Letter Sequence Withholding Request Acceptance |
---|
TAC:MF2798, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARGNRO-2013/00012, Maximum Extended Load Line Limit Analysis Plus (Mellla+), License Amendment Request2013-09-25025 September 2013 Maximum Extended Load Line Limit Analysis Plus (Mellla+), License Amendment Request Project stage: Request ML13345A1822013-12-19019 December 2013 Supplemental Information Needed for Acceptance of Licensing Action, Request to Revise Technical Specification to Allow Operation in Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Domain Project stage: Acceptance Review ML13364A2862013-12-30030 December 2013 Maximum Extended Load Mine Limit Analysis Plus (Mella+) License Amendment Request-Responses to Requests for Supplemental Information Project stage: Supplement ML14023A5802014-01-23023 January 2014 NRR E-mail Capture - Acceptance Review of Grand Guld Nuclear Station License Amendment Request Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Acceptance Review ML14037A1492014-02-0606 February 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI GNRO-2014/00024, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/20142014-03-10010 March 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/2014 Project stage: Response to RAI ML14080A2722014-03-18018 March 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI ML14119A0092014-04-28028 April 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Audit Plan Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: Other ML14101A0872014-05-0808 May 2014 Request for Withholding from Public Disclosure - 9/10/2013 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Nedc - 33612P, Revision 0 Project stage: Other ML14101A0432014-05-0808 May 2014 Request for Withholding from Public Disclosure - 12/19/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC Related to Responses to Request for Supplemental Information Project stage: Other ML14140A3012014-05-19019 May 2014 NRR E-mail Capture - Grand Gulf Nuclear Station, Unit 1, Request for Additional Information Regarding Maximum Load Line Limit Analysis Plus Project stage: RAI ML14211A1362014-07-30030 July 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI GNRO-2014/00051, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/20142014-08-14014 August 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/2014 Project stage: Response to RAI GNRO-2014/00045, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/20142014-08-26026 August 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 Project stage: Response to RAI GNRO-2014/00064, Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/20142014-09-0404 September 2014 Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 Project stage: Response to RAI GNRO-2014/00052, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/20142014-09-10010 September 2014 Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/2014 Project stage: Request ML14265A4222014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/25/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 3 to GNRO-2014/00045 Dated 8/26/14 Project stage: Other ML14265A3842014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/19/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00045 Dated 8/26/14 Project stage: Other ML14265A3702014-10-23023 October 2014 Request for Withholding from Public Disclosure - 7/1/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00064 Dated 9/4/14 Project stage: Other ML14111A0582014-10-23023 October 2014 Request for Withholding from Public Disclosure - 3/4/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure to GNRO-2014/00024 Responses to Request for Additional Information Project stage: RAI ML14262A3972014-11-12012 November 2014 Request for Withholding from Public Disclosure - 7/22/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure 1 to GNRO-2014/00051 Dated 8/14/14 Project stage: Other ML14262A3722014-11-12012 November 2014 Request for Withholding from Public Disclosure - 8/20/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00052 Dated 9/10/14 Project stage: Other ML14260A1302014-11-25025 November 2014 April 23-25, 2014, Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Amendment Including Minimum Stable Film Boiling Temperature and Quench Model Project stage: Other GNRO-2014/00083, Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request2014-12-15015 December 2014 Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Request GNRO-2014/00088, Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/20142015-01-20020 January 2015 Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 Project stage: Request GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/20142015-02-0909 February 2015 Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/2014 Project stage: Request GNRO-2015/00011, Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method2015-02-18018 February 2015 Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method Project stage: Supplement ML15050A0772015-02-19019 February 2015 Request to Convert Regulatory Commitments for Time Critical Operator Actions Listed in Letter GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit. Project stage: Request GNRO-2015/00012, Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information2015-03-0303 March 2015 Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information Project stage: Request ML15040A1262015-03-19019 March 2015 Request for Withholding Information from Public Disclosure - 10/30/14 Affidavit Executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Related to Attachment 1 to GNRO-2014/00088 Dated 1/20/15 (TAC MF27 Project stage: Withholding Request Acceptance ML15085A2272015-04-14014 April 2015 October 15, 2014, Onsite Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML15040A0932015-06-24024 June 2015 Request for Withholding Information from Public Disclosure-10/12/14 Affidavit Executed by James F. Harrison, GE-Hitachi Nuclear Energy Amenricas LLC Related to Attachment 1 to GNRO-2014/00083 Dated 12/15/2014 (MF2798) Project stage: Withholding Request Acceptance GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/20132015-08-14014 August 2015 Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 Project stage: Request ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Approval 2014-07-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
\..~p..R REG(/
.;:,C. ('1 UNITED STATES 1/'~"'0-11 of I-
~
(')
0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
~ ~
~- v,Gi *
- Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF N_UCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF2798)
Dear Sir or Madam:
By letter dated January 20, 2015, Entergy Operations, Inc. (Entergy, the licensee), submitted an affidavit dated October 30, 2014, executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Attachment 1 to GNR0-2014/00088, "AEP-647 Proprietary Responses to Item 20 of the Request for Additional Information" A publicly available version of Attachment 1, designated as Attachment 2 to the letter dated January 20, 2015, is in the Agencywide Documents Access and Management System under Accession No. ML15029A454. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld cpntains proprietary commercial information and should be withheld from public disclosure. ~
Therefore, Attachment 1 to GNR0-2014/00088 marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. *
- Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-1445 or via e-mail at Alan.Wang@nrc.gov.
Sincerely,
~\J~--
Alan* ~- Wang, Projec~anage~
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE:-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
Wilmington, NC 28401 Additional Distribution via Listserv
ML15040A126 OFFICE NRR/DORULPL4-2/PM NRR/DORULPL4-2/LJ\ NRR/DSS/SRXB/BC NRR/DORULPL4-2/BC NRR/DORULPL4-2/PM NAME AWang PBlechman CJackson MKhanna AWang DATE 3/3/15 2/23/15 3/16/15 3/17/15 3/19/15
.