Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With ML20207M8461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for TMI-1.With ML20198B8641998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for TMI-1.With ML20196B7191998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for TMI-1.With ML20154L5541998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for TMI Unit 1.With ML20151V2811998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Tmi,Unit 1.With ML20237C6411998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Tmi,Unit 1 ML20236R2201998-06-30030 June 1998 Monthly Operating Rept for June 1998 for TMI-1 ML20249A1061998-05-31031 May 1998 Monthly Operating Rept for May 1998 for TMI-1 ML20247G0761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Three Mile Island Nuclear Station,Unit 1 ML20216K1061998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Three Mile Island Nuclear Station,Unit 1 ML20216F0981998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Three Mile Island Nuclear Station,Unit 1 ML20202F8121998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for TMI Nuclear Station, Unit 1 ML20199J3251997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Three Mile Island Nuclear Station,Unit 1 ML20203K4081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for TMI-1 ML20199E3401997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for TMI-1 ML20198J8121997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for TMI-1 ML20217A8761997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for TMI-1 ML20210K0331997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Three Mile Island, Unit 1 ML20196G8401997-06-30030 June 1997 Monthly Operating Rept for June 1997 for TMI-1 ML20210K0401997-06-30030 June 1997 Revised App B of Monthly Operating Rept for June 1997 for Three Mile Island,Unit 1 Correcting Calculational Error in Shutdown Duration Hours Value ML20141C6521997-05-31031 May 1997 Monthly Operating Rept for May 1997 for TMI-1 ML20141G2801997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for TMI-1 ML20140D6601997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Three Mile Island, Unit 1 ML20136G3891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Three Mile Island Nuclear Station,Unit 1 ML20134Q2071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for TMI-1 ML20133G8231996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for TMI-1 ML20132D5431996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Three Mile Island Nuclear Station,Unit 1 (TMI-1) ML20135A8291996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for TMI-1 ML20129B6621996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Three Mile Island Nuclear Station Unit 1 (TMI-1) ML20129C2661996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Three Mile Island Nuclear Station,Unit 1 ML20116N6571996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Three Mile Island Nuclear Station,Unit 1 ML20115E2071996-06-30030 June 1996 Monthly Operating Rept for June 1996 for TMI-1 ML20117M1581996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Three Mile Island Unit 1 ML20112A2171996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Three Mile Island Nuclear Station Unit 1 ML20117D3691996-03-31031 March 1996 Monthly Operating Rept for March 1996 for TMI-1 ML20101C6811996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Three Mile Island Nuclear Station,Unit I ML20149K7551996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for TMI-1 ML20096D5781995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for TMI Nuclear Station ML20095E0521995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for TMI-1 ML20094L7651995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for TMI-1 ML20093E6731995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for TMI-1 ML20092F4401995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for TMI-1 ML20086F5021995-06-30030 June 1995 Monthly Operating Rept for June 1995 for TMI Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G1001999-10-14014 October 1999 Errata to Safety Evaluation Supporting Amend 215 to FOL DPR-50.Credit Given for Delay in ECCS Leakage ML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20216F9231999-09-22022 September 1999 Safety Evaluation Supporting Amend 216 to License DPR-50 05000289/LER-1999-010, :on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With1999-09-21021 September 1999
- on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With
ML20211H5111999-08-31031 August 1999 Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20211E8731999-08-24024 August 1999 Safety Evaluation Supporting Amend 215 to License DPR-50 ML20211B1931999-08-19019 August 1999 Safety Evaluation Supporting Amend 214 to License DPR-50 ML20210R4791999-08-13013 August 1999 Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With 05000289/LER-1999-009, :on 990626,automatic Start of EDG 1A Occurred. Caused by Failure of Fault Pressure Relay on Auxiliary Transformer 1B.Failed Pressure Relay Has Been Replaced1999-07-22022 July 1999
- on 990626,automatic Start of EDG 1A Occurred. Caused by Failure of Fault Pressure Relay on Auxiliary Transformer 1B.Failed Pressure Relay Has Been Replaced
ML20210K7651999-07-0909 July 1999 Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca ML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML20212H9101999-06-21021 June 1999 Safety Evaluation Supporting Amend 212 to License DPR-50 05000289/LER-1999-007, :on 990528,increasing Failure Rate of ESAS Relays Characterized by Coil Overheating & Failing to Fully re-close After Being de-energized Was Discovered.Cause Indeterminate.Relay Check Procedure Has Been Changed1999-06-18018 June 1999
- on 990528,increasing Failure Rate of ESAS Relays Characterized by Coil Overheating & Failing to Fully re-close After Being de-energized Was Discovered.Cause Indeterminate.Relay Check Procedure Has Been Changed
05000289/LER-1999-005, :on 990514,open Flood Path Between Turbine Bldg & Control Bldg Was Noted.Caused by Failure to Recognize That Mods Affected Flood Protection.Revised Flood Procedures.With1999-06-14014 June 1999
- on 990514,open Flood Path Between Turbine Bldg & Control Bldg Was Noted.Caused by Failure to Recognize That Mods Affected Flood Protection.Revised Flood Procedures.With
ML20195H0751999-06-0808 June 1999 Drill 9904, 1999 Biennial Exercise for Three Mile Island ML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 05000289/LER-1999-003-01, :on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open1999-05-0707 May 1999
- on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open
ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20206D4201999-04-20020 April 1999 Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 ML20205Q6111999-04-15015 April 1999 Safety Evaluation Supporting Amend 210 to License DPR-50 ML20205Q5981999-04-13013 April 1999 Safety Evaluation Supporting Amend 209 to License DPR-50 ML20206P2841999-04-12012 April 1999 SER Approving Transfer of License for Tmi,Unit 1,held by Gpu Nuclear,Inc to Amergen Energy Co,Llc & Conforming Amend, Per 10CFR50.80 & 50.90 ML20209G0071999-03-31031 March 1999 Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion) ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With 05000289/LER-1999-002, :on 990212,potential Failure of Multiple Containment Monitoring Sys CIV (CM-V-1,2,3 & 4) Was Noted. Caused by Inappropriate Use of Vendor Info.Personnel Will Be Trained on Mgt Expectations.With1999-03-14014 March 1999
- on 990212,potential Failure of Multiple Containment Monitoring Sys CIV (CM-V-1,2,3 & 4) Was Noted. Caused by Inappropriate Use of Vendor Info.Personnel Will Be Trained on Mgt Expectations.With
ML20210C0161999-03-0101 March 1999 Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246 ML20207M8461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for TMI-1.With 05000289/LER-1999-001-01, :on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys1999-02-19019 February 1999
- on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys
ML20196K3561999-01-22022 January 1999 Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity Limits 05000289/LER-1998-014-01, :on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With1999-01-11011 January 1999
- on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With
ML20207A9291998-12-31031 December 1998 1998 Annual Rept for TMI-1 & TMI-2 ML20196G4661998-12-31031 December 1998 British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer Encl ML20196F6861998-12-0202 December 1998 Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted Connection ML20198B8641998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for TMI-1.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C6921998-11-12012 November 1998 Safety Evaluation Supporting Amend 52 to License DPR-73 ML20196B7191998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for TMI-1.With ML20203G1211998-10-30030 October 1998 Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt 05000289/LER-1998-013, :on 980916,failure to Perform Fire Protection Program Surveillances at Required Frequency Was Noted.Caused by Changes Not Being Made to Surveillance Schedule.Performed Missed Insp Surveillance1998-10-15015 October 1998
- on 980916,failure to Perform Fire Protection Program Surveillances at Required Frequency Was Noted.Caused by Changes Not Being Made to Surveillance Schedule.Performed Missed Insp Surveillance
ML20155E7511998-10-15015 October 1998 Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing 05000289/LER-1998-010-01, :on 980825,potential Violation of Design Criteria During Single Auxiliary Transformer Operation Occurred.Caused by Failure to Adequately Define Job Performance Stds.Temporary Change Notice Issued1998-10-0909 October 1998
- on 980825,potential Violation of Design Criteria During Single Auxiliary Transformer Operation Occurred.Caused by Failure to Adequately Define Job Performance Stds.Temporary Change Notice Issued
ML20154L5541998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for TMI Unit 1.With 05000289/LER-1998-011, :on 980825,Thermo-Lag Fire Barrier Was Found Installed Outside Approved Joint Design Arrangement.Caused by Personnel Error.Initiated Continuous Fire Watch & Installed Trowel Grade Thermo-Lag in Void & on Outer Edge1998-09-23023 September 1998
- on 980825,Thermo-Lag Fire Barrier Was Found Installed Outside Approved Joint Design Arrangement.Caused by Personnel Error.Initiated Continuous Fire Watch & Installed Trowel Grade Thermo-Lag in Void & on Outer Edge
05000289/LER-1998-009-01, :on 980820,discovered Potential Loss of HPI During Postulated Loca.Caused by Misapplication or Interpretation of Design Inputs.Revised OL Was Implemented & Mut Pressure & Level Limits Analysis Revised1998-09-18018 September 1998
- on 980820,discovered Potential Loss of HPI During Postulated Loca.Caused by Misapplication or Interpretation of Design Inputs.Revised OL Was Implemented & Mut Pressure & Level Limits Analysis Revised
1999-09-30
[Table view] |
Text
1 0'
I GPU Nuclear, Inc.
( Route 441 South NUCLEAR Post Office Box 480 Middletown, PA 17057-0480
, Tel 717 944 7621 April 11,1997 6710-97-2149 U S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for March 1997 4
Enclosed are two copies of the March 1997 Monthly Operating Report for Three Mile Island
< Nuclear Station, Unit 1.
Sincerely, N
J. W. Langenbac Vice President and Director, TMI WGH l
/ l cc: Administrator, Region I TMI Senior Resident Inspector J((\ /
97001 i i
9704240013 970331 5
{M ADOCK 05000289' pm 'll ll l' li
....c e i-
OPERATIONS
SUMMARY
March 1997 The plant entemd the month operating at 100% power and remained at that power level for the remainder of the month. Net unit electrical output averaged approximately 820 MWe during March.
MAJOR SAFETY RELATED MAINTENANCE The major safety related maintenance items completed during the month involved the following equipment:
Auxiliary and Fuel Handling Building Fan AH-E-14C Repair of the Auxiliary and Fuel Handling Building Ventilation Exhaust Fan AH-E-14C was continued from last month. The work accomplished during March included completion of the fan / motor rigging assembly, installation of the fan blades onto the motor and test running /
balancing the fan assembly. Reinstaliation of the fan assembly into the duct is in progress and will continuein April.
Screen House Ventilation Fan AH-E-27B Screen House Ventilation Fan AH-E-27B was removed from service because the unit was .
becoming noisy. Investigation revealed that the pillow block bearings were worn and required replacement. New bearings were installed and AH-E-27B returned to service.
1 Beactor Buildine Fan AH-E-1 A Reactor Building Ventilation Fan AH-E-1 A was removed from service after the unit tripped two .
times. The unit was meggered and bridged from the MCC with unsatisfactory results. A physical-inspection was made and 'T' lead connector (A6) to spark plug connection was found burned causing the unit to trip. Connector A6 and the corresponding spark plug was replaced. All other electrical connections were cleaned and tightened. All testing was found to be satisfactory and AH-E-1 A returned to service.
1
OPERATING DATA REPORT DOCKET NO. 50-289 DATE April 11,1997 COMPLETED BY W. HEYSEK 3 TELEPHONE (717)948-8191 OPERATING STATUS NOTES:
- 1. UNIT NAME: THIEE MILE ISLAND UNIT 1
- 2. REPORTING PERIOD: MARCH 1997
- 3. LICENSED THERMAL POWER: 2568
- 4. NAMEPLATE RATING (GROSS MWe): 872
- 5. DESIGN ELECTRICAL RATING (NET MWe): 819
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 834
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 786
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
TIIIS MONTil YR-TO-DATE CUMMUIA1TVE I 1. HOURS IN REPORTING PERIOD: (HRS) 744.0 2,160.0 197,929.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 744.0 2,160.0 120,487.1
- 13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 2,283.9
- 14. HOURS GENERATOR ON LINE (HRS) 744.0 2,160.0 119,325.3
- 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,908,743.0 5,541,333.1 294,147,008.5 17, GROSS ELECTRICAL ENERGY GENERATED (MWH) 645,393.0 1,876,439.0 98.840,985.i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 610,350.0 1,774,106.0 92,917,770.1
- 19. UNIT SERVICE FACTOR (%) 100.0 100.0 60.3
- 20. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 60.3
- 21. UNIT CAPACITY FACTOR (MDC NET) 104.4 104.5 59.7
- 22. UNIT CAPACITY FACTOR (DER NET) 100.2 100.3 57.3
- 23. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 33.7 UNIT FORCED OUTAGE HOURS (HRS) 0.0 0.0 60,761.2
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION OF EACH):
The unit will shutdown for a refueling outage scheduled to begin on September 5,1997 with a duration of 55 days.
- 25. IF SHUTDOWN AT THE END OF THE REPORT PERIOD, ESTIMATE DATE OF STARTUP:
2
._. ._. _ . _ . - . . _ _ . . . . _ . _ . . _ _ _ _ . _ . . ~ . _ - - _ . . . _ . . . . . - . . _ _ _ _ _ _
- , t j-I , i l- !
l AVERAGE DAILY UNIT POWER LEVEL !
DOCKETNO. 50 289 a DATE April 11, 1997 l COMPLETEDBY W.HEYSEK TELEPHONE '(717) 948-8191 1
' DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER
- l- LEVEL (MWe NET) LEVEL (MWe NET) ;
i t
! l 820 16 826 !
2 814 17 824 i 3 823 18 820 ;
L 4 823 19 '824 ;
- 5 821 20 822 l
l t.
6 818 21 820 .
! 7 824 22 818 ~-
l 8 821 23 825 i 1
L 9 825' 24 825 i
10 821 25 821- '
1 11 820 26 816 !
12 823 27- 814 )
l l 13 824 28 813 l
(. 14 821 29 812 )'
! 15 823 30 813 31 820 i
l i
I
i i i
l i l l
1 1
f 3 ,
t DOCKET NO. 50-289.
UNIT NAME TMI-1' DATE ' April 11, 1997, -
REPORT MONTH March 1997 COMPLETED BY W. G. Heysek-TELEPHONE (717) 948-8191 i
I Method of I.acemee Synerm Compament Catte & Caereceve f Shuang Event Cede Cada Achan t>
- Does Type' Durumon Rm 8 Down Reports Preven Recurrence W") Reactos 8 *&* , ,
i I
None 1 2 3 4 F Fasted Reenna Meshed ExhAnt G-Instruenons Er 5 Scheduled A-Equipnemt Failsse(Exphan) 1-Manual pnyerenen ofData Entry Sheets E' ' orTest 2-Manual Screen forlicensee Evera Repost(LE*) .
C-Reihehng 3-Automans Scruza File (NUREG.0161)
ERepdmory Renneton 4Oher(Explun)
E4pesetor Tnes's AI.mn"*
F .' .
C.Operabonal Ener(Expinn) noherw 6 AenmaymedexhAmsF AIINUI'JG0161 t
i 4 !
r l
. . _ _____=____ - - - _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ _ _ _ _ _ . _ _ - _ _ . _ . _ _ _ _ .. -_ - , . _ _ _ . - - . . _ . - _ - _ _ - - -
1 i
i REFUELING INFORMATION REOUEST l
- l. Name of Facility: Three Mile Island Nuclear Station, Unit 1 I
- 2. Scheduled date for next refueling shutdown: September 5,1997
- 3. Scheduled date for restart following current refueling: NA i
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes. To support GPU Nuclear's independent reload analyses for Cycle 12 as discussed in response
, to Question 6 below, T.S. 6.9.5.2 will require revision to include references to the GPU Nuclear analysis methods applied to the reload.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting i information: A Technical Specification Change Request for the changes as discussed above will be submitted once the GPU Nuclear topicals are approved.
- 6. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
a) GPU Nuclear Letter 6710-96-2092, dated March 28,1996 confirmed plans to perform independent reload design evaluations for Cycle 12, the !
next operation cycle, based on NRC approved methods described in GPU ;
Nuclear Topical Reports TR-091-A (core physics), TR-087-A (core thermal !
hydraulics), TR-078-A (FSAR safety analyses) and TR-092P-A (design and :
setpoints methodology) submitted to the NRC. The NRC has approved all l of the associated topical reports.
The GPU Nuclear Cycle 12 reload program and results are expected to be available for NRC review in the May to June 1977 time frame.
5
i j b) Cycle 12 fuel rod performance calculations (e.g. internal pin pressure) ,
will be performed by Framatome Cogema Fuels Company (FCF) using the j
- approved TACO 3 (BAW-10162P-A) and GDTACO (BAW-10184P-A) fuel
- codes. Results require minor changes to the Mark B9 fuel rod design (lower i
fill gas prepressure, increased plenum volume). The new design will meet all fuel criteria in the latest approved revision of BAW-10179P-A, Safety Criteria and Methodology for Acceptable Cycle Reload Analyses. Fuel rod cladding corrosion calculations for all Cycle 12 fuel are being done by FCF using the COROS2 methodology now under review by the NRC. Approval is expected soon. The TACO calculations are being done using power histories generated with the GPU Nuclear approved core physics codes CASMO-3/ SIMULATE-3 (TR-091A). Use of the SIMULATE-3 power l peaking uncertainty of 5.5% with the TACO methodologies, rather than the current FCF NEMO physics code (BAW-10180A, Rev 1) uncertainty of j 4.8%, was approved by NRC on October 4,1995 for application to TMI-1 i only.
l 7. The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage l pool: (a) 177 (b) 864 i
t 8. The present licensed spent fuel pool storage capacity and the size cf any increase
( in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
i l The present licensed capacity is 1990. Phase I of the reracking project to
- increase spent fuel pool storage capacity permits storage of 1342 assemblies.
- Upon completion of Phase II of the reracking project, the full licensed
?
capacity will be attained. Phase It is expected to be started in 2002.
- 9. The projected date of the last refueling that can be discharged to the spent fuel
- pool assuming the present licensed capacity:
}
Completion of hase .I of the reracking proiect permits full rnre nmload (177 fuel assemblies) through the end of Cycle 14 and on completion of the rerack project full core off-load is assured through and beyond the end of the current operating license.
6