MONTHYEARNUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20217C9891991-07-16016 July 1991 Notification of 910716 Meeting W/Util in Rockville,Md to Discuss Topics Re Certification Review of Advanced BWR ML20059J5551990-09-12012 September 1990 Submits Daily Highlight.On 900918 & 19,meeting Will Be Held W/Ge in Rockville,Md to Discuss Concept & Technologies Used in Simplified BWR in Order for NRC to Define Research User Needs for Passive Designs.Meeting Agenda Encl ML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20058Q2621990-08-16016 August 1990 Forwards Documents for Advanced BWR Docket Files ML20055D5351990-07-0505 July 1990 Notification of 900717 Meeting W/Ge in Rockville,Md to Discuss Design Features & Research Efforts Re GE Sbwr Plant Design ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D9151989-09-0808 September 1989 Notification of 890912-13 Meetings W/Ge in San Jose,Ca to Discuss Review of PRA for Advanced BWR (Abwr),Including Focus on Refinements in Internal Events PRA That Have Resulted from Consideration of ABWR Design Enhancements ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246J7321989-05-10010 May 1989 Notification of 890512 Meeting W/Ge in Rockville,Md to Discuss Refinements in Internal Events PAR That Have Resulted from Consideration of Recent Advanced PWR Design Safety Enhancements & External Events PRA ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247E8051989-03-27027 March 1989 Notification of 890329 Meeting W/Ge in Rockville,Md to Discuss Conditional Containment Failure Probability Definition,Source Term & Other Severe Accident Issues Re Advanced LWR ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236B3261989-03-0808 March 1989 Notification of 890313 Meeting W/Ge in San Jose,Ca to Discuss Severe Accident Design of Advanced BWR & NRC Certification Process ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20195J3231988-11-18018 November 1988 Provides Responses Re Review of Resolution of USIs & Generic Safety Issues for RESAR SP/90,per 881027 Request ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc 1994-06-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARNUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20217C9891991-07-16016 July 1991 Notification of 910716 Meeting W/Util in Rockville,Md to Discuss Topics Re Certification Review of Advanced BWR ML20059J5551990-09-12012 September 1990 Submits Daily Highlight.On 900918 & 19,meeting Will Be Held W/Ge in Rockville,Md to Discuss Concept & Technologies Used in Simplified BWR in Order for NRC to Define Research User Needs for Passive Designs.Meeting Agenda Encl ML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20058Q2621990-08-16016 August 1990 Forwards Documents for Advanced BWR Docket Files ML20055D5351990-07-0505 July 1990 Notification of 900717 Meeting W/Ge in Rockville,Md to Discuss Design Features & Research Efforts Re GE Sbwr Plant Design ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D9151989-09-0808 September 1989 Notification of 890912-13 Meetings W/Ge in San Jose,Ca to Discuss Review of PRA for Advanced BWR (Abwr),Including Focus on Refinements in Internal Events PRA That Have Resulted from Consideration of ABWR Design Enhancements ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246J7321989-05-10010 May 1989 Notification of 890512 Meeting W/Ge in Rockville,Md to Discuss Refinements in Internal Events PAR That Have Resulted from Consideration of Recent Advanced PWR Design Safety Enhancements & External Events PRA ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247E8051989-03-27027 March 1989 Notification of 890329 Meeting W/Ge in Rockville,Md to Discuss Conditional Containment Failure Probability Definition,Source Term & Other Severe Accident Issues Re Advanced LWR ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236B3261989-03-0808 March 1989 Notification of 890313 Meeting W/Ge in San Jose,Ca to Discuss Severe Accident Design of Advanced BWR & NRC Certification Process ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20195J3231988-11-18018 November 1988 Provides Responses Re Review of Resolution of USIs & Generic Safety Issues for RESAR SP/90,per 881027 Request ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues 1994-06-29
[Table view] |
Text
p
- o UNITED STATES E ~,j NUCLEAR REGULATOR'.' COMMISSION 3 p WASHING TON, D. C. 20555
%, November 29, 1938
,/
Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 NEMORANDUM FOR: L. Shao, Director Division of Engineering and System Technology, NRR B. Grimes, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Director Division of Safety Issue Resolution, RES B. Sheron, Director Division of Systems Research, RES FROM: Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
SUBJECT:
STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the Nr ~ *tatus report concerning the current review milestones for each of the v *st. lantprojects(EPRI,ABWR,RESARSP/90,andCE System 80+).
Note the "Do A
- h .' reflects dates established in the January 25, 1988 "Revised Progr- P en For Standard Plant Reviews" or dates for which modifica-tion was agreed to by PDSNP and the review branch.
/([
CONTACT:
T. Kenyon, NRR/PDSNP i 492-1120
\\ ,
G812060315 891129 ~
PDR ADOCK 03000601 i
R PDC
Multiple Addressees November 29, 1988 The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.
Nd N ev Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects !!!, IV, Y and Special Projects, NRR
Enclosure:
As stated cc: T. Murley J. Sniezek F. Miraglia D. Crutchfield
. L. Rubenstcir J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges
- B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zwolinski S. Weiss W. Regan, Jr.
J. Murphy G. Bagchi S. Newberry
~
Data: Novembir 21, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW Expected Division / Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Comments DEST /EMTB Johnson 1, 4, 5, 688, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Complete 10 to P.M. 5/5/88 DEST /EMEB Rajan/Brammer*** 1, 4, 5, 7 Mechanical Engineering Draft SER 11/30/88 11/30/88 2 DSER in typing to P.M.
DEST /ESGB Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Complete to P.M.
Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Complete to P.M.
Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Complete to P.M.
- See September 29, 1987 meno for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
- Brasurer providing assistance
Data: November 21, 1988 -
REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW -
(Cont.)
Expected Division / Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Comments DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Complete Notley 13 Fire Protection Draft SER 7/15/88 9/01/88 4 Complete to P.M.
DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 Complete Controls to P.M.
DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4 Complete to P.M.
DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems Draft SER 6/21/88 6/21/88 4 Complete to P.M.
Shum (lead) 688, 10, 12, 13 HVAC S,vstems, Waste Draft SER 6/21/88 6/21/88 4 Complete Management, Steam & to P.M.
Power Conversion
- See September 29, 1987 seno for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
~
. N Date: November 21, 1988 -
~
REVIEW STATUS REPORT ON WESTINGH(,USE RESAR SP/90 PDA REVIEW (Cont.)
Expected '
Division / Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Comments DEST /SPLB Shun (lead) 4, 688,7, 13 Plant Systems Draft SER 6/21/88 6/21/88 4 Complete (cont.) to P.M.
DEST /SPLB Tinkler 16 PRA Review DSER 11/10/88 11/10/88 4 Complete re: PRA DEST /SRIB Liar.g 1, 4, 5, 688, Reactor Systems Draft SER 6/28/88 6/28/83 4 Complete 9, 10, 11, 12 to P.M.
DEST /SRIB Liang 16 PRA Review DSER 11/10/88 11/10/88 4 Reviewer re: PRA providing
' Assistance to SPLB DRIS/RSGB Pendelsohn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Complete to P.M.
DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete to P.M.
- See September 29, 1987 meno for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
Data: November 21, 1988 i
~
REVIEW STATUS REPORT ON 5.'E3TINGROUSE RESAR SP79D PEEREVIEW -
(Cont.)
Expected Division / Due Input Srn:ch Reviewer Modules Subject
- Milestone Date Date Cat.** Comments DLPQ/LHFL Lapinski 15 Control Room / Human Draft SER 3/31/88 5/05/88 4 Complete Factors Engineering to P.M.
DREP/PRPB LCunningham 1, 3, 4, 5, Radiological Accident Draft SER 8/01/88 8/12/88 4 Complete 6&8, 9, 10 Analysis to P.M.
Skopec 12 Process & Effluent Draft SER 7/15/88 7/13/88 4 Complete Radiological to P.M.
Monitoring & Sampling Systems DREP/PRAB Margulies 16 PRA Review DSER 09/20/88 09/20/88 4 Complete re: PRA RES/PRA Chellfah/BNL 16 Probabilistic Safety Draft 7/15/88 7/15/88 4 Complete Study - back end SER to P.M.
- See September 29, 1987 meno for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
A Data: Noverbar 21, 1988 '
REVIEW STATUS REPORT ON GE ABWR Q FDA/DC REVIEW -
C Expected i Division / SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Coments j DEST /SPLB Char:crasekaran 9 Plar.t Systems RAls to 9/30/88 4 g:
P.M.
DEST /SPLB Chandrasekaran 11 Plant Systems RAls to 9/30/88 4 au P.M.
I DEST /SPLB Chandrasekaran 6 Containment Systems Draft 12/30/88 3 SFP. 5 DEST /SRXS Thoc:as 5, 6, 15 Reactor Systems RAIs to 10/01/88 10/01/88 4 a revised P.M. schedule has ;
been developeo e so as not to Y.
slip the SER issue date t' (3/30/89), DEST j
has agreed to the proposed '
schedule
-$ <x DEST /SICB Stewart 7 Instrumentation & RAIs to 9/30/88 ? 2 H Control Systems P.M.
DEST /SELB Lazevnick 8, 9 Power Systems RAls to 9/30/88 ? 2 P.M. .
,y.;
} 6[h]
- s A
- 1. AD or above attention requested M
- 2. Branch Chief attention requested F9
- 3. On schedule I W
- 4. Complete y 8 :
- - - - - - - - - - - - - - - - - - - - _1 :
Date: November 21, 1988 -
REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW (Cont.)
Expected Division / SRP Due Input Branch Reviewer Chapter Subject itilestone Date Date Cat.* Comments DEST /ECEB Witt 7,8,9,11,12,13, Chemical Engineering RAIs To 9/30/88 8/14/88 4 14, & 17 P.M.
DRIS/RSGB Mendelsohn 13 Safeguards RAIs to 9/30/88 4 P.M.
l DLFQ/LOAB Spraul 17 QA RAIs to - - 3 Final design QA audit scheduled P.M.
for January 1989 DREP/PRPB Brown 15 Radiation Protectior2 Draft 7/31/88 9/30/88 1 8/19/88 memc SER committing to to 9/30/88 SER input-no fur-ther respcnse from PRPB DREP/PRPB Pedersen 12 Radiation Protection RAI to 9/30/88 10/29/88 4 F.M.
DEST /EMEB Rajan 4, 5, 6, 15 Mechanical Engineering Draft 7/31/88 9/29/88 4 (Ccte Cases) SER DEST /EME8 Rajan 1, 2, 3 Mechanical Engir.eering RAIs to 6/30/88 9/13/88 4 P.M.
o Category definitions:
- 1. AD or above attention requested
- 2. Sranch Chief attention requested
- 3. On schedule
- 4. Complete
Dato: November 21, 1988 -
REVIEW STATUS REPORT ON CE SYSTEM 80+ .
CESSAR-DC REVIEW Expected Division / Due Input Br nch Reviewer Chapter Subject Milestone Date Date Cat.* Comments CEST/SRX8 L.Kopp 5 Rev C Reactor Cooling System RAI 09/30/88 09/30/88 No comments yet l
l DEST /ECEB F. Witt 5 Rev C Reactor Coolant System RAI 09/30/88 10/26/88 4 DEST /ECEB F. Witt 6 Rev C Engineered Safety Features RAI 09/30/88 10/26/88 4 CEST/ECE8 F. Mitt 10 Rev C Steam & Power Conversion RAI 09/30/28 10/26/88 4 System RES/DRAA/ E. Ehellfah Base Line Base Line PRA Comments 10/30/88 10/30/88 2 PRAB PRA DEST /ESGB N. Retney 2 REV D Site Characteristics RAI 12/30/88 12/30/88 3 DREP/ PRE 8 R. Van Niel 2 REY D Site Characteristics RAI 12/30/R8 12/30/88 3 DEST /ESGB N. Romney 2 REY D Structures, Components RAI 12/30/88 12/30/88 3 DEST /EMEB J. Rajan 3 REY D Structures, Components RA! 12/30/88 12/30/88 3 DEST /SPLB J. Raval 3 REV D Structures, Components RAI 12/30/88 12/30/88 3 DEST /SRDB L. Kopp 4 KEY D Reactor RAI 12/30/88 12/30/88 3 DEST /EMEB J. Rajan 5 REV D 2eactor Coolant System RAI 12/30/88 12/30/88 3
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
__ __ _ _ ~ __ _ _ _ -
Dato: November 21, 1988 -
REVIEW STATUS REPORT ON C E5Y57EM 80+ '
CEhSAR-DC REVIEW (Cont'd) -
Expected Division / Due Input Brar.ch Reviewer Chaptei Subject Milestone. Date Date Cat.* Comments DCST/SRIB L. Kope 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 3 DEST / SPLB J. Faval 5 PEV D Reactor Coolant Sys'em c RAI 12/30/88 12/30/88 3 DEST /SPtB F. Witt 5 REV 0 Reactor Coolant System RAI 12/30/88 12/30/88 3 DREP/RGSB B. Mendelsohn 5 REV U Reactor t solant System RAI 12/30/88 12/30/88 3
, DEST /SPIB J. Raval 6 REY D Engineereo Safety RAI 12/30/88 12/30/88 3 i
Features j DEST /SRIB L. Kepp 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3 Features 1
DEST /ECEB F. Wict 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3 i Features DES ~/ SIC 8 J. Stewart 7 REV E Instrurentation & RAI 12/30/88 12/30/88 3 Controls DLPQ/LHFB G. Lapinski 7 REV D Instrumentation & RAI 12/30/88 12/30/88 3 Controls i
DLPQ/LHFB G. Lapinski 18 REV D Human Factnrs Engineering RAI 12/30/88 12/30/88 3 i
- 1. AD or above attention requested
) 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
S b,&
Data: November 21, 1988 -
REVIEW STATUS REPORT ON
- 5V5TER 80 CESSAR-F ,
REVIEW Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER oper. open 3 Wating res-to P.M. ponse from CE on RAI DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3 Waiting res-P.M. ponse from CE on RAI DEST /EMTB W. Wickren TAC 66401, Steam Gen. Tube Vibration .RAIs to open open 3 Waiting res-P.M. ponse from CE on RAI DREP/PRPB LCunningham TAC 66400 ASPSS ISSUE (SGT Rupture) Final SER open open 3 Waiting res-to SRXB/PM ponse from CE on RAI
- 1. AD or above attention requested
- 2. Sranch Chief attention requested
- 3. On schedule l
- 4. Complete
Dat2: November 21,1988 -
REVIEW STATUS REPORT ON CE SYSTEM 80+
CESSAR-DC REYIEW ARSAP TOPIC PAPERS .
Expected Division / Due Input Bra ch Reviewer Chapter Subject Milestone Date Date Cat.* Comments RES/SAIB C. Ferrell, et al Topic Paper Set 6 ARSAP Issues RAI 08/30/88 08/30/88 1 No. 2 RES/SAIB C. Ferrell, et al Topic Paper Set 3 ARSAP Issues RAI 10/30/88 10/30/88 2 No. 3 RES/SAIB C. Ferrell, et al Topic Paper Set 1 ARSAP Issue RAI 11/9/88 11/9/88 2 No. 4
- 1. AD or above attention requested
- 2. Branch Chief attentien requested
- 3. On schedule
- 4. Complete
Dat2: ' November 21, 1988 REVIFW STAB!S REPORT ON '
EPRI' g -T G Uf Fi!L1TS DUCUMENT Expected Division / Due Input Brawch Reviewer Chapter Subject * ,
Milestone Date Date Cat.* Comments DEST /EMEB Brammer/Rajan 5 Eng. Safe (y Systems DSER to 11/30/88** 3 P.M.
DEST /ENTB Tsao 5 Eng. Safety Systems DSER to N/A 4 P.M.
CEST/SICB Stewart 5 Eng. Safety Systems DSER to N/A 4 P.M.
DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to Completed 4 P.M.
DEST /SPtB Shum 5 Eng. Safety Systems DSER to 11/30/88** 3 P.M.
DEST /SRXB Schwenk 5 Eng. Safety Systems DSER to Completed 4 P.M.
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete
- Due date revised to reflect receipt of additier.al information dated 08/16/88 cnd ACRS schedule
60%
Dat2: November 21, 1988 ,
REVIEW STATUS REPORT ON ~
EPRI'5 ALWR REQUIRDIERT!QDCUMENT (Cont.)
Expected Division / Due Input Brench Reviewer Chapter Subject
- Milestone Date Date Cat.* Comments DREP/RPB Martin 5 Eng. Safety Systems DSER to N/A 4 P.M.
DEST /ECEB Parczewski 5 Eng. Safety Systems DSER to Completed 4 P.M.
DREP/RAB Kelly 5 Eng. Safety Systems DSER to 11/30/88** 2 P.M.
DRIS/RSGB Mendelsohn 5 Eng. Safety Systems DSER to N/A 4 P.M.
DEST /ESGB Rinaldi 5 Eng. Safety Systems DSER to N/A 4 P.M.
DLPQ/LHFB Correia 5 Eng. Safety Systems DSER to N/A 4 P.M.
DPLQ/LQAB Spraul 5 Eng. Safety Systems DSER to N/A 4 PM Note: Chapter 6 "Evilding Arangements" review begins 11/17/88.
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete
- Due date revised to reflect receipt cf additional information dated 08/16/88 cnd ACRS schedule
o
.. i Multiple Addressces November 29, 1988 The column "Expected Input Date" reflects input from appropriate technical l branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be
- identified to me by the appropriate Assistant Director within a week of receipt of this meno,
/s/
! Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, i Y and Special Projects, NRR
Enclosure:
As stated cc: T. Murley J. Sniezek F. Miraglia
- D. Crutchfield
- L. Rubenstein l J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadant J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zowlinski S. Weiss W. Regan, Jr.