Other: GNRO-2013/00060, Entergys First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), GNRO-2014/00011, Entergys Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), GNRO-2014/00060, Entergys Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, GNRO-2015/00004, Entergys Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ML14101A043, ML14101A087, ML14119A009, ML14260A130, ML14262A372, ML14262A397, ML14265A370, ML14265A384, ML14265A422, ML15085A227
|
MONTHYEARGNRO-2013/00060, Entergys First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2013-08-28028 August 2013 Entergys First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) Project stage: Other GNRO-2013/00012, Maximum Extended Load Line Limit Analysis Plus (Mellla+), License Amendment Request2013-09-25025 September 2013 Maximum Extended Load Line Limit Analysis Plus (Mellla+), License Amendment Request Project stage: Request ML13345A1822013-12-19019 December 2013 Supplemental Information Needed for Acceptance of Licensing Action, Request to Revise Technical Specification to Allow Operation in Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Domain Project stage: Acceptance Review ML13364A2862013-12-30030 December 2013 Maximum Extended Load Mine Limit Analysis Plus (Mella+) License Amendment Request-Responses to Requests for Supplemental Information Project stage: Supplement ML14023A5802014-01-23023 January 2014 NRR E-mail Capture - Acceptance Review of Grand Guld Nuclear Station License Amendment Request Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Acceptance Review ML14037A1492014-02-0606 February 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI GNRO-2014/00011, Entergys Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Entergys Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other GNRO-2014/00024, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/20142014-03-10010 March 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/2014 Project stage: Response to RAI ML14080A2722014-03-18018 March 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI ML14119A0092014-04-28028 April 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Audit Plan Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: Other ML14101A0432014-05-0808 May 2014 Request for Withholding from Public Disclosure - 12/19/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC Related to Responses to Request for Supplemental Information Project stage: Other ML14101A0872014-05-0808 May 2014 Request for Withholding from Public Disclosure - 9/10/2013 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Nedc - 33612P, Revision 0 Project stage: Other ML14140A3012014-05-19019 May 2014 NRR E-mail Capture - Grand Gulf Nuclear Station, Unit 1, Request for Additional Information Regarding Maximum Load Line Limit Analysis Plus Project stage: RAI ML14211A1362014-07-30030 July 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI GNRO-2014/00051, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/20142014-08-14014 August 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/2014 Project stage: Response to RAI GNRO-2014/00045, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/20142014-08-26026 August 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 Project stage: Response to RAI GNRO-2014/00060, Entergys Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergys Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other GNRO-2014/00064, Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/20142014-09-0404 September 2014 Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 Project stage: Response to RAI GNRO-2014/00052, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/20142014-09-10010 September 2014 Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/2014 Project stage: Request ML14111A0582014-10-23023 October 2014 Request for Withholding from Public Disclosure - 3/4/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure to GNRO-2014/00024 Responses to Request for Additional Information Project stage: RAI ML14265A3702014-10-23023 October 2014 Request for Withholding from Public Disclosure - 7/1/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00064 Dated 9/4/14 Project stage: Other ML14265A3842014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/19/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00045 Dated 8/26/14 Project stage: Other ML14265A4222014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/25/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 3 to GNRO-2014/00045 Dated 8/26/14 Project stage: Other ML14262A3722014-11-12012 November 2014 Request for Withholding from Public Disclosure - 8/20/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00052 Dated 9/10/14 Project stage: Other ML14262A3972014-11-12012 November 2014 Request for Withholding from Public Disclosure - 7/22/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure 1 to GNRO-2014/00051 Dated 8/14/14 Project stage: Other ML14260A1302014-11-25025 November 2014 April 23-25, 2014, Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Amendment Including Minimum Stable Film Boiling Temperature and Quench Model Project stage: Other GNRO-2014/00083, Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request2014-12-15015 December 2014 Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Request GNRO-2014/00090, Correction to Typographical Error in Entergy Letter GNRO-2014/00053 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using Consolidated Line Item Improvement.2015-01-0606 January 2015 Correction to Typographical Error in Entergy Letter GNRO-2014/00053 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using Consolidated Line Item Improvement. Project stage: Request GNRO-2014/00088, Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/20142015-01-20020 January 2015 Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 Project stage: Request GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/20142015-02-0909 February 2015 Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/2014 Project stage: Request GNRO-2015/00011, Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method2015-02-18018 February 2015 Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method Project stage: Supplement GNRO-2015/00013, Request to Convert Regulatory Commitments for Time Critical Operator Actions Listed in Letter GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit2015-02-19019 February 2015 Request to Convert Regulatory Commitments for Time Critical Operator Actions Listed in Letter GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Project stage: Request GNRO-2015/00004, Entergys Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-19019 February 2015 Entergys Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other GNRO-2015/00012, Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information2015-03-0303 March 2015 Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information Project stage: Request ML15040A1262015-03-19019 March 2015 Request for Withholding Information from Public Disclosure - 10/30/14 Affidavit Executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Related to Attachment 1 to GNRO-2014/00088 Dated 1/20/15 (TAC MF27 Project stage: Withholding Request Acceptance ML15085A2272015-04-14014 April 2015 October 15, 2014, Onsite Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML15040A0932015-06-24024 June 2015 Request for Withholding Information from Public Disclosure-10/12/14 Affidavit Executed by James F. Harrison, GE-Hitachi Nuclear Energy Amenricas LLC Related to Attachment 1 to GNRO-2014/00083 Dated 12/15/2014 (MF2798) Project stage: Withholding Request Acceptance GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/20132015-08-14014 August 2015 Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 Project stage: Request ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Approval 2014-05-08
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Wang, Alan Sent:
Monday, April 28, 2014 1:48 PM To:
SEITER, JEFFERY ALAN Cc:
Burkhardt, Janet
Subject:
Grand Gulf Nuclear Station Audit Plan Regarding Maximun Extended Load Line Limit Plus Amendment Request (TAC MF2798)
Attachments:
MELLLA Plus AUDIT PLAN.docx Jeff, By letter dated September 25, 2013 (Agencywide Document Access and Management System (ADAMS)
Accession No. ML13269A140), Entergy Operations Inc. (Entergy, the licensee) submitted a license amendment request (LAR) to allow Grand Gulf Nuclear Station, Unit No. 1 (GGNS) to operate in the expanded maximum extended load line limit analysis plus (MELLLA+) domain. During review of the amendment, the US Nuclear Regulatory Commission (NRC) staff identified several open items associated with the safety analyses that warrant resolution with an audit. As such the NRC staff and Entergy Operatiosn, Inc. agreed to an audit from April 23 to April 25, 2014, at General Electric Hitachi (GEH), in Wilmington, North Carolina. Attached is the NRC staffs proposed agenda for the audit. If you have any questions regarding the Audit Plan please let me know.
Alan Wang Project Manager (Grand Gulf Nuclear Station)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222
Hearing Identifier:
NRR_PMDA Email Number:
1251 Mail Envelope Properties (Alan.Wang@nrc.gov20140428134700)
Subject:
Grand Gulf Nuclear Station Audit Plan Regarding Maximun Extended Load Line Limit Plus Amendment Request (TAC MF2798)
Sent Date:
4/28/2014 1:47:52 PM Received Date:
4/28/2014 1:47:00 PM From:
Wang, Alan Created By:
Alan.Wang@nrc.gov Recipients:
"Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>
Tracking Status: None "SEITER, JEFFERY ALAN" <jseiter@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1127 4/28/2014 1:47:00 PM MELLLA Plus AUDIT PLAN.docx 23656 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
AUDIT PLAN MINIMUM STABLE FILM BOILING TEMPERATURE AND QUENCH MODELS ENTERGY OPERATIONS, INC GRAND GULF NUCLEAR STATION, UNIT 1 Purpose and Scope By letter dated September 25, 2013 (Agencywide Document Access and Management System (ADAMS) Accession No. ML13269A140), Entergy (the licensee) submitted a license amendment request for maximum extended load line limit analysis plus (MELLLA+). The proposed amendment request would allow operation in the expanded MELLLA+ domain.
During review of the amendment, the US Nuclear Regulatory Commission (NRC) identified several open items associated with the safety analyses that warrant resolution with an audit including:
Relevancy of supporting data for minimum stable film boiling temperature (Tmin) at high pressures.
Physical basis of the TRACG quench model.
Implementation of the Tmin and quench models in TRACG.
Audit Agenda The audit will take place from April 23 to April 25, 2014, at General Electric Hitachi (GEH), in Wilmington, North Carolina.
The staff audit will include reviews of the following areas:
Review of methodologies associated with the following:
o Recognition of Tmin supporting data at high pressures o Physical basis of the TRACG quench model o Implementation of the Tmin model in the TRACG code o Implementation of the quench model in the TRACG code Identification of any departures from an approved analysis method Assessment of adherence to NRC-approved methodology Assessment of compliance to NRC-accepted quality assurance processes related to code maintenance
Audit Team The audit team will consist of:
Tai Huang, Reactor Systems Branch Technical Reviewer, NRR Ashley Guzzetta, Reactor Systems Branch Technical Reviewer, NRR Christopher Jackson, Chief, Reactor Systems Branch, NRR Peter Yarsky, Senior Reactor Systems Engineer, RES In addition, the following will participate via WebEX; Steve Bajorek, Senior Technical Advisor for Thermal-Hydraulics, RES Alan Wang, Grand Gulf Project Manager, NRR (optional)
Jose March-Leuba, Contractor, Oak Ridge National Laboratory (optional)
The following support personnel are requested:
Licensing Staff from Entergy Operations Cognizant staff engineers from GEH (specifically thermal hydraulic code developers and analysts)
Documents Requested for Staff Examination The staff requests that documentation pertaining to the methodologies listed above be made available including:
TRACG Model Description Licensing Topical Report TRACG Qualification Licensing Topical Report Relevant test reports for referenced experimental data Associated Q/A review documents for pertinent TRACG model corrections and updates to include internal review documentation Access to design record files associated with TRACG Tmin and Quench models Logistical Considerations It is preferred if GEH can furnish staff to process searches in the design record files and retrieve documents from that system for staff review during the audit. Electronic searching would be preferred, such as by record number or key word. The following logistics are also requested:
Telephone available to call NRC Headquarters if necessary Private space for internal NRC staff discussion separate from the licensee or GEH staff A white board in the conference room to assist in discussion A projector and screen for presentations
Documentation of Audit Within 45 days of the audit, the NRC staff will prepare a detailed audit report documenting the information reviewed during the audit, and any open items identified as a result of the audit.
The NRC staff will also document its understanding of the proposed resolution of any identified open items. The audit report will be provided to the licensee in draft form for proprietary markup.