUIRY INTO THREE MILE ISLAND UNIT 2 LEAK RATE DATA FALSIFICATION Docket No. LRP
Dear Judges:
Enclosed is a memorandum dated April 1, 1986 for the Commission entitled, "Results of NRR's Investigation and Evaluation of Ten Licensed Operators Involved in TMI-2 Preaccident Leak Rate Testing Irregularities." The memo-randum, along with its 17 enclosures, documents the Staff results of the joint l
OI/NRR investigation into the involvement of ten individuals in TMI-2 preaccident leak rate testing irregularities.
At the Board's request, informa-tion in the memorandum and its enclosures relating to the current performance of individuals and the Staff's recommendations regarding enforcement action, if any, against individuals has been deleted from the enclosed copies because such information is outside the scope of this hearing.
In addition, informa-tion relating to one individual's possible involvement in a breach of security incident at TMI-2 in 1979, which is entirely unrelated to leak rate testing but which was investigated at the same time, also was deleted at the Board's re-quest.
(In some inctances, portions of pages relating to the above-identified subjects were deleted, while in other instances, entire enclosures relating solely to one or more of these subjects were deleted.)
Although the deletions of irrelevant information, described above, were made at the Board's request for the use of the Staff's report in the leak rate hear-ing, such deletions are not otherwise required prior to the public release of the report.
Certain portions of the report, however, should be protected from public disclosure pursuant to the Privacy Act,10 C.F.R. Part 9, and 10 C.F.R. I 2.790(a). Therefore, the Staff is making available to the public the entire report except for those deletions required by the Privacy Act and the Commission's regulations.
A copy of the report with only the " Privacy Act" deletions will be placed in the Commission's Public Document room where it i
8605270085 860516
(
PDR ADOCK 05000320 l
P PM b
r
, will be available to the public (including the parties) for inspection and copying.
Also enclosed is the Staff's technical analysis of the individual leak rate tests, entitled "NRR Evaluation of TMI-2 Reactor Coolant System Leak Rate Tests Performed 09/30/78 to 03/28/79," along with the supporting test evalua-tion worksheets.
Finally, also enclosed is a September 20, 1985 memorandum from William T.
Russell to 11arold R. Denton entitled "Stier Report on TMI-2 Leak Rate Test-ing. "
This document compares and contrasts the results of Staff's technical evaluation of individual leak rate tests with those of Mr. Stier.
The release of the enclosed documents has been authorized by the Director of the Office of Investigations and the Executive Director for Operations.
The OI Report of Investigation will be provided under separate cover.
Sincerely, ack R. Goldberg eputy Assistant Chief Ilearing Counsel
Enclosures:
As stated l
cc w/ encl:
Parties to the Leak Rate flearing Edwin II. Stier, Esq.