|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092K5471995-09-20020 September 1995 Revised Tech Spec Pages 4-31,4-32 & 4-33,incorporating Change in TS Section 4.4.1.5 ML20091L2911995-08-23023 August 1995 Proposed Tech Specs Page 6-11a,incorporating Ref to 10CFR20.1302 ML20087F4921995-08-11011 August 1995 Proposed TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements ML20085N1601995-06-22022 June 1995 Proposed Tech Specs Revising Replacement Pages in Package & Remove Outdated Pages,In Response to NRC Request for Addl Info ML20084L4351995-06-0101 June 1995 Proposed TS 5.3.1.1,describing Use of Advanced Clad Assemblies ML20084N3501995-06-0101 June 1995 Proposed Tech Specs,Deleting RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084B3361995-05-24024 May 1995 Proposed Tech Specs Re Change in Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7841995-05-17017 May 1995 Proposed Tech Specs,Consisting of Change Requests 252, Removing Chemical Addition Sys Requirements from TS to COLR ML20079A7811994-12-23023 December 1994 Proposed Tech Specs Page 3-32a ML20069A6781994-05-20020 May 1994 Proposed Tech Specs,Supporting Cycle 10 Control Rod Trip Insertion Time Testing ML20065M6831994-04-19019 April 1994 Proposed Tech Specs,Reflecting Deletion of Audit Program Frequency Requirements ML20065K0451994-04-11011 April 1994 Proposed Tech Specs Reflecting Relocation of Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR & Providing Direct Ref to Existing Tendon Surveillance Program ML20073C7731994-03-22022 March 1994 Proposed Tech Specs Re Control Rod Trip Insertion Time Testing 1999-09-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20198T4721997-12-31031 December 1997 TMI-1 Cycle 12 Startup Rept ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program 1999-09-01
[Table view] |
Text
~
METROPOLITAII EDISON COMPAIIY JERSEY CENTRAL POWER & LIGHT COMPMIY MID PEmiSYLVANIA ELECTRIC COMPA'IY TPREE MILE ISLAND NUCLEAR STATION UNIT 1 Cperating License No. DPR-50 Docket !!o. 50-289 Technical Stecification Chance Recuest No. h8 This Technical Specification Change Request is submitted in support of Licensee's request to change Appendix A to Operating License No. DPR-50 for Three Mile Island Nuclear Station Unit 1. As a part of this request, proposed replacement pages for Appendix A are also included.
METROPOLITAN EDISON CCMPANY 3 r, f Ey : CILw .
Vice ?-esident d
Sworn and subscribed to me this day of Y , 1977.
f Notary Pub fc 1479 252 4910290 b
UNITED STATES OF AMERICA NUCLEAR REGULATORY CCIC4ISSION IN THE MA' ITER OF ,
DOCKET NO. 50-289 LICENSE NO. DPR-50 METROPOLITAN EDISON COMPANY This is to certify that a copy of Technical Specification Change Request No. L8 to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, has, on the date given below, been filed with the U. S. Nuclear Regulatory Comission and been served on the chiet' executives of Londonderry Township, Dauphin County, Penncylvania und Dauphin County, Pennsylvania by deposit in the Uni ted States mail, addrecsed as follows:
Mr. Weldon 3. Arehart Mr. Harry B. Reese, Jr.
Board of Supervisors of Board of County Comissioners Londonderry Township of Dauphin County R. D. 51, Geyers Church Road Dauphin County Court House Middletown, Pennsylvania 17057 Earrisburg, Pennsylvania 17120 METROPOLITAN EDISON C0!'PANY By /s / R . C . Arnold Vice President Dated: February 18, lo~7 1479 253
'Ihree Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DRP-50 Docket No. 50-289 Technical Snecification Change Recuest No. h8 The licensee requests that the attached revised pages replace pages h-30 and L-3h.a of the existing Technical Specifications, Appendix A.
Reasons for Pronosed Change The reason for this proposed change is to revise the text of Technical Specification h.h.l.l.h.a to make it consistent with 10CFR50, Appendix J as it relates to Integrated Leakage Rate Tests pretest requirements.
Cafety Analysin Justifying Change This proposed change doec not involve any unreviewed safety questions in that the intent of the existing Technical Specifications will not be modified with the revision. The specifications will still be in conformance with the Integrated Leakage Rate Tests pretest requirements of 10CFR50, Appendix J.
1479 254
h.h.l.l.h Conduct of Tests
- 2. After the preliminary containment inspection, no repairs or adjustments shall be made unless the inspection uncovers deterioration which could significantly affect the structural integrity of the containment or which could be increased in severity during the performance of the test.
- b. The containment test pressure shall be allowed to stabilize for a period of not less than four hours prior to the start of a leakage rate test.
- c. The test duration shall be at least 2h hours unless experience from at least two prior tests provides evidence of the adequacy of a shorter test duration.
- d. Test accuracy shall be verified by supplementary means, such as measuring the quantity of air required to return to the starting point or by imposing a known leak rate to demonstrate the validity of meacurements.
- e. Closure of containment isolation valves for tne purpose of the test shall be accomplished by the means provided for normal operation of the valves without preliminary exercises or adjustment.
- f. Portions of the following fluid systems will be drained and vented to containment atmosphere prior to and during the integrated leakage rate tests:
- 1. Parts of the reactor coolant pressure boundary open directly to containment atmosphere under post acci$ent conditions. (become an extension of containment boundary)
- 2. Portions of closed systems inside containment that penetrate containment and rupture as a result of a loss of coolant accident.
I;0TE: Systems that are required to maintain the plant in a safe condition during the tests and systems that are normally filled with water and operating under post-accident conditions need not be vented. In addition, missile shielded lines outside the secondary shield will not be vented.
- g. The fluid block system shall be deactivated prior to and during the integrated leakage rate tests,
- h. All containment components normally pressurized by the penetration pressurization system shall be at atmospheric pressure during the integrated leakage rate tests.
s_,
1479 255
4.4.1 5 P.eacter Building Modifications Any major modification or replacement of components affecting the reactor building integrity shall be followed by either an integrated leak rate test or a icen1 leak test, as appropriate, and shall meet the acceptance criteria of h.h.l.1 5 and h.h.l.2 3, respectively.
Saces(l)
The reactor building is designed for an internal pressure of 55 psig and a stea=-air ~=ixture temperature of 231 F. Prior to initial operation, the containment vill be strength tested at 115 percent of design pressure and leak rate tested at the design pressure. The containment will also be leak tested prior to initial operation at approximately 50 percent of the design pressure.
These tests will verify that the leakege rate from reactor building pressurization satisfies the relationships given in the specifications.
The performance of periodic integrated and local leakage rate tests during the l Plant life provides a current assessment of potential leakage from the containment in case of an accident that would pressurice the interior of 'he containment.
In arder to provide a realiatic appraisal of the integrity of the contain=ent uncer accident conditions "as found" local leakage results =ust be documented for correction of the integrated leakage rate test results. Containment isolation valves are to be closed in the normal manner prior to local or integrated leakage rate tests.
The minimum test pressure of 27 5 psig for the periodic integrated leakage rate test is sufficiently high to provide an accurate =casurement of the Icakage rate and it duplicates the pre-operational leakage rate test at the raduced pressure. The specification provides a relationship for relating the measured leakage of air at the reduced pressure to the potential leakage of 55 poig. The minicus of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> was specified for the integrated leakage rate test to help stabill:e conditions and thus improve accuracy and to better evcluate data scatter. The frequency of the periodic integrated leakage rate test is keyed to the refueling schedule for the reactor, because these tests can best be performed during refueling shutdowns.
The specified frequency of periodic integrated leakage rate tests is based on three major considerations. First is the low probability of leaks in the liner, because of conformance of the ec=plete containment to a C.10 percent leakage rate at 55 psig during pre-operational testing and the absence of any significant stresses in the liner during reactor operation. Second is the more frequent testing, at design pressure, of those portions of the containment envelope that are =ost likely to develop leaks during reactor operatien (;enetrations and icolation valves which are not continuously pressurized by the penetration pressurizatien syste= or are not fluid blocked post-accident by the fluid block system) and the low value (0.06 percent) of leakage that is specified as acceptable frc= penetrations and isolation valves. Third is the tendon stress surveillance program which provides assurance that an important part of the structural integrity of the containment is maintained.
h-3ha 1479 256