MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARRS-11-124, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE142011-07-28028 July 2011 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE14 SVPLTR 09-0044, Day Response on Inadvertent Control Rod Withdrawal2009-09-21021 September 2009 Day Response on Inadvertent Control Rod Withdrawal SVPLTR 09-0027, Written Follow Up Report on Release of Radionuclide2009-07-0606 July 2009 Written Follow Up Report on Release of Radionuclide RS-08-073, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima22008-05-23023 May 2008 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima2 ML0216407762002-06-0707 June 2002 Offsite Dose Calculation Manual (OCDM) Required Action Not Met During Units 2/3 Main Chimney Particulate, Iodine, and Noble Gas Sampling System Inoperability ML17252A3201977-11-23023 November 1977 LER 77-047/03L-0 for Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation of T.S.1.0.CC.b Maximum Combined Interval Time by 3.5 Days for HPCI Monthly Valve and Pump Operability ML17252A2881977-05-0303 May 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-8 ML17252A2911977-04-22022 April 1977 License Event Report - Rod Withdrawal at Approx. 44% Power, Discovered Rod Block Monitor Channels 7 and 8 Automatically Bypassed ML17252A2901977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-10 ML17252A2711977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-9 ML17252A2721977-04-20020 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-7 ML17252A2751977-03-23023 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2821977-03-0202 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2581977-01-20020 January 1977 Transmittal of Reportable Occurrence Report No. 50-249/1976-36 ML17252A2701976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 IR 05000249/20190761976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 ML17252A2461976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-23 in Accordance with Technical Specifications, Section 6.6.B ML17252A2451976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-25 in Accordance with Technical Specifications, Section 6.6.B ML17252A2391976-10-22022 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-20 in Accordance with Technical Specifications, Section 6.6.B ML17252A2411976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-18 in Accordance with Technical Specifications, Section 6.6.B ML17252A2401976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-19 in Accordance with Technical Specifications, Section 6.6.B ML17252A2231976-10-12012 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-15 in Accordance with Technical Specifications, Section 6.6.B ML17252A2261976-09-30030 September 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-17 in Accordance with Technical Specifications, Section 6.6.B ML17252A2361976-07-0101 July 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-1 ML17252A2101976-02-0505 February 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-3 in Accordance with Technical Specifications, Section 6.6.B IR 05000249/19750361975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1761975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1711975-08-15015 August 1975 Report of A.O. Per Section 6.6.A of the Technical Specifications Isolation Condenser High Flow Sensor Setpoint Drift IR 05000249/19750321975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A1741975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A4471975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings IR 05000249/19750311975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings ML17252A7861975-03-27027 March 1975 Report of Abnormal Occurrence Per Section 6.6.a of the Technical Specification - Exceeding Set-point on Main Stream Line Hi Hi Rad ML17252A8271975-02-14014 February 1975 Report of Abnormal Occurrence Per Section 6.6.A of the Technical Specification - Reactor Feed Pump 3C Pump Casting Vent Line Weld Leak ML17252A8361975-01-14014 January 1975 Report of 4 Inch Recirculation Bypass Line Inspection 2011-07-28
[Table view] |
Text
8' Commonw.A. Edison Dresden Nucle~~er Station R.R. #1 Morris, Illinois 60450 Telephone 815/942-2920 BBS Ltr. #77-239 March 23, 1977 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations - Region I I I U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 (nclosed please find Reportable. Occurrence report number 50-249/1977-4.
This repo{t is being sub~itted to your office in a~cordance with the Dresden Nuclear Power Station Technical Specifications, Section 6.6.B.
BBS: j o Enclosure cc: Director of Inspection & Enforcement Director of Management Information & Program Cohtrol Fi le/NRC MAR 2 5 1977
LICENSEE EVENT REPORT CONtROL BLOCK:
,,,
l 1
eI I I . I 6I.** L s E PRINT AU REQUIRED 1NFORMA.T10NJ LICENSEE UC EN SE EVENT NAME LICENSE NUMBER TYPE TYPE
~l1 ILlolRlsl3I I oI o1-1 oI oI oI oI ol -1 o I o I l 4 I I I1 I 1 I1 I Io I 3 I 7 8 9 14 15 25 26 30 31 ~2
. REPORT~---REPORT CATEGORY TYPE. SOURCE OOCKET NUMBER . EVENT OA TE . REPORT DATE
@mcoN'T I I . L!:J lJ:J I oI s I oI _:_ I o 1- 2 I 4 l 9 I I oI 21 21 11 71 '71 1013121317171 7 .8 57. 58 '. _59 60 61 68 69 74 75 80*
EVENT DESCRIPTION * * -*
fol2l ~1--.,--D_u_r_in~g,._r_o_u_t_i_n_e__s_u_r_v_e_i~l_l_a_n_c_e__ te_s_t-'-in~g~,:..-.;.m_a_i_n__s_t_e_a_m_l_t_i_n_e__h~ig~h--f_l_o_w__i_s_o_l_a_t_i_o_n__ s_w_i_t_c_h____ __JI 7 . 8 9 80 lol3I '~--.-3-_2_6__1-~2_B__w_a_s__f_o_u_n_d__t_o_...t_r_i~p_a_t__1_1~7~*~5'-"p_s_i~.--i_n_c_r~e_a_s_i_ng.._~(T_e~c-h__S~p-e_c__l~i-m_i_t_:__**_1_1*~5_.~9_p~s--*i______JI 7 *8 9 80 9
i~l4J ~'~---~i~n=c~re=a~s-.....in~9-*-..w~h~i~c~h-....c~o~r~r~e=s~b=o~n=d=s._....to......_1~2~0~%..._.f~l~o~w~)~.--~R-e=d=u~n=da~n=t-.s~.~~~.~it.c~h~e~s;.....;:o_n;.....;:t_h~e-=-s~t~e~a~m--------.JJ 8l 10151,J I ine would have provided the required isolation had.an _anGal high-flow con-:-
7* .8 9~-------------.,..------------------------------------------..-..;.--------,_;;;._-------------------9-10 (Q]§J . ~I___. _d_i_t_io_n__o_c_c_u_r_r_e_d_.___T_h_i_s__i._s__n_o_t_a_...r_e~p_e_t_i_t_i_v_e__o_c_c_u_r_r_e_n_ce__* ___(5~0_-_2_4_9_/_1_9_7_7_-_4_)_.-------------11 7 8 9 PRIME . 80 SYSTEM COMPONENT COMPONENT CODE' SUPPLIER MANUFACTURER \/10LATl)N
@£] 1*c1 ol w43 44 I BI 0 I8I0I 47 I tY1 I 48 FACILITY METHOD OF STATUS " POWER OTHER STATUS DISCOVERY fill] Ll.J IQ I 4 I 3 I ~8 I ~ I NA 7 .8 9 10 12 13 44 45 46 80 FORM OF' ACTIVITY* CONTENT
- rn RELEASED OF RELEASE AMOUNT OF ACTIVITY
LzJ 9
W10
. 11I ~8. I, . .
44".,,:
~--~NA 45
.....-*_ _,_...___________ ___,I .
80 w.
8 PERSONNEL EXPOSURES
~ I ol ol ol L1J N 7 8 9 11 12 13 80 PERS'ONNEL INJURIES NUMBER OESCRIPTION ITEJ8 9*lol ol ol* ~-~~~N~A~~~~~~~~~~~~----~----'-----_..;...~~---~~
7 11 12 BO OFFSITE. CONSEQUENCES .
EE8 9 7
NA ao LOSS OR DAMAGE ..TO FACILITY
. TYPE OESCRIPTION .
(Ifilll.J .,_____N_A___________________________________,___________...__....____~
7 8 9 10 80 PUBLICITY
. 7EfZlB 9"-------.:.:.:..:--.-...;.
- -NA _____________________________,..__________________________________ ~----~B~O ADDITIONAL FACTORS
~
~*.
NA 7 8 9 80
.. ~.E; __--____G;;..*;._;L;;..;.__;_B.;.;;;o.;.;.;rn~b~a--_______________ PHONE: _ _E_x_t_._42 ........
- 1. - -
GPO 811t*eG7
CAUSE DESCRIPTION (Continued)
It is believed that the water originated from a leaking area cooler (Which has since been repaired) located above the jun~tion box.
The switch was cleaned and reset to trip at the correct setpoint. In addition, the cable penetr(~t~,Q~ri:from the junction box was sealed. Examina-tion of the hearby switches indicated that water in~leakage was limited to this particu~ar switch. DPIS 3-261-26 is a Barton model 278 unit with a range of 0 - 200 psig.